TxDOT contract A00207724 bid tabulation
Bridge Maintenance, US 83 (US 83 SB to @ BU 84 UPRR). Let by Texas DOT on May 7, 2026, Taylor, Abilene District. 14 bids received; low bid $4,004,004 by The Truesdell Corporation, -33% against the engineer's estimate of $5,992,792.
- Owner
- Texas DOT
- Letting
- 07 MAY 2026
- Pay items
- 31
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | The Truesdell Corporation | $4,004,004 | Low | -33% |
| 2 | Gibson & Associates, Inc. | $4,165,432 | +4.0% | -30% |
| 3 | Ragle Construction, Inc. | $4,206,128 | +5.0% | -30% |
| 4 | Blacksmith Ventures LLC | $4,239,303 | +6.0% | -29% |
| 5 | MPB, Inc. | $4,389,567 | +10% | -27% |
| 6 | Built Right Construction of Oklahoma, LLC | $4,417,691 | +10% | -26% |
| 7 | Garret Shields Infrastructure | $4,763,758 | +19% | -21% |
| 8 | Structural Integrity Group LLC | $4,889,399 | +22% | -18% |
| 9 | Scott Tucker Construction Company, LLC | $5,100,340 | +27% | -15% |
| 10 | Premier Contractors LLC | $5,257,325 | +31% | -12% |
| 11 | Pathfield Investments LLC | $5,355,257 | +34% | -11% |
| 12 | Myers & Sons Construction LLC | $5,492,019 | +37% | -8.0% |
| 13 | Ti-Zack Concrete, LLC | $5,608,891 | +40% | -6.0% |
| 14 | Southern Road & Bridge, LLC | $7,360,057 | +84% | +23% |
Engineer's estimate: $5,992,792.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. The Truesdell Corporation | 2. Gibson & Associates, Inc. | 3. Ragle Construction, Inc. | 4. Blacksmith Ventures LLC | 5. MPB, Inc. | 6. Built Right Construction of Oklahoma, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Planing asphalt concrete pavement(0" to 4") (354-7034) | SY | 4,600 | $10.00 | $9.00 | $18.78 | $7.50 | $13.25 | $10.50 | $20.00 |
| 2 | Flowable backfill (401-7001) | CY | 20 | $500.00 | $650.00 | $800.00 | $400.00 | $500.00 | $545.00 | $500.00 |
| 3 | Penetrating concrete surface treatment (428-7001) | SY | 5,790 | $18.00 | $16.00 | $17.60 | $16.50 | $8.00 | $18.00 | $16.00 |
| 4 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 4,100 | $150.00 | $150.00 | $175.00 | $125.00 | $175.00 | $80.00 | $250.00 |
| 5 | Riprap (stone protection)(12 in) (432-7041) | CY | 10 | $300.00 | $500.00 | $360.00 | $200.00 | $665.00 | $275.00 | |
| 6 | Elastomeric bearing (laminated) (434-7002) | EACH | 26 | $5,000.00 | $1,200.00 | $2,000.00 | $350.00 | $2,000.00 | $1,120.00 | $1,000.00 |
| 7 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 1,010 | $50.00 | $65.00 | $78.50 | $23.00 | $42.00 | $36.00 | $55.00 |
| 8 | Polyester polymer concrete overlay (3/4") (439-7015) | SY | 6,200 | $88.00 | $101.50 | $105.00 | $99.00 | $105.00 | $100.00 | |
| 9 | Polyester polymer concrete overlay (3") (439-7019) | SY | 5,500 | $400.00 | $257.00 | $200.00 | $265.00 | $286.00 | $345.00 | $250.00 |
| 10 | STR steel (pedestal) (442-7010) | LB | 4,200 | $20.00 | $10.50 | $12.00 | $10.00 | $25.00 | $11.50 | $15.00 |
| 11 | Clean and paint existing STR (ref no. 1) (446-7020) | EACH | 1 | $320,000 | $330,000 | $350,000 | $275,000 | $336,000 | $300,000 | |
| 12 | Clean and paint existing STR (ref no. 2) (446-7021) | EACH | 1 | $30,000 | $30,800 | $100,000 | $50,000 | $31,360 | $60,000 | |
| 13 | Header type expansion joint (454-7009) | CF | 80 | $500.00 | $650.00 | $475.00 | $400.00 | $525.00 | $650.00 | |
| 14 | Joint sealant (454-7010) | LF | 168 | $75.00 | $56.00 | $25.00 | $42.00 | $17.00 | $55.00 | |
| 15 | Shot blasting (483-7016) | SY | 11,700 | $5.00 | $3.00 | $4.85 | $3.00 | $6.00 | $22.00 | $4.00 |
| 16 | Raising existing struct (495-7001) | LS | 1 | $50,000 | $89,000 | $121,250 | $85,000 | $80,000 | $134,400 | $75,000 |
| 17 | Mobilization (500-7001) | LS | 1 | $544,028 | $410,645 | $400,000 | $410,000 | $225,000 | $285,000 | $202,000 |
| 18 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $20,000 | $3,400.00 | $27,000 | $25,000 | $1.00 | $8,250.00 | $6,000.00 |
| 19 | Portable changeable message sign (503-7002) | EACH | 7 | $10,000 | $3,500.00 | $3,200.00 | $3,500.00 | $13,000 | $2,400.00 | $2,200.00 |
| 20 | TMA (stationary) (505-7001) | DAY | 146 | $375.00 | $380.00 | $360.00 | $325.00 | $345.00 | $100.00 | $300.00 |
| 21 | TMA (mobile operation) (505-7003) | DAY | 5 | $300.00 | $500.00 | $750.00 | $700.00 | $10,000 | $250.00 | $300.00 |
| 22 | Reflectorized pavement marking type III (W)(6")(solid) (666-7236) | LF | 1,757 | $3.00 | $3.50 | $3.30 | $3.00 | $3.00 | $2.00 | $4.00 |
| 23 | Reflectorized pavement marking type III (W)(6")(broken) (666-7237) | LF | 2,087 | $4.00 | $3.50 | $3.30 | $3.00 | $3.00 | $2.50 | $4.00 |
| 24 | Reflectorized pavement marking type III (W)(12")(DOT) (666-7243) | LF | 1,222 | $2.00 | $5.50 | $5.50 | $5.00 | $5.00 | $2.00 | $6.00 |
| 25 | Reflectorized pavement marking type III (Y)(6")(solid) (666-7248) | LF | 1,757 | $3.00 | $3.50 | $3.30 | $3.00 | $3.00 | $2.00 | $4.00 |
| 26 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 25 | $20.00 | $27.00 | $27.50 | $25.00 | $25.00 | $2.00 | $30.00 |
| 27 | Drain inlet cleaning (764-7001) | EACH | 16 | $250.00 | $400.00 | $450.00 | $1.00 | $160.00 | $1,500.00 | |
| 28 | Concrete CRCK repair(discrete)(rout and seal) (780-7003) | LF | 200 | $41.00 | $35.00 | $25.00 | $75.00 | $45.00 | $100.00 | |
| 29 | CNC crack repair (discrete)(surface seal) (780-7004) | LF | 265 | $100.00 | $41.00 | $30.00 | $25.00 | $75.00 | $45.00 | $85.00 |
| 30 | Rep steel bridge member (bearings) (784-7008) | EACH | 26 | $4,000.00 | $1,200.00 | $100.00 | $1,000.00 | $1.00 | $1.00 | $3,000.00 |
| 31 | Bent cap/abutment cap cleaning (7001-7002) | EACH | 33 | $1,000.00 | $425.00 | $300.00 | $850.00 | $825.00 | $350.00 | $1,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.