Texas Cordia Construction, LLC: TxDOT bid record
Texas Cordia Construction, LLC submitted 49 bids on Texas DOT contracts in the data, from 09 JUL 2020 to 03 SEP 2026, and was the low bidder on 14 of them (29%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $120,122,390
- Latest bid
- 03 SEP 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 4 | 1 | 25% |
| 2021 | 6 | 3 | 50% |
| 2022 | 4 | 1 | 25% |
| 2023 | 10 | 2 | 20% |
| 2024 | 6 | 2 | 33% |
| 2025 | 9 | 4 | 44% |
| 2026 | 10 | 1 | 10% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sediment control fence (remove) | 506-7041 | LF | 38 | 23 (61%) | $1.00 | $1.00 |
| Driveways (ACP) | 530-7010 | SY | 36 | 22 (61%) | $36.00 | $60.00 |
| Removing concrete (driveways) | 104-7011 | SY | 32 | 22 (69%) | $10.00 | $21.00 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 49 | 20 (41%) | $1.00 | $1.40 |
| Reflectorized pavement marking type I (W)24"(solid)(100MIL) | 666-7036 | LF | 43 | 20 (47%) | $9.00 | $8.00 |
| TMA (stationary) | 505-7001 | DAY | 36 | 19 (53%) | $50.00 | $230.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 47 | 18 (38%) | $4,250.00 | $5,000.00 |
| Preparing row | 100-7002 | STA | 40 | 18 (45%) | $1,500.00 | $2,750.00 |
| TMA (mobile operation) | 505-7003 | DAY | 28 | 18 (64%) | $62.00 | $291.17 |
| Temporary sediment control fence (install) | 506-7039 | LF | 38 | 17 (45%) | $4.00 | $4.00 |
| Vegetative watering | 168-7001 | MG | 24 | 16 (67%) | $25.50 | $29.97 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 42 | 15 (36%) | $5.00 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Foremost Paving, Inc. | 43 | 25 of 43 |
| Ioc Company LLC | 37 | 14 of 37 |
| Reim Construction, Inc. | 12 | 6 of 12 |
| Earthworks Enterprise | 10 | 7 of 10 |
| Go Underground, Limited Liability Company | 9 | 4 of 9 |
| Anderson Columbia Co., Inc. | 8 | 4 of 8 |
| Asago, LLC | 8 | 6 of 8 |
| Posillico Civil, Inc. | 7 | 0 of 7 |
| 3LW Civil LLC | 6 | 2 of 6 |
| Clore Equipment LLC | 5 | 2 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 03 SEP 2026 | A00123454 | Pharr District | Rehabilitate Existing Roadway, FM 1575 (FM 510 to SH 100) | 2 of 5 | $10,509,310 | +10% |
| 02 SEP 2026 | A00206505 | Pharr District | Hazard Elimination & Safety, SH 495 (Border Rd. to FM 1423) | 4 of 4 | $812,309 | +39% |
| 06 AUG 2026 | A00192928 | Pharr District | Hazard Elimination & Safety, FM 1015 (Mile 12 N Rd. to Ida St.) | 2 of 4 | $681,211 | +3.0% |
| 05 AUG 2026 | A00131912 | Pharr District | Rehabilitate Existing Roadway, FM 907 (RANCHO BLANCO RD. to FM 3072) | 5 of 7 | $6,762,760 | +6.0% |
| 02 JUL 2026 | A00183413 | Pharr District | Construct Pedestrian Infrastructure, Various (Various Locations Districtwide to .) | 8 of 8 | $2,928,811 | +51% |
| 03 JUN 2026 | A00206853 | Pharr District | Construct Pedestrian Infrastructure, W FREDDY GONZALEZ DR (On Freddy Gonzalez Dr, from 9th St Ave to Closner Blvd.) | 6 of 7 | $662,825 | +34% |
| 02 JUN 2026 | A00193114 | Pharr District | Hazard Elimination & Safety, FM 491 (0.77 Miles North of FM 2629 to West Uncle Peter's Rd.) | 3 of 7 | $8,458,004 | +10% |
| 07 MAY 2026 | A00109269 | Pharr District | Widen Road - Add Lanes, FM 676 (SH 107 to TAYLOR RD.) | 1 of 6 | $24,782,061 | Low, 8.0% under the second |
| 06 MAY 2026 | A00121011 | Pharr District | Widen Road - Add Lanes, FM 2220 (FM 1925 to SH 107) | 4 of 6 | $31,233,709 | +22% |
| 06 JAN 2026 | A00197563 | Pharr District | Transportation Non-Roadway, FM 2556 (1330 FT S of FM 2556 & CR 407 Int. to Along FM 2556) | 7 of 7 | $14,164,618 | +116% |
| 02 DEC 2025 | A00126695 | Pharr District | Preventive Maintenance, FM 493 (SH 107 to IH 2) | 3 of 5 | $15,222,146 | +36% |
| 04 SEP 2025 | A00128327 | Pharr District | Widen Road - Add Lanes, SH 107 (SH 495 to FM 1924) | 1 of 7 | $32,261,532 | Low, 6.0% under the second |
| 08 AUG 2025 | A00184586 | Pharr District | Hazard Elimination & Safety, FM 490 (Hidalgo/Willacy County Line to FM 88) | 2 of 6 | $5,877,493 | +15% |
| 07 AUG 2025 | A00199485 | Pharr District | Bicycle And Pedestrian Improvements, STENGER ST (Business 77 West to Fannin St.) | 5 of 8 | $2,254,598 | +39% |
| 01 JUL 2025 | A00199763 | Pharr District | Hazard Elimination & Safety, FM 1423 (BUS 83S to CR 3677 /End of State Maintenance) | 1 of 6 | $3,406,133 | Low, 4.0% under the second |
| 05 JUN 2025 | A00196904 | Pharr District | Hazard Elimination & Safety, FM 491 (West Uncle Peters Rd. to First St.) | 1 of 4 | $5,167,455 | Low, 6.0% under the second |
| 03 APR 2025 | A00096030 | Pharr District | Widen Road - Add Lanes, FM 494 (FM 676 (MILE 5) to FM 1924 (MILE 3)) | 2 of 3 | $16,138,156 | +3.0% |
| 05 MAR 2025 | A00213980 | Pharr District | DRAINAGE IMPROVEMENT AND/OR REPAIRS, FM0907 (Durante Ave to Intersection of IH 2 Frontage) | 3 of 7 | $1,372,074 | +16% |
| 08 JAN 2025 | A00181043 | Pharr District | Bridge Replacement, 1 MILE RD W (Mile 1 West Rd., NBI #: 211090AA0824001 to @ Main Supply Channel) | 1 of 4 | $2,537,955 | Low, 6.0% under the second |
| 05 JUN 2024 | 06243015 | Pharr District | FM 490 Construct 4' shoulders from FM 88 to FM 1015 | 3 of 3 | $5,719,181 | +4.0% |
| 03 MAY 2024 | 05243237 | Pharr District | VA Bicycle and pedestrian improvements from ROBERTO GARZA (NOPALEZ) to EBONY ST. | 1 of 6 | $2,002,875 | Low, 10% under the second |
| 06 MAR 2024 | 03243205 | Pharr District | FM 676 Widen road - add lanes from TAYLOR RD. to FM 2220 | 1 of 5 | $11,811,612 | Low, 4.0% under the second |
| 05 MAR 2024 | 03243022 | Pharr District | FM 1425 Rehabilitate existing roadway from SH 186 to WILLACY/CAMERON C.L. | 2 of 4 | $3,311,550 | +10% |
| 05 JAN 2024 | 01243209 | Pharr District | FM 1925 Widen road - add lanes from FM 907 (ALAMO RD) to SHARP RD. | 4 of 5 | $8,579,616 | +4.0% |
| 05 JAN 2024 | 01243218 | Pharr District | SH 48 Install raised median from SH 4 to FM 511 | 3 of 3 | $6,609,325 | +45% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.