MB Western Industrial Contracting Co.: TxDOT bid record
MB Western Industrial Contracting Co. submitted 113 bids on Texas DOT contracts in the data, from 06 JAN 2022 to 05 MAR 2026, and was the low bidder on 10 of them (9%). When it was not low, its total sat a median +30% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $11,450,828
- Latest bid
- 05 MAR 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 10 | 4 | 40% |
| 2023 | 28 | 5 | 18% |
| 2024 | 33 | 0 | 0% |
| 2025 | 36 | 1 | 3% |
| 2026 | 6 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Houston District | 22 | 1 | 5% |
| Beaumont District | 12 | 1 | 8% |
| Austin District | 11 | 1 | 9% |
| Corpus Christi District | 9 | 2 | 22% |
| Yoakum District | 9 | 0 | 0% |
| Waco District | 7 | 0 | 0% |
| Paris District | 7 | 2 | 29% |
| Bryan District | 7 | 2 | 29% |
| Abilene District | 5 | 0 | 0% |
| Dallas District | 4 | 0 | 0% |
| Tyler District | 4 | 0 | 0% |
| Fort Worth District | 3 | 1 | 33% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 105 | 25 (24%) | $5,000.00 | $5,000.00 |
| TMA (stationary) | 505-7001 | DAY | 91 | 24 (26%) | $250.00 | $230.00 |
| TMA (mobile operation) | 505-7003 | DAY | 34 | 11 (32%) | $250.00 | $291.17 |
| Portable changeable message sign | 503-7001 | DAY | 48 | 10 (21%) | $100.00 | $100.00 |
| Portable changeable message sign | 503-7002 | EACH | 33 | 10 (30%) | $10,000 | $10,000 |
| Cem stabil BKFL | 400-7010 | CY | 26 | 10 (38%) | $185.00 | $200.00 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 41 | 7 (17%) | $5.00 | $1.40 |
| Removing concrete (riprap) | 104-7006 | SY | 21 | 7 (33%) | $50.00 | $25.00 |
| Riprap (mow strip)(4 in) | 432-7013 | CY | 28 | 6 (21%) | $658.00 | $643.00 |
| Flowable backfill | 401-7001 | CY | 24 | 5 (21%) | $471.00 | $350.00 |
| Crash cushion attenuator (move & reset) | 545-7002 | EACH | 17 | 5 (29%) | $2,500.00 | $1,535.40 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 45 | 4 (9%) | $2.00 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| SCR Civil Construction, LLC | 38 | 20 of 38 |
| Built Right Construction of Oklahoma, LLC | 29 | 10 of 29 |
| Garret Shields Infrastructure | 29 | 23 of 29 |
| Ragle Construction, Inc. | 23 | 12 of 23 |
| Icos Management, LLC | 22 | 10 of 22 |
| FNH Construction, LLC | 20 | 2 of 20 |
| Structural Integrity Group LLC | 17 | 13 of 17 |
| Texas Materials Group, Inc. | 14 | 9 of 14 |
| Isi Contracting, Inc. | 13 | 10 of 13 |
| Southern Road & Bridge, LLC | 13 | 5 of 13 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 MAR 2026 | A00193004 | Beaumont District | Hazard Elimination & Safety, FM 365 (US 90 to LNVA CANAL) | 3 of 3 | $1,958,236 | +73% |
| 04 MAR 2026 | A00193516 | Corpus Christi District | Hazard Elimination & Safety, US 181 (FM 351 to 0.6 miles S of BU 181J) | 7 of 7 | $2,903,068 | +85% |
| 04 FEB 2026 | A00203603 | Yoakum District | Bridge Maintenance, Various (DISTRICTWIDE to ALL COUNTIES) | 10 of 12 | $3,234,384 | +38% |
| 06 JAN 2026 | A00128039 | Houston District | Remove/Replace Bridge Rail, IH 610 (At Broad Street to .) | 7 of 7 | $4,707,067 | +51% |
| 06 JAN 2026 | A00198367 | Yoakum District | Rehabilitate Existing Roadway, FM 1160 (0.07 Mi S of FM 1300 W to 0.28 Mi N of FM 1300 W) | 7 of 7 | $3,148,997 | +66% |
| 06 JAN 2026 | A00211861 | Bryan District | Bridge Maintenance, BS 6S (BS 6 NB to at SH 6 SB) | 5 of 8 | $3,426,495 | +21% |
| 02 JUL 2025 | A00200564 | Corpus Christi District | Bridge Maintenance, PR 22 (0.7 MI E OF SH 358 to 4.35 MI E OF SH 358) | 4 of 7 | $2,480,961 | +41% |
| 01 JUL 2025 | A00193596 | Houston District | Hazard Elimination & Safety, US 90 (East of SL 8 to Liberty County Line) | 6 of 8 | $3,806,624 | +31% |
| 01 JUL 2025 | A00209975 | Bryan District | Construct Pedestrian Infrastructure, HOLLEMAN DR (0.1 Mi W of BS 6R to 0.2 Mi W of BS 6R) | 1 of 4 | $89,848 | Low, 45% under the second |
| 01 JUL 2025 | A00197100 | Beaumont District | Bridge Maintenance, US 90 (@ HILLEBRANDT BAYOU to STR#20-124-0-0028-07-044) | 5 of 9 | $7,370,558 | +43% |
| 13 MAY 2025 | A00213834 | Houston District | BRIDGE DECK REPAIR, US0290 (Various Highways in Waller County to Various Highways in Waller County) | 4 of 6 | $863,000 | +11% |
| 06 MAY 2025 | A00207878 | Yoakum District | EROSION REPAIR, SH0097 (Gonzales, Calhoun, Colorado, Fayette, to Lavaca, Victoria, and Wharton Counties) | 5 of 5 | $569,925 | +47% |
| 02 MAY 2025 | A00177444 | Waco District | Hazard Elimination & Safety, SH 195 (.7 Mi S of FM 2670 to Williamson County Line) | 4 of 7 | $5,651,255 | +15% |
| 02 MAY 2025 | A00193518 | Corpus Christi District | Hazard Elimination & Safety, SH 44 (SH 358 to 0.5 mi West of International Dr) | 5 of 6 | $594,881 | +42% |
| 01 MAY 2025 | A00212188 | Corpus Christi District | Hazard Elimination & Safety, US 181 (Bee Co. Line to FM 3089) | 5 of 8 | $696,836 | +19% |
| 04 APR 2025 | A00196770 | Yoakum District | Hazard Elimination & Safety, US 90 (FM 1680 to Fayette C/L) | 4 of 7 | $6,278,626 | +17% |
| 04 APR 2025 | A00197887 | Beaumont District | Hazard Elimination & Safety, FM 1130 (FM 1136, EAST to 4.24 MILES) | 3 of 5 | $4,791,331 | +22% |
| 04 APR 2025 | A00131128 | Houston District | Install/Upgrade Drainage Structure(S), FM 1097 (At Atkins Creek to .) | 5 of 8 | $3,892,240 | +11% |
| 04 APR 2025 | A00212191 | Waco District | Bridge Maintenance, Various (Various to Various) | 8 of 12 | $3,974,305 | +30% |
| 04 APR 2025 | A00198507 | Houston District | Rehabilitate Bridge, IH 45 (At Spring Creek to .) | 4 of 6 | $1,439,395 | +49% |
| 03 APR 2025 | A00201408 | Lufkin District | Bridge Maintenance, US 59 (At White Oak Creek to .) | 4 of 7 | $916,228 | +60% |
| 03 APR 2025 | A00192959 | Beaumont District | Hazard Elimination & Safety, SH 62 (0.398 MI N OF FM 1078 to 0.1 MI N OF FM 1078) | 5 of 6 | $622,985 | +123% |
| 03 APR 2025 | A00134325 | Beaumont District | Install/Replace Signs, Various (DISTRICTWIDE to .) | 2 of 5 | $228,565 | +15% |
| 03 APR 2025 | A00200688 | Tyler District | Bridge Maintenance, Various (Various Locations to in the Tyler District) | 4 of 7 | $4,544,831 | +27% |
| 05 MAR 2025 | A00213863 | Maintenance Division District | Travel Information Center, IH0010 (Orange County Travel Information Center to Orange County Travel Information Center) | 3 of 6 | $1,050,000 | +26% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.