Scott Tucker Construction Company, LLC: TxDOT bid record

Scott Tucker Construction Company, LLC submitted 101 bids on Texas DOT contracts in the data, from 07 MAY 2020 to 19 NOV 2026, and was the low bidder on 12 of them (12%). When it was not low, its total sat a median +26% above the low bid.

Owner
Texas DOT
Low bid volume
$19,607,698
Latest bid
19 NOV 2026
Data through
19 NOV 2026
101Bids
12Low bids
12Win rate, percent
+26%Median gap to the low bid when not low, 89 bids

By year

YearBidsLow bidsWin rate
2020500%
202115320%
2022600%
20237114%
202411218%
202521210%
202636411%
Scott Tucker Construction Company, LLC, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Fort Worth District24313%
Brownwood District1218%
Childress District10220%
Wichita Falls District800%
Odessa District8225%
San Angelo District700%
Abilene District7114%
Tyler District500%
Bryan District3133%
Lufkin District200%
Dallas District2150%
Lubbock District200%
Scott Tucker Construction Company, LLC, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Barricades, signs and traffic handling502-7001MO9712 (12%)$7,632.00$5,000.00
Concrete structure repair (vertical & overhead)429-7007SF548 (15%)$174.50$220.00
Concrete structure repair(clean & coat WTH epoxy)429-7001SF208 (40%)$109.00$195.00
Armor joint (sealed)454-7003LF118 (73%)$99.00$150.00
Preparing row100-7002STA297 (24%)$3,393.00$2,750.00
Biodegradable erosion control logs (install) (12")506-7044LF156 (40%)$6.00$6.00
Temporary sediment control fence (remove)506-7041LF395 (13%)$2.00$1.00
Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI)658-7019EACH215 (24%)$30.00$35.00
Concrete structure repair (standard)429-7009SF115 (45%)$170.00$210.00
Cem stabil BKFL400-7010CY274 (15%)$252.00$200.00
Riprap (stone protection)(24 in)432-7045CY254 (16%)$234.00$217.00
Temporary special shoring403-7001SF134 (31%)$54.00$35.73
Scott Tucker Construction Company, LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Scott Tucker Construction Company, LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
19 NOV 2026A00224304Odessa DistrictBRIDGE REPAIR, IH0020 (VARIOUS to VARIOUS)4 of 4$912,950+36%
10 NOV 2026A00219095Odessa DistrictMISCELLANEOUS CONCRETE REPAIR, IH0020 (VARIOUS to VARIOUS)3 of 3$288,914+5.0%
04 NOV 2026A00223826Childress DistrictBRIDGE PREVENTATIVE MAINTENANCE, US0287 (Various Locations ~ See Plans to Various Locations ~ See Plans)8 of 16$992,803+41%
03 NOV 2026A00204003Bryan DistrictBridge Replacement, COUNTY ROAD 244 (ON CR 244 (FCR 344) to AT DEEP CREEK)12 of 15$911,850+26%
03 NOV 2026A00223831Childress DistrictBRIDGE PREVENTATIVE MAINTENANCE, US0287 (Various Locations ~ See Plans to Various Locations ~ See Plans)5 of 15$1,022,354+29%
13 OCT 2026A00224304Odessa DistrictBRIDGE REPAIR, IH0020 (VARIOUS to VARIOUS)4 of 5$994,015+63%
07 OCT 2026A00222466Brownwood DistrictBRIDGE PREVENTATIVE MAINTENANCE, FM0581 (VARIOUS to VARIOUS)4 of 9$954,313+33%
06 OCT 2026A00220460Brownwood DistrictBRIDGE PREVENTATIVE MAINTENANCE, SH0016 (DISTRICT-WIDE to DISTRICT-WIDE)3 of 11$961,691+32%
29 SEP 2026A00223850San Angelo DistrictCULVERT REPAIR, FM 2169 (FM 2169 AT SOUTH LLANO RIVER CROSSING to FM 2169 AT SOUTH LLANO RIVER CROSSING)4 of 5$398,810+73%
22 SEP 2026A00218207Abilene DistrictBRIDGE PREVENTATIVE MAINTENANCE, BI0020R (VARIOUS LOCATIONS to IN THE ABILENE DISTRICT)8 of 12$936,075+37%
16 SEP 2026A00222875Tyler DistrictCONCRETE SPALL REPAIR, US0080 (Various Locations in to the Tyler District)7 of 8$1,216,200+82%
10 SEP 2026A00221261San Angelo DistrictBRIDGE PREVENTATIVE MAINTENANCE, US0377 (VARIOUS LOCATIONS IN SAN ANGELO DISTRICT to VARIOUS LOCATIONS IN SAN ANGELO DISTRICT)10 of 10$959,451+113%
03 SEP 2026A00221262San Angelo DistrictBRIDGE PREVENTATIVE MAINTENANCE, SH0208 (VARIOUS LOCATIONS IN SAN ANGELO DISTRICT to VARIOUS LOCATIONS IN SAN ANGELO DISTRICT)8 of 11$1,657,733+20%
03 SEP 2026A00207389Childress DistrictBridge Replacement, FM 1547 (@ Buck Creek to .)3 of 7$3,790,406+26%
02 SEP 2026A00206056Wichita Falls DistrictConstruct Pedestrian Infrastructure, BU 287J (City View Dr to SL 11 WFR)6 of 7$1,209,040+17%
11 AUG 2026A00221935Odessa DistrictMISCELLANEOUS CONCRETE REPAIR, IH0020 (VARIOUS to VARIOUS)1 of 2$1,037,872Low, 18% under the second
06 AUG 2026A00214454Fort Worth DistrictBridge Replacement, COUNTY ROAD 1590 (AT BIG SANDY CREEK to .)4 of 8$1,013,241+5.0%
05 AUG 2026A00213321Fort Worth DistrictInstall Illumination, US 281 (FM 3027 to FM 3027)5 of 10$230,588+27%
05 AUG 2026A00132718Fort Worth DistrictBridge Replacement, IH 35W (North of Woodbine Dr to South of CR 530B)5 of 8$3,360,054+20%
05 AUG 2026A00065091Fort Worth DistrictBridge Replacement, DENNIS RD (DENNIS ROAD AT PATRICK CREEK to .)2 of 10$1,755,898+15%
02 JUL 2026A00213157Wichita Falls DistrictBridge Maintenance, US 281 (At SH 79 SB / FM 369 WB Connector to .)9 of 10$2,277,957+33%
03 JUN 2026A00214818Bryan DistrictBridge Maintenance, SH 75 (At N Bedias Creek to .)4 of 7$344,660+85%
12 MAY 2026A00220166Bryan DistrictBRIDGE PREVENTATIVE MAINTENANCE, SH0036 (At Second Davidson Creek to At Brushy Creek)1 of 5$612,294Low, 61% under the second
07 MAY 2026A00207724Abilene DistrictBridge Maintenance, US 83 (US 83 SB to @ BU 84 UPRR)9 of 14$5,100,340+27%
06 MAY 2026A00211596Childress DistrictBridge Maintenance, US 83 (US 83 SB @ Salt Fork of Red River to .)12 of 13$3,403,402+42%
Scott Tucker Construction Company, LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy