TxDOT contract A00109269 bid tabulation
Widen Road - Add Lanes, FM 676 (SH 107 to TAYLOR RD.). Let by Texas DOT on May 7, 2026, Hidalgo, Pharr District. 6 bids received; low bid $24,782,061 by Texas Cordia Construction, LLC, -26% against the engineer's estimate of $33,439,910.
- Owner
- Texas DOT
- Letting
- 07 MAY 2026
- Pay items
- 213
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Texas Cordia Construction, LLC | $24,782,061 | Low | -26% |
| 2 | Ioc Company LLC | $26,656,017 | +8.0% | -20% |
| 3 | Reim Construction, Inc. | $26,997,575 | +9.0% | -19% |
| 4 | Foremost Paving, Inc. | $30,541,251 | +23% | -9.0% |
| 5 | James Construction Group, LLC | $34,414,381 | +39% | +3.0% |
| 6 | 3LW Civil LLC | $41,704,917 | +68% | +25% |
Engineer's estimate: $33,439,910.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Texas Cordia Construction, LLC | 2. Ioc Company LLC | 3. Reim Construction, Inc. | 4. Foremost Paving, Inc. | 5. James Construction Group, LLC | 6. 3LW Civil LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 194 | $2,000.00 | $1,422.00 | $4,770.00 | $4,750.00 | $2,000.00 | $11,495 | $2,232.50 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 491 | $19.50 | $6.00 | $15.00 | $11.10 | $23.05 | $16.33 | $7.12 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 3,628 | $20.00 | $6.00 | $15.00 | $10.00 | $25.84 | $14.07 | $12.49 |
| 4 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 2,463 | $20.00 | $8.50 | $15.00 | $8.25 | $20.65 | $24.19 | $11.69 |
| 5 | Removing concrete (curb & gutter) (104-7017) | LF | 5,272 | $9.00 | $5.50 | $3.75 | $3.05 | $9.04 | $6.45 | $4.32 |
| 6 | Removing concrete (gutter) (104-7019) | LF | 377 | $11.00 | $5.50 | $10.00 | $5.50 | $9.04 | $9.15 | $15.98 |
| 7 | Excavation (roadway) (110-7001) | CY | 77,411 | $9.00 | $6.00 | $5.00 | $6.05 | $14.06 | $12.12 | $18.00 |
| 8 | Embankment (final)(DC)(type A) (132-7002) | CY | 7 | $24.00 | $158.00 | $200.00 | $145.00 | $101.00 | $155.65 | $1,080.00 |
| 9 | Embankment (final)(DC)(type C) (132-7006) | CY | 1,286 | $6.00 | $3.50 | $10.00 | $6.00 | $99.73 | $187.15 | $19.20 |
| 10 | Backfill (type A) (134-7001) | STA | 36 | $280.00 | $393.00 | $250.00 | $256.00 | $629.81 | $2,157.44 | $420.00 |
| 11 | Furn & place topsoil (vehicle) (160-7007) | CY | 50 | $75.00 | $45.00 | $10.00 | $41.65 | $28.01 | $100.00 | $66.00 |
| 12 | Hydro mulch seed (permanent_rural_clay) (164-7018) | SY | 24,382 | $0.50 | $0.50 | $0.36 | $0.40 | $0.56 | $0.38 | $0.62 |
| 13 | Hydro mulch seed (temporary_warm) (164-7021) | SY | 48,373 | $0.40 | $0.50 | $0.25 | $0.30 | $0.51 | $0.28 | $0.58 |
| 14 | Vegetative watering (168-7001) | TGL | 814 | $30.50 | $15.00 | $35.00 | $30.65 | $38.57 | $50.74 | $36.00 |
| 15 | Sprinkling (dust control) (204-7001) | TGL | 776 | $10.00 | $18.00 | $1.00 | $30.65 | $1.00 | $26.81 | $24.00 |
| 16 | FL BS (roadway del)(type E GR 4)(final pos) (247-7277) | CY | 20,938 | $54.00 | $45.00 | $25.00 | $35.00 | $26.15 | $45.28 | $75.60 |
| 17 | Rework BS metal (type B)(6")(DC)(org pos) (251-7034) | CY | 25,989 | $4.00 | $3.50 | $3.00 | $4.50 | $7.72 | $26.54 | $62.40 |
| 18 | Cement (275-7001) | TON | 3,290 | $220.00 | $200.00 | $189.00 | $214.00 | $181.73 | $209.31 | $276.00 |
| 19 | Cement TRT (existing material)(12") (275-7005) | SY | 172,318 | $4.00 | $2.00 | $2.25 | $2.05 | $3.68 | $2.69 | $4.80 |
| 20 | Cement TRT (existing material & new base)(10") (275-7008) | SY | 168,936 | $2.51 | $2.00 | $2.00 | $2.00 | $3.48 | $2.69 | $3.60 |
| 21 | Salvage, haul & stockpile reclaimed asphalt PV (2 to 4") (305-7003) | SY | 83,593 | $17.50 | $3.00 | $2.00 | $3.05 | $1.77 | $3.99 | $4.20 |
| 22 | Prime coat (MC-30) (310-7004) | GAL | 31,598 | $5.00 | $8.00 | $5.00 | $6.35 | $6.40 | $5.00 | $11.40 |
| 23 | Asphalt (tier II) (316-7266) | GAL | 47,399 | $4.50 | $7.50 | $4.00 | $4.10 | $6.66 | $4.00 | $10.20 |
| 24 | Aggregate (type-B GR-4P sac-B) (316-7267) | CY | 1,316 | $100.00 | $113.00 | $75.00 | $80.20 | $92.96 | $100.00 | $234.00 |
| 25 | SP mixes SP-D sac-A PG76-22 (344-7064) | TON | 27,016 | $115.00 | $118.00 | $115.00 | $117.00 | $104.82 | $115.00 | $252.00 |
| 26 | Plane & text asphalt concrete pavement(1.5") (354-7018) | SY | 1,167 | $4.50 | $11.00 | $5.00 | $1.65 | $29.47 | $19.34 | $12.00 |
| 27 | Plan & text concrete pavement(0" to 1.5") (354-7026) | SY | 1,043 | $1.20 | $11.00 | $5.00 | $1.55 | $28.80 | $15.45 | $14.40 |
| 28 | Struct excavation (special) (400-7005) | CY | 5,772 | $50.00 | $55.00 | $75.00 | $69.00 | $70.70 | $17.48 | $120.37 |
| 29 | Cut & restore asphalt paving (400-7008) | SY | 1,385 | $145.00 | $89.00 | $75.00 | $62.20 | $78.78 | $45.98 | $166.76 |
| 30 | Cem stabil BKFL (400-7010) | CY | 17,129 | $70.00 | $59.00 | $50.00 | $72.90 | $90.90 | $157.91 | $187.56 |
| 31 | Trench excavation protection (402-7001) | LF | 22,356 | $10.00 | $3.00 | $0.10 | $3.60 | $0.11 | $1.09 | $1.20 |
| 32 | Temporary special shoring (403-7001) | SF | 800 | $25.00 | $35.00 | $1.00 | $73.95 | $1.01 | $29.42 | $77.11 |
| 33 | Drilled shaft (traffic signal pole) (24 in) (416-7042) | LF | 144 | $200.00 | $249.00 | $294.00 | $253.00 | $232.30 | $294.00 | $122.69 |
| 34 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 210 | $450.00 | $379.00 | $492.00 | $384.00 | $353.50 | $492.00 | $152.71 |
| 35 | Bridge sidewalk (422-7012) | SF | 335 | $13.19 | $28.00 | $55.00 | $9.50 | $20.20 | $20.04 | $14.92 |
| 36 | Retaining wall (cast-in-place) (423-7016) | SF | 2,620 | $107.16 | $47.00 | $75.00 | $32.15 | $45.45 | $108.01 | $84.00 |
| 37 | Riprap (concrete)(5 in) (432-7002) | CY | 86 | $566.00 | $631.24 | $800.00 | $462.00 | $1,010.00 | $577.73 | $501.00 |
| 38 | Riprap (concrete)(CL B)(5 in) (432-7008) | CY | 16 | $650.00 | $692.00 | $900.00 | $456.00 | $969.60 | $694.01 | $501.00 |
| 39 | Riprap (concrete)(flume) (432-7012) | CY | 1 | $740.00 | $2,340.00 | $1,000.00 | $1,040.00 | $1,515.00 | $971.47 | $501.00 |
| 40 | Riprap (mow strip)(4 in) (432-7013) | CY | 56 | $620.00 | $502.00 | $660.00 | $653.00 | $1,313.00 | $602.32 | $501.00 |
| 41 | Rail (type C221) (450-7032) | LF | 101 | $170.00 | $75.00 | $265.00 | $387.00 | $79.29 | $169.51 | $198.37 |
| 42 | Rail (type PR11) (450-7044) | LF | 250 | $130.00 | $185.00 | $100.00 | $155.00 | $135.85 | $131.16 | $140.33 |
| 43 | Concrete box culvert (5 FT X 5 FT) (462-7009) | LF | 5,266 | $700.00 | $550.00 | $715.00 | $606.00 | $633.27 | $582.21 | $603.64 |
| 44 | Concrete box culvert (6 FT X 6 FT) (462-7014) | LF | 1,978 | $1,200.00 | $588.00 | $780.00 | $754.00 | $749.42 | $722.26 | $755.91 |
| 45 | Concrete box culvert (9 FT X 5 FT) (462-7027) | LF | 224 | $910.00 | $1,530.00 | $1,440.00 | $847.00 | $1,464.50 | $1,204.24 | $996.08 |
| 46 | RC pipe (CL III)(15 in) (464-7002) | LF | 80 | $100.00 | $68.00 | $90.00 | $60.30 | $86.86 | $104.07 | $81.35 |
| 47 | RC pipe (CL III)(18 in) (464-7003) | LF | 5,248 | $82.00 | $65.00 | $80.00 | $66.00 | $112.11 | $72.07 | $83.91 |
| 48 | RC pipe (CL III)(24 in) (464-7005) | LF | 1,829 | $110.00 | $75.00 | $95.00 | $76.35 | $98.98 | $79.56 | $96.35 |
| 49 | RC pipe (CL III)(30 in) (464-7007) | LF | 445 | $120.00 | $93.00 | $130.00 | $101.00 | $134.33 | $108.15 | $146.21 |
| 50 | RC pipe (CL III)(36 in) (464-7009) | LF | 328 | $182.00 | $135.00 | $170.00 | $144.00 | $176.75 | $171.07 | $201.81 |
| 51 | RC pipe (CL III)(42 in) (464-7010) | LF | 979 | $230.00 | $177.00 | $225.00 | $193.00 | $214.12 | $178.17 | $251.07 |
| 52 | RC pipe (CL III)(48 in) (464-7011) | LF | 2,035 | $250.00 | $211.00 | $255.00 | $224.00 | $295.93 | $207.62 | $302.35 |
| 53 | RC pipe (CL III)(60 in) (464-7013) | LF | 2,962 | $424.00 | $414.00 | $370.00 | $331.00 | $415.11 | $332.47 | $454.36 |
| 54 | RC pipe (CL III)(72 in) (464-7015) | LF | 303 | $505.00 | $628.00 | $665.00 | $771.00 | $656.50 | $682.41 | $646.62 |
| 55 | RC pipe (CL IV)(60 in) (464-7028) | LF | 451 | $560.00 | $434.00 | $435.00 | $376.00 | $429.25 | $363.82 | $516.45 |
| 56 | Manh (complete)(PRM)(72IN) (465-7004) | EACH | 1 | $14,000 | $15,060 | $16,000 | $6,310.00 | $8,231.50 | $9,151.74 | $6,507.70 |
| 57 | Inlet (complete)(pcu)(3FT)(none) (465-7029) | EACH | 19 | $7,000.00 | $3,530.00 | $5,000.00 | $6,250.00 | $8,433.50 | $7,846.96 | $7,305.70 |
| 58 | Inlet (complete)(pcu)(3FT)(left) (465-7030) | EACH | 38 | $8,400.00 | $3,750.00 | $5,000.00 | $6,780.00 | $8,948.60 | $9,695.13 | $7,735.88 |
| 59 | Inlet (complete)(pcu)(3FT)(right) (465-7031) | EACH | 32 | $8,500.00 | $2,950.00 | $4,000.00 | $9,220.00 | $11,706 | $10,533 | $10,279 |
| 60 | Inlet (complete)(pcu)(3FT)(both) (465-7032) | EACH | 23 | $8,428.69 | $3,900.00 | $4,500.00 | $7,510.00 | $9,362.70 | $10,050 | $8,279.17 |
| 61 | Inlet (complete)(pcu)(4FT)(right) (465-7035) | EACH | 2 | $9,479.27 | $5,510.00 | $7,500.00 | $5,600.00 | $8,249.68 | $9,045.23 | $6,488.82 |
| 62 | Inlet (complete)(pcu)(4FT)(both) (465-7036) | EACH | 2 | $11,816 | $5,210.00 | $7,000.00 | $6,240.00 | $8,110.30 | $9,876.69 | $6,903.70 |
| 63 | Inlet (complete)(pcu)(5FT)(none) (465-7037) | EACH | 2 | $7,380.00 | $6,640.00 | $10,000 | $5,220.00 | $9,221.30 | $8,789.56 | $6,213.70 |
| 64 | Inlet (complete)(pcu)(5FT)(right) (465-7039) | EACH | 2 | $11,100 | $6,280.00 | $9,500.00 | $6,050.00 | $9,837.40 | $9,867.02 | $8,651.05 |
| 65 | Inlet (complete)(pcu)(6FT)(none) (465-7041) | EACH | 1 | $11,025 | $9,650.00 | $18,000 | $6,840.00 | $10,605 | $11,545 | $7,773.70 |
| 66 | Inlet (complete)(pcu)(6FT)(left) (465-7042) | EACH | 5 | $9,500.00 | $7,110.00 | $9,000.00 | $7,590.00 | $11,110 | $12,775 | $8,337.70 |
| 67 | Inlet (complete)(pcu)(6FT)(right) (465-7043) | EACH | 2 | $13,303 | $8,970.00 | $13,000 | $10,200 | $13,433 | $15,608 | $11,074 |
| 68 | Inlet (complete)(pcu)(6FT)(both) (465-7044) | EACH | 2 | $9,000.00 | $12,000 | $17,500 | $8,200.00 | $11,413 | $14,388 | $7,760.15 |
| 69 | Inlet (complete)(PSL)(RH)(6FTX6FT) (465-7068) | EACH | 1 | $9,620.00 | $29,020 | $24,250 | $7,510.00 | $11,625 | $10,710 | $7,960.30 |
| 70 | Inlet (complete)(PSL)(RH)(8FTX8FT) (465-7069) | EACH | 18 | $18,085 | $22,420 | $28,000 | $15,900 | $32,098 | $31,930 | $16,040 |
| 71 | Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126) | EACH | 1 | $7,000.00 | $3,730.00 | $6,500.00 | $3,360.00 | $8,463.80 | $5,805.88 | $4,570.90 |
| 72 | Inlet (complete)(PSL)(FG)(3FTX5FT-3FTX3FT) (465-7129) | EACH | 7 | $8,000.00 | $4,990.00 | $6,000.00 | $4,600.00 | $9,266.75 | $7,543.44 | $5,532.36 |
| 73 | Wingwall (PW - 1) (HW=8 FT) (466-7178) | EACH | 2 | $40,000 | $24,290 | $35,000 | $49,100 | $40,653 | $39,048 | $14,753 |
| 74 | Set (type II) (15 in) (RCP) (6: 1) (P) (467-7300) | EACH | 2 | $2,013.00 | $1,350.00 | $1,500.00 | $1,130.00 | $1,262.50 | $1,440.21 | $2,678.02 |
| 75 | Jack bor or tun pipe(60 in)(RC)(CL IV) (476-7027) | LF | 80 | $1,350.00 | $1,850.00 | $1,500.00 | $1,820.00 | $2,828.00 | $2,365.45 | $1,957.77 |
| 76 | Adjusting manholes (479-7001) | EACH | 46 | $2,600.00 | $5,340.00 | $1,500.00 | $805.00 | $1,414.00 | $1,606.20 | $847.35 |
| 77 | Adjusting inlets (cap) (479-7006) | EACH | 5 | $3,000.00 | $1,800.00 | $2,500.00 | $1,910.00 | $2,525.00 | $2,910.85 | $3,506.60 |
| 78 | Removing structure (inlet) (496-7002) | EACH | 19 | $1,200.00 | $574.00 | $750.00 | $657.00 | $939.30 | $1,083.27 | $1,132.73 |
| 79 | Removing structure (manhole) (496-7003) | EACH | 2 | $1,200.00 | $1,990.00 | $1,000.00 | $960.00 | $1,287.75 | $833.92 | $1,385.62 |
| 80 | Removing structure (set) (496-7004) | EACH | 139 | $280.00 | $272.00 | $250.00 | $244.00 | $730.23 | $541.63 | $322.77 |
| 81 | Removing structure (pipe) (496-7007) | LF | 8,560 | $20.00 | $7.50 | $5.00 | $11.85 | $38.38 | $32.94 | $18.00 |
| 82 | Removing structure (box culvert) (496-7008) | LF | 82 | $65.00 | $68.00 | $150.00 | $86.00 | $464.60 | $68.87 | $184.25 |
| 83 | Removing structure (pipe) (496-7037) | EACH | 2 | $640.00 | $2,600.00 | $3,000.00 | $594.00 | $1,686.70 | $3,211.59 | $1,887.10 |
| 84 | Mobilization (500-7001) | LS | 1 | $3,000,000 | $1,500,000 | $2,680,000 | $2,500,000 | $2,700,000 | $3,400,000 | $3,136,426 |
| 85 | Barricades, signs and traffic handling (502-7001) | MO | 31 | $4,000.00 | $750.00 | $1,000.00 | $2,790.00 | $7,640.67 | $5,844.14 | $5,953.69 |
| 86 | Portable changeable message sign (503-7002) | EACH | 12 | $10,100 | $47.00 | $100.00 | $5,580.00 | $7,767.19 | $10,742 | $80.40 |
| 87 | TMA (stationary) (505-7001) | DAY | 956 | $130.00 | $20.00 | $0.10 | $27.90 | $42.46 | $88.63 | $210.00 |
| 88 | TMA (mobile operation) (505-7003) | DAY | 45 | $180.00 | $59.00 | $0.10 | $112.00 | $0.01 | $599.90 | $240.00 |
| 89 | Construction exits (install) (type 2) (506-7021) | SY | 1,560 | $50.00 | $19.00 | $25.00 | $14.15 | $20.25 | $110.00 | $60.00 |
| 90 | Construction exits (remove) (506-7024) | SY | 1,560 | $10.50 | $6.00 | $10.00 | $8.00 | $13.27 | $35.00 | $15.60 |
| 91 | Temporary sediment control fence (install) (506-7039) | LF | 12,005 | $4.20 | $4.00 | $3.25 | $3.85 | $4.30 | $3.80 | $5.70 |
| 92 | Temporary sediment control fence (remove) (506-7041) | LF | 12,005 | $1.20 | $1.00 | $0.10 | $1.05 | $1.92 | $1.20 | $1.20 |
| 93 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 2,425 | $5.50 | $6.00 | $3.49 | $3.15 | $6.01 | $6.00 | $8.40 |
| 94 | Biodegradable erosion control logs (remove) (506-7046) | LF | 2,425 | $1.30 | $1.50 | $0.10 | $1.00 | $1.92 | $1.40 | $1.20 |
| 95 | Constructing detours (508-7001) | SY | 19,765 | $60.00 | $32.00 | $28.50 | $40.80 | $44.95 | $31.15 | $57.34 |
| 96 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 7,340 | $35.00 | $16.00 | $10.00 | $53.75 | $25.51 | $42.64 | $42.82 |
| 97 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 3,040 | $35.00 | $20.00 | $25.00 | $56.15 | $31.64 | $42.77 | $79.15 |
| 98 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 4,480 | $8.00 | $7.00 | $4.00 | $5.00 | $15.18 | $7.22 | $4.83 |
| 99 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 1,840 | $8.00 | $7.00 | $4.00 | $5.00 | $7.95 | $8.41 | $12.14 |
| 100 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 7,340 | $9.00 | $6.50 | $5.00 | $5.00 | $17.19 | $9.76 | $6.48 |
| 101 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 3,040 | $15.00 | $11.00 | $5.00 | $5.00 | $11.92 | $9.36 | $6.07 |
| 102 | PCTB (fur&inst)(F-shape or SNGL SLP)type 1 (512-7089) | LF | 840 | $40.00 | $20.00 | $15.00 | $5.00 | $17.97 | $38.76 | $11.31 |
| 103 | PCTB (move)(F-shape or SNGL SLP)type 1 (512-7090) | LF | 840 | $6.00 | $7.50 | $5.00 | $4.15 | $16.96 | $6.61 | $4.47 |
| 104 | PCTB (remove)(F-shape or SNGL SLP)type 1 (512-7092) | LF | 840 | $12.00 | $10.00 | $10.00 | $5.00 | $12.75 | $12.57 | $4.95 |
| 105 | Concrete curb & gutter (type I) (529-7008) | LF | 19,075 | $30.00 | $18.00 | $15.50 | $17.00 | $14.99 | $25.19 | $20.10 |
| 106 | Concrete curb & gutter (type II) (529-7009) | LF | 5,589 | $30.00 | $16.00 | $15.50 | $17.00 | $16.22 | $33.79 | $20.10 |
| 107 | Concrete C&G (valley gutter) (529-7019) | LF | 1,808 | $68.00 | $63.00 | $45.00 | $38.75 | $51.73 | $117.61 | $23.10 |
| 108 | Driveways (concrete) (530-7006) | SY | 2,256 | $110.00 | $99.00 | $90.00 | $62.75 | $88.39 | $112.92 | $66.00 |
| 109 | Driveways (ACP) (530-7010) | SY | 4,737 | $55.00 | $37.00 | $60.00 | $36.10 | $54.56 | $88.81 | $228.00 |
| 110 | Concrete sidewalks (4") (531-7001) | SY | 12,669 | $75.00 | $55.00 | $41.00 | $40.30 | $62.55 | $68.45 | $55.66 |
| 111 | Curb ramps (type 2) (531-7006) | EACH | 12 | $3,500.00 | $1,920.00 | $1,750.00 | $1,720.00 | $1,226.66 | $2,948.81 | $3,180.00 |
| 112 | Curb ramps (type 5) (531-7008) | EACH | 11 | $4,000.00 | $2,980.00 | $1,750.00 | $1,920.00 | $1,226.66 | $3,225.56 | $3,720.00 |
| 113 | Curb ramps (type 10) (531-7011) | EACH | 49 | $2,500.00 | $2,050.00 | $1,800.00 | $1,810.00 | $1,226.66 | $2,886.38 | $2,940.00 |
| 114 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,250 | $30.00 | $31.00 | $31.83 | $33.80 | $30.76 | $24.75 | $30.91 |
| 115 | Downstream anchor terminal section (540-7015) | EACH | 1 | $1,600.00 | $1,510.00 | $1,447.72 | $1,730.00 | $1,398.85 | $1,350.00 | $2,223.64 |
| 116 | Remove metal beam guard fence (542-7001) | LF | 1,829 | $3.40 | $3.50 | $3.14 | $2.90 | $3.03 | $2.00 | $4.79 |
| 117 | Remove terminal anchor section (542-7002) | EACH | 2 | $300.00 | $270.00 | $229.97 | $275.00 | $222.20 | $200.00 | $331.82 |
| 118 | Remove downstream anchor terminal (542-7003) | EACH | 1 | $350.00 | $1,000.00 | $229.96 | $462.00 | $222.20 | $200.00 | $663.64 |
| 119 | Guardrail end treatment (install) (544-7001) | EACH | 1 | $3,300.00 | $3,550.00 | $3,763.04 | $3,900.00 | $3,636.00 | $3,350.00 | $4,939.45 |
| 120 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 12 | $1,500.00 | $2,080.00 | $1,000.00 | $1,720.00 | $1,530.15 | $2,000.00 | $796.91 |
| 121 | Crash cushion attenuator (remove) (545-7004) | EACH | 14 | $850.00 | $1,130.00 | $250.00 | $579.00 | $818.10 | $1,000.00 | $793.27 |
| 122 | Crash cushion attenuator (install)(R)(N)(TL3) (545-7010) | EACH | 2 | $30,000 | $8,480.00 | $30,000 | $26,800 | $29,118 | $25,750 | $22,577 |
| 123 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 14 | $9,000.00 | $10,450 | $7,500.00 | $8,430.00 | $8,110.30 | $8,325.00 | $7,306.31 |
| 124 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 64 | $375.00 | $515.00 | $297.54 | $247.00 | $287.85 | $285.00 | $270.00 |
| 125 | Mailbox install-D (TWW-post) type 4 (560-7009) | EACH | 11 | $295.00 | $486.00 | $339.30 | $302.00 | $328.25 | $325.00 | $330.00 |
| 126 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 9 | $800.00 | $897.00 | $908.29 | $1,040.00 | $878.70 | $870.00 | $1,140.00 |
| 127 | Conduit (PVC) (schedule 40) (1") (618-7021) | LF | 90 | $17.26 | $6.00 | $11.55 | $6.10 | $5.66 | $11.55 | $21.67 |
| 128 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 765 | $8.00 | $28.00 | $16.00 | $28.50 | $26.26 | $16.00 | $22.27 |
| 129 | Conduit (PVC) (schedule 40) (4") (618-7040) | LF | 423 | $25.00 | $35.00 | $24.00 | $35.15 | $32.32 | $24.00 | $24.25 |
| 130 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 295 | $30.00 | $31.00 | $25.00 | $31.85 | $29.29 | $25.00 | $36.37 |
| 131 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 885 | $40.00 | $37.00 | $35.30 | $37.35 | $34.34 | $35.30 | $39.49 |
| 132 | Electrical conductor (no.8) bare (620-7007) | LF | 1,855 | $1.90 | $2.00 | $1.80 | $2.20 | $2.08 | $1.80 | $4.45 |
| 133 | Electrical conductor (no.6) bare (620-7009) | LF | 189 | $2.40 | $2.50 | $2.00 | $2.75 | $2.53 | $2.00 | $4.62 |
| 134 | Electrical conductor (no.6) insulated (620-7010) | LF | 365 | $2.70 | $2.50 | $2.35 | $2.75 | $2.53 | $2.35 | $4.92 |
| 135 | Tray cable (4 conductor) (12 AWG) (621-7006) | LF | 2,422 | $3.10 | $3.00 | $3.10 | $3.30 | $3.03 | $3.10 | $5.28 |
| 136 | Ground box type A (122311)W/apron (624-7002) | EACH | 27 | $1,400.00 | $1,410.00 | $1,224.30 | $1,430.00 | $1,313.00 | $1,224.30 | $1,860.00 |
| 137 | Ground box type D (162922)W/apron (624-7008) | EACH | 3 | $1,600.00 | $1,840.00 | $1,340.65 | $1,870.00 | $1,717.00 | $1,340.65 | $1,920.00 |
| 138 | Zinc-coat steel wire strand (3/16") (625-7001) | LF | 1,775 | $4.10 | $4.00 | $2.50 | $4.05 | $3.74 | $2.50 | $4.52 |
| 139 | Zinc-coat steel wire strand (5/16") (625-7003) | LF | 4,715 | $4.00 | $4.50 | $2.90 | $4.40 | $4.10 | $2.90 | $4.78 |
| 140 | Elc SRV type D 120/240 060(NS)GS(N)TP(O) (628-7138) | EACH | 4 | $3,690.00 | $4,650.00 | $6,283.00 | $4,720.00 | $4,343.00 | $6,283.00 | $4,500.00 |
| 141 | Elc SRV type T 120/240 000(NS)GS(L)TS(O) (628-7322) | EACH | 4 | $2,550.46 | $4,220.00 | $4,422.00 | $4,280.00 | $3,939.00 | $4,422.00 | $4,500.00 |
| 142 | Aluminum signs (type A) (636-7001) | SF | 453 | $35.00 | $19.00 | $25.32 | $30.75 | $24.50 | $30.00 | $44.40 |
| 143 | Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025) | EACH | 104 | $770.00 | $765.00 | $709.93 | $741.00 | $686.80 | $680.00 | $810.00 |
| 144 | Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026) | EACH | 30 | $950.00 | $861.00 | $730.81 | $1,070.00 | $707.00 | $700.00 | $1,170.00 |
| 145 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 40 | $957.00 | $892.00 | $908.29 | $1,210.00 | $878.70 | $870.00 | $1,320.00 |
| 146 | Remove SM RD SN sup&AM (644-7073) | EACH | 69 | $112.33 | $263.00 | $114.84 | $71.35 | $111.10 | $110.00 | $78.00 |
| 147 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 6 | $50.00 | $206.00 | $42.81 | $82.00 | $41.41 | $41.00 | $90.00 |
| 148 | Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059) | EACH | 35 | $100.00 | $235.00 | $78.30 | $104.00 | $75.75 | $75.00 | $114.00 |
| 149 | Remove delin & object marker assms (658-7078) | EACH | 4 | $20.10 | $74.00 | $19.32 | $54.00 | $18.69 | $18.50 | $60.00 |
| 150 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 43,711 | $0.50 | $0.50 | $0.62 | $0.50 | $0.51 | $0.50 | $0.60 |
| 151 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 4,523 | $0.60 | $1.00 | $1.21 | $1.00 | $0.89 | $0.88 | $1.06 |
| 152 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 1,625 | $7.60 | $3.50 | $9.84 | $3.85 | $3.54 | $3.50 | $4.20 |
| 153 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 38 | $150.00 | $50.00 | $120.51 | $54.00 | $50.50 | $50.00 | $60.00 |
| 154 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 38 | $200.00 | $75.00 | $120.51 | $82.00 | $75.75 | $75.00 | $90.00 |
| 155 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 4,740 | $0.32 | $0.50 | $0.75 | $0.70 | $0.69 | $0.68 | $0.82 |
| 156 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 70,162 | $0.50 | $0.50 | $0.62 | $0.50 | $0.51 | $0.50 | $0.60 |
| 157 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 1,921 | $4.00 | $5.00 | $4.22 | $5.50 | $5.05 | $5.00 | $6.00 |
| 158 | Work zone pavement marking removing (W)6"(DOT) (662-7066) | LF | 248 | $2.00 | $2.50 | $2.21 | $2.75 | $2.53 | $2.50 | $3.00 |
| 159 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 2,049 | $0.75 | $1.00 | $0.85 | $0.95 | $0.89 | $0.88 | $1.06 |
| 160 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 786 | $1.00 | $1.00 | $1.21 | $1.20 | $1.12 | $1.10 | $1.32 |
| 161 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 8,318 | $1.00 | $1.00 | $1.21 | $0.95 | $0.89 | $0.88 | $1.06 |
| 162 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 330 | $3.00 | $2.00 | $4.22 | $2.10 | $2.02 | $2.00 | $2.40 |
| 163 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 4,981 | $7.00 | $3.50 | $7.83 | $3.75 | $3.44 | $3.40 | $4.08 |
| 164 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 91 | $180.00 | $50.00 | $110.47 | $55.00 | $50.50 | $50.00 | $60.00 |
| 165 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 67 | $250.00 | $95.00 | $110.47 | $104.00 | $95.95 | $95.00 | $114.00 |
| 166 | Reflectorized pavement marking type I (W)(bike arrow)(100MIL) (666-7093) | EACH | 33 | $210.00 | $75.00 | $160.68 | $82.00 | $75.75 | $75.00 | $90.00 |
| 167 | Reflectorized pavement marking type I(W)(bike syml)(100MIL) (666-7099) | EACH | 33 | $255.00 | $150.00 | $160.68 | $165.00 | $151.50 | $150.00 | $180.00 |
| 168 | Reflectorized pavement marking type II (W) 18" (solid) (666-7183) | LF | 24 | $3.50 | $25.00 | $6.83 | $27.00 | $25.25 | $25.00 | $30.00 |
| 169 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 7,221 | $0.60 | $1.00 | $0.65 | $1.05 | $0.95 | $0.94 | $1.13 |
| 170 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 27,757 | $0.50 | $0.50 | $0.68 | $0.70 | $0.69 | $0.68 | $0.82 |
| 171 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 4,590 | $0.52 | $1.00 | $0.75 | $1.05 | $0.95 | $0.94 | $1.13 |
| 172 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 37,797 | $0.60 | $0.50 | $0.68 | $0.70 | $0.69 | $0.68 | $0.82 |
| 173 | Reflectorized pavement marker type I-C (672-7002) | EACH | 793 | $5.00 | $7.50 | $4.22 | $8.25 | $7.58 | $7.50 | $9.00 |
| 174 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,498 | $4.20 | $7.50 | $4.22 | $8.25 | $7.58 | $7.50 | $9.00 |
| 175 | Eliminating existing PM & markers (4") (677-7001) | LF | 26,992 | $0.50 | $0.15 | $0.60 | $0.15 | $0.16 | $0.15 | $0.18 |
| 176 | Eliminating existing PM & markers (6") (677-7002) | LF | 2,019 | $0.41 | $0.50 | $0.80 | $0.25 | $0.26 | $0.25 | $0.30 |
| 177 | Eliminating existing PM & markers (8") (677-7004) | LF | 896 | $0.82 | $0.50 | $1.41 | $0.40 | $0.36 | $0.35 | $0.42 |
| 178 | Eliminating existing PM & markers (12") (677-7006) | LF | 756 | $1.50 | $0.50 | $1.91 | $0.50 | $0.46 | $0.45 | $0.54 |
| 179 | Eliminating existing PM & markers (24") (677-7008) | LF | 361 | $3.00 | $1.00 | $5.02 | $0.80 | $0.76 | $0.75 | $0.90 |
| 180 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 19 | $50.00 | $25.00 | $60.26 | $27.00 | $25.25 | $25.00 | $30.00 |
| 181 | Eliminating existing PM & markers (word) (677-7015) | EACH | 10 | $58.00 | $25.00 | $60.26 | $27.00 | $25.25 | $25.00 | $30.00 |
| 182 | Install highway traffic signal (flash beacon) (680-7001) | EACH | 1 | $10,000 | $4,980.00 | $11,984 | $5,050.00 | $4,646.00 | $11,984 | $4,380.00 |
| 183 | Install highway traffic signal (isolated) (680-7002) | EACH | 4 | $30,000 | $26,820 | $34,832 | $27,200 | $25,048 | $34,832 | $26,040 |
| 184 | Removing traffic signals (680-7004) | EACH | 4 | $6,000.00 | $3,790.00 | $4,599.00 | $3,840.00 | $3,535.00 | $4,599.00 | $4,200.00 |
| 185 | Temporary traffic signals (681-7001) | EACH | 6 | $7,500.00 | $26,930 | $12,935 | $27,300 | $25,149 | $12,935 | $21,633 |
| 186 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 32 | $330.00 | $346.00 | $274.00 | $351.00 | $323.20 | $274.00 | $239.86 |
| 187 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 17 | $350.00 | $346.00 | $274.00 | $351.00 | $323.20 | $274.00 | $239.86 |
| 188 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 36 | $330.00 | $346.00 | $274.00 | $351.00 | $323.20 | $274.00 | $239.86 |
| 189 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 34 | $350.00 | $346.00 | $274.00 | $318.00 | $323.20 | $274.00 | $239.86 |
| 190 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 36 | $350.00 | $346.00 | $274.00 | $351.00 | $323.20 | $274.00 | $239.86 |
| 191 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 17 | $360.00 | $346.00 | $274.00 | $351.00 | $323.20 | $274.00 | $239.86 |
| 192 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 32 | $696.00 | $876.00 | $606.00 | $889.00 | $818.10 | $606.00 | $864.00 |
| 193 | Backplate W/reflectorized border(4 sec) (682-7037) | EACH | 17 | $240.00 | $260.00 | $255.00 | $264.00 | $242.40 | $255.00 | $259.46 |
| 194 | Backplate W/reflectorized border(3 sec) (682-7054) | EACH | 32 | $200.00 | $184.00 | $228.00 | $187.00 | $171.70 | $606.00 | $193.46 |
| 195 | Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007) | LF | 3,825 | $2.00 | $2.00 | $2.30 | $2.20 | $2.08 | $2.30 | $3.10 |
| 196 | Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010) | LF | 6,480 | $2.10 | $3.50 | $3.40 | $3.55 | $3.29 | $3.40 | $4.06 |
| 197 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 2,447 | $3.20 | $4.50 | $4.41 | $4.65 | $4.30 | $4.41 | $4.84 |
| 198 | Install RDSD flash beacon assembly (685-7001) | EACH | 7 | $6,000.00 | $5,730.00 | $5,181.00 | $5,820.00 | $5,353.00 | $5,181.00 | $3,822.85 |
| 199 | Remove RDSD flash beacon assembly (685-7003) | EACH | 7 | $900.00 | $346.00 | $403.00 | $351.00 | $323.20 | $403.00 | $514.28 |
| 200 | Ins traffic signal PL AM (S)STR(type B)lum (686-7008) | EACH | 14 | $9,500.00 | $8,540.00 | $9,560.00 | $8,670.00 | $7,979.00 | $9,560.00 | $7,892.57 |
| 201 | Pedestrian pole assembly (687-7001) | EACH | 20 | $2,700.00 | $1,300.00 | $3,459.00 | $1,320.00 | $1,212.00 | $3,459.00 | $1,380.00 |
| 202 | Pedestrian detect push button (APS) (688-7001) | EACH | 32 | $1,100.00 | $1,010.00 | $820.00 | $1,020.00 | $939.30 | $820.00 | $1,188.00 |
| 203 | Pedestrian detector controller unit (688-7003) | EACH | 4 | $4,200.00 | $3,790.00 | $3,839.00 | $3,840.00 | $3,535.00 | $3,839.00 | $4,680.00 |
| 204 | Removal of conduit (690-7001) | LF | 6,258 | $2.60 | $4.50 | $5.80 | $4.40 | $4.04 | $5.80 | $5.75 |
| 205 | Removal of ground boxes (690-7006) | EACH | 75 | $230.00 | $89.00 | $350.00 | $90.05 | $82.82 | $350.00 | $240.00 |
| 206 | PRSSR irrig PVC pipe (18") (1000-7001) | LF | 100 | $93.00 | $122.00 | $200.00 | $63.00 | $262.60 | $58.83 | $420.00 |
| 207 | PRSSR irrig PVC pipe (24") (1000-7002) | LF | 342 | $142.00 | $194.00 | $195.00 | $102.00 | $242.40 | $87.19 | $480.00 |
| 208 | Bonding course (3007-7001) | GAL | 11,060 | $3.40 | $6.00 | $3.00 | $3.00 | $2.64 | $5.00 | $8.40 |
| 209 | Impermeable liner (5030-7001) | SY | 449 | $20.00 | $63.00 | $15.00 | $80.00 | $31.31 | $53.47 | $8.40 |
| 210 | RVDS (presence detection only) (6008-7001) | EACH | 24 | $7,900.00 | $4,870.00 | $3,741.00 | $4,940.00 | $4,545.00 | $3,741.00 | $11,247 |
| 211 | RVDS (advance detection only) (6008-7002) | EACH | 24 | $7,900.00 | $4,870.00 | $3,835.00 | $4,940.00 | $4,545.00 | $3,835.00 | $10,707 |
| 212 | Welded steel casing pipe (open cut)(24") (7003-7001) | LF | 93 | $173.00 | $297.00 | $300.00 | $283.00 | $464.60 | $170.50 | $362.05 |
| 213 | Welded steel casing pipe (open cut)(30") (7003-7002) | LF | 304 | $225.00 | $391.00 | $400.00 | $399.00 | $565.60 | $203.79 | $527.37 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 7, 2026. Compiled by Mirage Metrics.