TxDOT contract A00212191 bid tabulation
Bridge Maintenance, Various (Various to Various). Let by Texas DOT on April 4, 2025, McLennan, Waco District. 12 bids received; low bid $3,067,458 by Icos Management, LLC, +11% against the engineer's estimate of $2,769,436.
- Owner
- Texas DOT
- Letting
- 04 APR 2025
- Pay items
- 38
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Icos Management, LLC | $3,067,458 | Low | +11% |
| 2 | Scott Tucker Construction Company, LLC | $3,122,086 | +2.0% | +13% |
| 3 | BK Field Operations LLC | $3,495,942 | +14% | +26% |
| 4 | Structural Integrity Group LLC | $3,624,445 | +18% | +31% |
| 5 | Scout 5 Construction LLC | $3,837,009 | +25% | +39% |
| 6 | Southern Road & Bridge, LLC | $3,933,993 | +28% | +42% |
| 7 | MPB, Inc. | $3,936,710 | +28% | +42% |
| 8 | MB Western Industrial Contracting Co. | $3,974,305 | +30% | +44% |
| 9 | Ragle Construction, Inc. | $4,146,890 | +35% | +50% |
| 10 | Built Right Construction of Oklahoma, LLC | $4,171,045 | +36% | +51% |
| 11 | Cross Plus Construction, LLC | $4,417,431 | +44% | +60% |
| 12 | SCR Civil Construction, LLC | $4,540,778 | +48% | +64% |
Engineer's estimate: $2,769,436.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Icos Management, LLC | 2. Scott Tucker Construction Company, LLC | 3. BK Field Operations LLC | 4. Structural Integrity Group LLC | 5. Scout 5 Construction LLC | 6. Southern Road & Bridge, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 3 | $5,000.00 | $8,000.00 | $9,936.00 | $15,000 | $1,500.00 | $3,000.00 | $4,500.00 |
| 2 | Flowable backfill (401-7001) | CY | 54 | $750.00 | $1,200.00 | $917.00 | $750.00 | $672.00 | $300.00 | $1,850.00 |
| 3 | Class C concrete (column encasement) (420-7064) | CY | 11 | $500.00 | $6,500.00 | $5,286.00 | $3,000.00 | $850.00 | $205.00 | $10,500 |
| 4 | Penetrating concrete surface treatment (428-7001) | SY | 3,697 | $10.00 | $24.00 | $61.00 | $29.00 | $27.50 | $10.00 | $24.00 |
| 5 | Concrete structure repair(clean & coat WTH epoxy) (429-7001) | SF | 710 | $150.00 | $180.00 | $101.00 | $140.00 | $85.00 | $150.00 | $205.00 |
| 6 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 665 | $250.00 | $240.00 | $210.00 | $120.00 | $150.00 | $150.00 | $434.00 |
| 7 | Concrete structure repair (standard) (429-7009) | SF | 140 | $200.00 | $200.00 | $169.00 | $200.00 | $125.00 | $150.00 | $454.00 |
| 8 | Riprap (stone protection)(18 in) (432-7043) | CY | 74 | $220.00 | $320.00 | $430.00 | $210.00 | $265.00 | $350.00 | $325.00 |
| 9 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 1,623 | $50.00 | $80.00 | $53.00 | $45.00 | $52.75 | $40.00 | $44.00 |
| 10 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 120 | $50.00 | $80.00 | $48.00 | $45.00 | $66.00 | $100.00 | $195.00 |
| 11 | STR steel (miscellaneous non-bridge) (442-7007) | LB | 416 | $25.00 | $80.00 | $21.00 | $30.00 | $40.00 | $25.00 | $48.00 |
| 12 | Mobilization (500-7001) | LS | 1 | $245,000 | $300,000 | $312,233 | $120,000 | $310,000 | $300,000 | $300,000 |
| 13 | Barricades, signs and traffic handling (502-7001) | MO | 18 | $5,000.00 | $6,000.00 | $8,478.00 | $10,000 | $7,500.00 | $0.01 | $9,500.00 |
| 14 | Portable changeable message sign (503-7002) | EACH | 2 | $10,000 | $25,000 | $19,979 | $7,500.00 | $8,500.00 | $30,000 | $16,500 |
| 15 | TMA (stationary) (505-7001) | DAY | 270 | $200.00 | $100.00 | $349.00 | $1.00 | $1.00 | $0.01 | $50.00 |
| 16 | TMA (mobile operation) (505-7002) | HR | 1,080 | $50.00 | $1.00 | $67.00 | $1.00 | $1.00 | $0.01 | $25.00 |
| 17 | Driftwood removal (735-7060) | CY | 237 | $250.00 | $150.00 | $228.00 | $100.00 | $395.00 | $100.00 | $225.00 |
| 18 | Replace(steel rail) (776-7024) | LF | 50 | $250.00 | $600.00 | $339.00 | $250.00 | $60.00 | $300.00 | $195.00 |
| 19 | Rep steel bridge member (beam) (784-7002) | EACH | 4 | $20,000 | $30,000 | $2,386.00 | $25,000 | $26,900 | $30,000 | $18,500 |
| 20 | Steel bridge zone painting ref STR #1 (4010-7002) | EACH | 1 | $59,926 | $70,000 | $44,626 | $80,000 | $79,750 | $95,000 | $115,000 |
| 21 | Steel bridge zone painting ref STR #2 (4010-7003) | EACH | 1 | $24,700 | $28,000 | $23,184 | $42,900 | $42,515 | $60,000 | $50,000 |
| 22 | Steel bridge zone painting ref STR #3 (4010-7004) | EACH | 1 | $66,196 | $70,000 | $69,767 | $115,115 | $114,730 | $130,000 | $85,000 |
| 23 | Steel bridge zone painting ref STR #4 (4010-7005) | EACH | 1 | $73,340 | $75,000 | $72,609 | $159,225 | $158,840 | $200,000 | $131,240 |
| 24 | Steel bridge zone painting ref STR #5 (4010-7006) | EACH | 1 | $214,548 | $215,000 | $244,184 | $310,530 | $310,145 | $350,000 | $240,000 |
| 25 | Steel bridge zone painting ref STR #6 (4010-7007) | EACH | 1 | $54,720 | $60,000 | $92,209 | $102,960 | $102,575 | $120,000 | $98,000 |
| 26 | Steel bridge zone painting ref STR #7 (4010-7008) | EACH | 1 | $80,978 | $80,000 | $109,651 | $152,366 | $151,982 | $180,000 | $145,000 |
| 27 | Steel bridge zone painting ref STR #8 (4010-7009) | EACH | 1 | $66,348 | $70,000 | $79,767 | $124,839 | $124,454 | $150,000 | $100,000 |
| 28 | Steel bridge zone painting ref STR #9 (4010-7010) | EACH | 1 | $59,812 | $70,000 | $49,726 | $112,541 | $112,156 | $135,000 | $100,000 |
| 29 | Steel bridge zone painting ref STR #10 (4010-7011) | EACH | 1 | $12,578 | $25,000 | $26,884 | $36,410 | $36,025 | $60,000 | $44,000 |
| 30 | Steel bridge zone painting ref STR #11 (4010-7012) | EACH | 1 | $302,860 | $300,000 | $299,068 | $438,350 | $437,965 | $460,000 | $320,000 |
| 31 | Steel bridge zone painting ref STR #12 (4010-7014) | EACH | 1 | $87,248 | $90,000 | $102,951 | $164,164 | $163,779 | $200,000 | $145,000 |
| 32 | Steel bridge zone painting ref STR #13 (4010-7015) | EACH | 1 | $138,130 | $140,000 | $164,534 | $239,910 | $239,525 | $260,000 | $225,000 |
| 33 | Steel bridge zone painting ref STR #14 (4010-7016) | EACH | 1 | $74,708 | $70,000 | $59,467 | $126,340 | $125,956 | $155,000 | $125,000 |
| 34 | Steel bridge zone painting ref STR #15 (4010-7017) | EACH | 1 | $38,608 | $50,000 | $52,884 | $83,820 | $83,435 | $110,000 | $70,000 |
| 35 | Steel bridge zone painting ref STR #16 (4010-7018) | EACH | 1 | $28,842 | $40,000 | $24,084 | $50,600 | $50,215 | $65,000 | $50,000 |
| 36 | Steel bridge zone painting ref STR #17 (4010-7019) | EACH | 1 | $23,370 | $30,000 | $32,484 | $62,617 | $62,233 | $90,000 | $45,000 |
| 37 | Steel bridge zone painting ref STR #18 (4010-7020) | EACH | 1 | $51,224 | $60,000 | $64,884 | $50,737 | $50,353 | $75,000 | $95,000 |
| 38 | Bent cap/abutment cap cleaning (7001-7002) | EACH | 92 | $2,000.00 | $1,000.00 | $292.00 | $550.00 | $555.00 | $200.00 | $1,250.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.