TxDOT letting results, May 7, 2026
45 contracts let by Texas DOT on May 7, 2026, $420,434,134 in low bids, a median of 5 bidders per contract. On the 45 with an engineer's estimate, the low bid came in under it 36 times; median low bid -14% against the estimate.
- Owner
- Texas DOT
- Contracts
- 45
- Low bids, total
- $420,434,134
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00031457 | Highway Improvement, IH 410 (At US 281/San Pedro to .) | San Antonio District | 3 | Webber, LLC | $155,584,592 | $156,147,924 | 0.0% | +11% | TxDOT |
| A00183308 | Interstate Designation, US 281 (7.4 Miles North of SH 186 to 3.9 Miles North of SH 186) | Pharr District | 5 | Ioc Company LLC | $62,131,044 | $63,645,399 | +2.0% | -16% | TxDOT |
| A00132253 | Ferry Operation Projects, SH 361 (AT FERRY LANDINGS ON HARBOR ISLAND to .) | Corpus Christi District | 4 | Russell Marine, LLC | $41,937,000 | $45,629,054 | +9.0% | -4.0% | TxDOT |
| A00189674 | Preventive Maintenance, IH 35 (FM 133 (NB/SBML) to 0.287 MI SOUTH OF FM 3408) | Laredo District | 4 | Hunter Industries, LTD. | $24,814,865 | $25,131,233 | +1.0% | -10% | TxDOT |
| A00109269 | Widen Road - Add Lanes, FM 676 (SH 107 to TAYLOR RD.) | Pharr District | 6 | Texas Cordia Construction, LLC | $24,782,061 | $26,656,017 | +8.0% | -26% | TxDOT |
| A00187130 | Rehabilitate Existing Roadway, FM 1150 (FM 1104 to SH 80) | San Antonio District | 4 | Hunter Industries, LTD. | $14,244,558 | $15,335,099 | +8.0% | -28% | TxDOT |
| A00141254 | Rehabilitate Existing Roadway, IH 35E (IH 20 to Ann Arbor Ave.) | Dallas District | 3 | Altus Construction LLC | $11,542,446 | $11,682,457 | +1.0% | -12% | TxDOT |
| A00183655 | Roadway Rehabilitation/Reconstruction With No Added Capacity, FM 179 (South of US 62 to LP 88 (FM 1585)) | Lubbock District | 6 | A. L. Helmcamp, Inc. | $9,632,448 | $11,395,000 | +18% | -6.0% | TxDOT |
| A00130461 | Transportation Non-Roadway, IH 30 (1.6 Mi W of US 67, WB to 1.0 Mi W of US 67, WB) | Atlanta District | 6 | East Texas Bridge, Inc. | $9,498,729 | $10,553,425 | +11% | -16% | TxDOT |
| A00193137 | Hazard Elimination & Safety, US 59 (Nacogdoches City Limits to Angelina River) | Lufkin District | 3 | Texas Materials Group, Inc. | $5,689,159 | $6,333,343 | +11% | -8.0% | TxDOT |
| A00206487 | Hazard Elimination & Safety, FM 521 (FM 2540 to FM 457) | Yoakum District | 5 | Matagorda Construction & Materials | $5,637,915 | $6,049,442 | +7.0% | +26% | TxDOT |
| A00219911 | MILL AND INLAY, IH0035E (Crown Rd to FM2181) | Dallas District | 3 | Jagoe-Public Company | $5,633,586 | $5,988,837 | +6.0% | -3.0% | TxDOT |
| A00207724 | Bridge Maintenance, US 83 (US 83 SB to @ BU 84 UPRR) | Abilene District | 14 | The Truesdell Corporation | $4,004,004 | $4,165,432 | +4.0% | -33% | TxDOT |
| A00208023 | Rehabilitate Bridge, IH 45 (At McKinney Ramp to .) | Houston District | 8 | MC2 Civil, LLC | $3,899,831 | $4,350,329 | +12% | -56% | TxDOT |
| A00195501 | Rehabilitate Existing Roadway, US 82 (Kemp Blvd to US 287 (Frontage roads only)) | Wichita Falls District | 5 | O. Trevino Construction, LLC | $3,670,513 | $3,934,949 | +7.0% | -8.0% | TxDOT |
| A00184443 | Intersection Improvement, SH 75 (0.5 miles north of FM 2296 to 0.5 miles south of FM 2296) | Bryan District | 5 | Big Creek Construction, LTD. | $2,980,129 | $3,123,380 | +5.0% | +13% | TxDOT |
| A00133189 | Resurface Roadway, US 259 (SH 204 to FM 698) | Lufkin District | 6 | Madden Contracting Company, LLC. | $2,886,840 | $3,012,914 | +4.0% | -5.0% | TxDOT |
| A00210343 | Bicycle And Pedestrian Improvements, Various (Various Locations along SH 78 to In the Dallas District) | Dallas District | 8 | Garret Shields Infrastructure | $2,678,695 | $2,725,664 | +2.0% | -16% | TxDOT |
| A00193351 | Hazard Elimination & Safety, BU 54A (HONDO PASS DR to RUTHERFORD DR) | El Paso District | 3 | International Eagle Enterprises, Inc. | $2,479,055 | $2,759,000 | +11% | -17% | TxDOT |
| A00212586 | Hazard Elimination & Safety, Various (VARIOUS LOCATIONS COUNTYWIDE to .) | Beaumont District | 4 | TRP Infrastructure Services, LLC | $2,407,664 | $2,662,570 | +11% | -16% | TxDOT |
| A00217203 | MILL AND INLAY, SH0006 (Hearne to Calvert) | Bryan District | 5 | Lone Star Paving Company | $2,266,508 | $2,287,353 | +1.0% | -19% | TxDOT |
| A00215811 | Resurface Roadway, SL 8 (West of Hardy St. to 0.2 Mi East of Aldine Westfield Rd.) | Houston District | 5 | Environmental Allies, Inc. | $2,254,486 | $2,276,558 | +1.0% | -1.0% | TxDOT |
| A00178374 | Bridge Replacement, S BURTON RD (S. BURTON RD @ SANDY CREEK to (STR#201810AA0237001)) | Beaumont District | 3 | Skyline Bridge LLC | $1,783,411 | $1,972,581 | +11% | 0.0% | TxDOT |
| A00221205 | FLEXIBLE BASE, US0082 (Various locations in the to Paris District) | Paris District | 2 | C-Rae Materials LLC | $1,605,225 | $1,645,770 | +3.0% | +1.0% | TxDOT |
| A00198364 | Landscape Development, SH 242 (FM 1488 to East of IH 45) | Houston District | 7 | Central North Construction, LLC | $1,579,083 | $1,684,152 | +7.0% | -29% | TxDOT |
| A00219386 | Preventive Maintenance, Various (Various Locations Within Hidalgo County to .) | Pharr District | 5 | TRP Infrastructure Services, LLC | $1,281,212 | $1,393,006 | +9.0% | -28% | TxDOT |
| A00213810 | Intersection Improvements With Right And/Or Left Turn Lanes, SH 302 (AT MARIAN DRIVE (NOTREES) to .) | Odessa District | 3 | Ragle Construction, Inc. | $1,275,100 | $1,351,118 | +6.0% | -2.0% | TxDOT |
| A00220732 | PAINT AND BEADS, IH0027 (Amarillo District Warehouse to Amarillo District Warehouse) | Amarillo District | 2 | Ennis-Flint, Inc. | $1,255,000 | $1,291,500 | +3.0% | +5.0% | TxDOT |
| A00185350 | Construct Pedestrian Infrastructure, Various (Various Locations in Kingsville to .) | Corpus Christi District | 8 | 3LW Civil LLC | $1,171,489 | $1,185,319 | +1.0% | -18% | TxDOT |
| A00214229 | Surfacing/Roadway Restoration, SS 536 (Ashley Rd. to IH 410) | San Antonio District | 7 | H. L. Zumwalt Construction, Inc. | $1,105,677 | $1,182,289 | +7.0% | -14% | TxDOT |
| A00219734 | REHABILITATION OF EXISTING ROADWAY, SH 347 (Ave B to FM365) | Beaumont District | 2 | Texas Materials Group, Inc. | $1,059,849 | $1,317,067 | +24% | -18% | TxDOT |
| A00207502 | Bridge Replacement, FM 1107 (At Ecleto Creek to .) | San Antonio District | 17 | D&S Concrete Contractors LLC | $948,875 | $1,007,380 | +6.0% | -21% | TxDOT |
| A00140550 | Surfacing/Roadway Restoration, IH 45 (0.43 miles South of SH 99 to Spring Creek) | Houston District | 2 | Isi Contracting, Inc. | $798,249 | $850,333 | +7.0% | -26% | TxDOT |
| A00203564 | Hazard Elimination & Safety, PRICE RD (Various Locations Along Price Rd. to .) | Pharr District | 4 | Traf-Tex, Inc. | $750,893 | $825,857 | +10% | +19% | TxDOT |
| A00220705 | MOWING HIGHWAY RIGHT OF WAY, US0083 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | Amarillo District | 6 | Bert Whitaker | $708,982 | $749,490 | +6.0% | -1.0% | TxDOT |
| A00203223 | Removal And/Or Replacement And/Or Disposal, OLD ROBINSON DR (Old Robinson Rd @ Drain to Old Robinson Rd @ Drain) | Waco District | 6 | C & W Southern LLC | $578,158 | $579,658 | 0.0% | -14% | TxDOT |
| A00220712 | MOWING HIGHWAY RIGHT OF WAY, SH0207 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | Amarillo District | 6 | Square G, Inc. | $565,330 | $609,504 | +8.0% | -12% | TxDOT |
| A00206480 | Hazard Elimination & Safety, SH 36 (0.90 Mi S of FM 2429 to FM 949) | Yoakum District | 4 | Roadway Specialties, Inc. | $559,612 | $606,720 | +8.0% | -14% | TxDOT |
| A00210237 | Surfacing/Roadway Restoration, SS 330 (IH 10 to SH 146) | Houston District | 3 | Stripe Lines, Inc. | $556,362 | $572,572 | +3.0% | -14% | TxDOT |
| A00220711 | MOWING HIGHWAY RIGHT OF WAY, US0287 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | Amarillo District | 6 | Square G, Inc. | $521,111 | $567,188 | +9.0% | +4.0% | TxDOT |
| A00220700 | MOWING HIGHWAY RIGHT OF WAY, US0087 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | Amarillo District | 6 | All Hands & Duke, Inc. | $479,590 | $496,128 | +3.0% | +18% | TxDOT |
| A00213488 | Hazard Elimination & Safety, COUNTY ROAD 366 (at Chandler Rd to .) | Austin District | 6 | E-Z Bel Construction, LLC | $379,121 | $419,495 | +11% | -26% | TxDOT |
| A00184602 | Install Traffic Signal, E DESSAU RD (at Childress Dr to .) | Austin District | 5 | Elecnor Belco Electric, Inc. | $378,536 | $420,788 | +11% | -15% | TxDOT |
| A00200263 | Hazard Elimination & Safety, FM 565 (AT SH 99 to .) | Beaumont District | 8 | Jasco | $310,773 | $356,825 | +15% | -18% | TxDOT |
| A00206590 | Hazard Elimination & Safety, FM 2425 (SH 144 S to SH 144 N) | Fort Worth District | 3 | TRP Infrastructure Services, LLC | $126,370 | $147,377 | +17% | -33% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.