3LW Civil LLC: TxDOT bid record
3LW Civil LLC submitted 196 bids on Texas DOT contracts in the data, from 06 FEB 2020 to 03 SEP 2026, and was the low bidder on 47 of them (24%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $88,830,539
- Latest bid
- 03 SEP 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 28 | 9 | 32% |
| 2021 | 20 | 5 | 25% |
| 2022 | 18 | 5 | 28% |
| 2023 | 26 | 6 | 23% |
| 2024 | 26 | 7 | 27% |
| 2025 | 50 | 8 | 16% |
| 2026 | 28 | 7 | 25% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Tyler District | 25 | 9 | 36% |
| Brownwood District | 20 | 9 | 45% |
| Yoakum District | 18 | 5 | 28% |
| Austin District | 17 | 3 | 18% |
| San Angelo District | 16 | 5 | 31% |
| Corpus Christi District | 11 | 3 | 27% |
| Pharr District | 10 | 2 | 20% |
| San Antonio District | 9 | 0 | 0% |
| Amarillo District | 8 | 1 | 13% |
| Waco District | 8 | 1 | 13% |
| Paris District | 6 | 0 | 0% |
| Wichita Falls District | 6 | 2 | 33% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| TMA (stationary) | 505-7001 | DAY | 135 | 55 (41%) | $180.00 | $230.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 92 | 48 (52%) | $1.00 | $1.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 89 | 43 (48%) | $2,950.00 | $3,245.00 |
| Temporary sediment control fence (install) | 506-7039 | LF | 81 | 35 (43%) | $3.50 | $4.00 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 76 | 32 (42%) | $1.00 | $1.40 |
| Remove metal beam guard fence | 542-7001 | LF | 71 | 30 (42%) | $2.00 | $3.00 |
| Metal W-beam guard fence (steel post) | 540-7002 | LF | 44 | 23 (52%) | $29.50 | $33.00 |
| Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) | 658-7019 | EACH | 57 | 22 (39%) | $30.00 | $35.00 |
| Riprap (mow strip)(4 in) | 432-7013 | CY | 66 | 19 (29%) | $550.00 | $643.00 |
| Vegetative watering | 168-7001 | MG | 51 | 19 (37%) | $45.00 | $29.97 |
| Metal beam guard fence trans (thrie-beam) | 540-7005 | EACH | 62 | 18 (29%) | $2,000.00 | $2,140.00 |
| Preparing row | 100-7002 | STA | 58 | 18 (31%) | $1,883.30 | $2,750.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| FNH Construction, LLC | 36 | 4 of 36 |
| Garret Shields Infrastructure | 34 | 14 of 34 |
| Ti-Zack Concrete, LLC | 33 | 12 of 33 |
| STX Civil | 32 | 14 of 32 |
| HJC Farms, Inc. | 27 | 10 of 27 |
| Icos Management, LLC | 27 | 9 of 27 |
| SCR Civil Construction, LLC | 26 | 14 of 26 |
| Altus Construction LLC | 24 | 8 of 24 |
| E-Z Bel Construction, LLC | 24 | 16 of 24 |
| East Texas Bridge, Inc. | 21 | 2 of 21 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 03 SEP 2026 | A00207181 | Yoakum District | Construct Pedestrian Infrastructure, US 87 (TROPICAL DRIVE to BU 59T) | 1 of 7 | $5,349,519 | Low, 1.0% under the second |
| 02 SEP 2026 | A00200023 | Fort Worth District | Replace Guardrail, Various (VARIOUS LOCATIONS to WITHIN FORT WORTH DISTRICT) | 2 of 11 | $3,806,232 | +4.0% |
| 06 AUG 2026 | A00219268 | Tyler District | Install Illumination, Various (Install Roadway Illumination to in the Tyler District) | 7 of 10 | $799,586 | +22% |
| 05 AUG 2026 | A00223027 | Brownwood District | ACP OVERLAY, SH0006 (FROM FM 1853 to UPRR IN CISCO) | 8 of 9 | $3,432,054 | +15% |
| 08 JUL 2026 | A00218468 | Waco District | INSTALLATION OF TRAFFIC SIGNALS, US0190 (Various locations to in the Waco District) | 3 of 4 | $980,146 | +53% |
| 02 JUL 2026 | A00183413 | Pharr District | Construct Pedestrian Infrastructure, Various (Various Locations Districtwide to .) | 2 of 8 | $1,944,879 | 0.0% |
| 02 JUL 2026 | A00212148 | Abilene District | Bicycle And Pedestrian Improvements, FM 3438 (HARTFORD ST to 600 FT N OF LITTLE ELM CREEK) | 1 of 7 | $254,408 | Low, 15% under the second |
| 02 JUL 2026 | A00206483 | Yoakum District | Hazard Elimination & Safety, SH 71 (7.80 Mi N of Wharton C/L to Wharton C/L) | 1 of 9 | $4,778,226 | Low, 8.0% under the second |
| 01 JUL 2026 | A00219976 | Yoakum District | Construct Pedestrian Infrastructure, FM 155 (IH 10 to Near Northern City Limits of Weimar) | 5 of 10 | $1,764,754 | +8.0% |
| 03 JUN 2026 | A00206315 | Brownwood District | Construct Pedestrian Infrastructure, Various (Various locations in City of Coleman to .) | 1 of 4 | $2,189,861 | Low, 8.0% under the second |
| 02 JUN 2026 | A00193114 | Pharr District | Hazard Elimination & Safety, FM 491 (0.77 Miles North of FM 2629 to West Uncle Peter's Rd.) | 7 of 7 | $9,743,826 | +27% |
| 02 JUN 2026 | A00198038 | San Angelo District | Bicycle And Pedestrian Improvements, Various (Along BU 67H From S Milton Street to Along BU 67H To S Koenigheim Street) | 5 of 7 | $1,977,584 | +18% |
| 07 MAY 2026 | A00109269 | Pharr District | Widen Road - Add Lanes, FM 676 (SH 107 to TAYLOR RD.) | 6 of 6 | $41,704,917 | +68% |
| 07 MAY 2026 | A00185350 | Corpus Christi District | Construct Pedestrian Infrastructure, Various (Various Locations in Kingsville to .) | 1 of 8 | $1,171,489 | Low, 1.0% under the second |
| 06 MAY 2026 | A00121011 | Pharr District | Widen Road - Add Lanes, FM 2220 (FM 1925 to SH 107) | 5 of 6 | $36,832,483 | +44% |
| 06 MAY 2026 | A00206714 | Atlanta District | Bicycle And Pedestrian Improvements, FM 3527 (SH 93 at Lake Ridge Apartments to Grady T. Wallace Park) | 7 of 11 | $1,238,262 | +31% |
| 14 APR 2026 | A00220441 | Corpus Christi District | BRIDGE PREVENTATIVE MAINTENANCE, US0281 (Various In Live Oak, Nueces, Kleberg, & to San Patricio Counties) | 9 of 10 | $1,458,255 | +128% |
| 07 APR 2026 | A00192909 | Atlanta District | Hazard Elimination & Safety, SH 11 (US 59 to FM 130) | 9 of 10 | $3,012,612 | +68% |
| 05 MAR 2026 | A00198645 | Tyler District | Construct Pedestrian Infrastructure, Various (VARIOUS LOCATION to TYLER DISTRICT) | 6 of 14 | $1,179,067 | +13% |
| 04 MAR 2026 | A00197420 | San Antonio District | Rehabilitate Existing Roadway, FM 2790 (FM 471 to Medina/Atascosa C/L) | 7 of 9 | $14,280,198 | +21% |
| 24 FEB 2026 | A00218605 | Odessa District | BRIDGE PREVENTATIVE MAINTENANCE, IH0010 (VARIOUS to VARIOUS) | 11 of 12 | $728,190 | +85% |
| 05 FEB 2026 | A00193210 | Tyler District | Hazard Elimination & Safety, Various (Various Locations to in the City of Longview) | 2 of 8 | $327,546 | +11% |
| 05 FEB 2026 | A00186405 | Corpus Christi District | Bridge Replacement, US 181 (0.6 MI S of CR 1206 to 0.9 MI S of CR 1206) | 12 of 12 | $2,437,988 | +35% |
| 28 JAN 2026 | A00218355 | Amarillo District | BRIDGE PREVENTATIVE MAINTENANCE, IH0040 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | 2 of 11 | $568,644 | +14% |
| 15 JAN 2026 | A00219130 | Childress District | BRIDGE PREVENTATIVE MAINTENANCE, US0287 (Various Locations ~ See Plans to Various Locations ~ See Plans) | 10 of 11 | $1,081,018 | +88% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.