TxDOT contract A00206714 bid tabulation
Bicycle And Pedestrian Improvements, FM 3527 (SH 93 at Lake Ridge Apartments to Grady T. Wallace Park). Let by Texas DOT on May 6, 2026, Bowie, Atlanta District. 11 bids received; low bid $942,426 by THK Construction LLC, -19% against the engineer's estimate of $1,157,637.
- Owner
- Texas DOT
- Letting
- 06 MAY 2026
- Pay items
- 65
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | THK Construction LLC | $942,426 | Low | -19% |
| 2 | Highway 19 Construction LLC | $1,054,303 | +12% | -9.0% |
| 3 | CDM Holdings | $1,093,185 | +16% | -6.0% |
| 4 | Skyline Bridge LLC | $1,118,110 | +19% | -3.0% |
| 5 | Garret Shields Infrastructure | $1,132,559 | +20% | -2.0% |
| 6 | East Texas Bridge, Inc. | $1,198,651 | +27% | +4.0% |
| 7 | 3LW Civil LLC | $1,238,262 | +31% | +7.0% |
| 8 | STX Civil | $1,271,024 | +35% | +10% |
| 9 | GHB Equipment Company, L.L.C. | $1,332,727 | +41% | +15% |
| 10 | Ti-Zack Concrete, LLC | $1,384,537 | +47% | +20% |
| 11 | Icos Management, LLC | $1,438,798 | +53% | +24% |
Engineer's estimate: $1,157,637.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. THK Construction LLC | 2. Highway 19 Construction LLC | 3. CDM Holdings | 4. Skyline Bridge LLC | 5. Garret Shields Infrastructure | 6. East Texas Bridge, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (driveways) (104-7011) | SY | 302 | $25.00 | $15.00 | $25.00 | $30.09 | $20.00 | $20.00 | $35.00 |
| 2 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 130 | $25.00 | $10.00 | $25.00 | $51.65 | $30.00 | $20.00 | $35.00 |
| 3 | Removing concrete (curb & gutter) (104-7017) | LF | 219 | $15.00 | $8.00 | $10.00 | $30.66 | $15.00 | $10.00 | $12.00 |
| 4 | Remove (0"-4") TRT/untrt base & asphalt pavement (105-7001) | SY | 770 | $3.00 | $10.00 | $15.00 | $11.43 | $15.00 | $20.00 | $15.00 |
| 5 | Remove (0"-12") TRT/untrt base & asphalt pavement (105-7052) | SY | 51 | $6.00 | $15.00 | $15.00 | $183.74 | $30.00 | $30.00 | $25.00 |
| 6 | Excavation (roadway) (110-7001) | CY | 1,286 | $25.00 | $15.00 | $25.00 | $13.69 | $20.00 | $30.00 | $20.00 |
| 7 | Embankment (final)(OC)(type B) (132-7003) | CY | 43 | $110.00 | $15.00 | $100.00 | $102.33 | $100.00 | $30.00 | $30.00 |
| 8 | Embankment (final)(DC)(type C) (132-7006) | CY | 155 | $45.00 | $15.00 | $70.00 | $80.31 | $100.00 | $40.00 | $30.00 |
| 9 | Block sodding (162-7002) | SY | 7,331 | $4.50 | $5.57 | $5.00 | $5.69 | $7.50 | $8.00 | $6.50 |
| 10 | Cement (275-7001) | TON | 43 | $240.00 | $350.00 | $250.00 | $331.40 | $400.00 | $200.00 | $300.00 |
| 11 | Cement TRT (subgrade)(10") (275-7028) | SY | 3,318 | $6.00 | $10.00 | $7.00 | $22.77 | $27.00 | $20.00 | $10.00 |
| 12 | Riprap (concrete)(4 in) (432-7001) | CY | 8 | $1,000.00 | $700.00 | $1,000.00 | $846.74 | $1,500.00 | $600.00 | $1,100.00 |
| 13 | Rail (handrail)(type E) (450-7062) | LF | 502 | $180.00 | $110.54 | $110.00 | $167.40 | $150.00 | $150.00 | $150.00 |
| 14 | RC pipe (CL III)(30 in) (464-7007) | LF | 16 | $150.00 | $96.55 | $150.00 | $129.45 | $250.00 | $200.00 | $200.00 |
| 15 | RC pipe (CL III)(36 in) (464-7009) | LF | 24 | $180.00 | $133.55 | $250.00 | $150.58 | $250.00 | $200.00 | $300.00 |
| 16 | Headwall (CH - PW - S) (diameter= 36 in) (466-7120) | EACH | 1 | $15,000 | $7,000.00 | $7,500.00 | $20,338 | $18,000 | $5,000.00 | $15,000 |
| 17 | Set (type II) (30 in) (RCP) (3: 1) (C) (467-7345) | EACH | 1 | $3,000.00 | $2,375.00 | $2,700.00 | $1,551.54 | $3,500.00 | $2,500.00 | $3,500.00 |
| 18 | Adjusting manholes (479-7001) | EACH | 7 | $1,500.00 | $200.00 | $1,500.00 | $1,400.00 | $1,000.00 | $1,000.00 | $1,500.00 |
| 19 | Removing structure (set) (496-7004) | EACH | 3 | $250.00 | $250.00 | $500.00 | $1,833.50 | $500.00 | $1,000.00 | $500.00 |
| 20 | Removing structure (pipe) (496-7007) | LF | 39 | $23.00 | $100.00 | $50.00 | $22.57 | $50.00 | $30.00 | $30.00 |
| 21 | Mobilization (500-7001) | LS | 1 | $107,000 | $95,000 | $100,000 | $76,225 | $95,000 | $100,000 | $110,000 |
| 22 | Barricades, signs and traffic handling (502-7001) | MO | 11 | $5,000.00 | $1,547.57 | $2,500.00 | $3,500.00 | $2,000.00 | $5,000.00 | $4,000.00 |
| 23 | TMA (stationary) (505-7001) | DAY | 126 | $692.00 | $200.00 | $250.00 | $275.00 | $300.00 | $300.00 | $300.00 |
| 24 | TMA (mobile operation) (505-7003) | DAY | 6 | $350.00 | $400.00 | $1,000.00 | $285.00 | $50.00 | $300.00 | $350.00 |
| 25 | Rock filter dams (install) (type 2) (506-7002) | LF | 17 | $45.00 | $101.29 | $55.00 | $49.20 | $80.00 | $20.00 | $55.00 |
| 26 | Rock filter dams (remove) (506-7011) | LF | 17 | $15.00 | $54.60 | $10.00 | $13.33 | $10.00 | $10.00 | $15.00 |
| 27 | Temporary sediment control fence (install) (506-7039) | LF | 4,830 | $5.00 | $4.00 | $4.00 | $4.10 | $3.75 | $5.00 | $4.50 |
| 28 | Temporary sediment control fence (remove) (506-7041) | LF | 4,830 | $1.00 | $0.85 | $1.00 | $0.78 | $1.50 | $1.00 | $1.00 |
| 29 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 319 | $6.00 | $6.10 | $5.00 | $6.66 | $8.00 | $5.00 | $7.25 |
| 30 | Biodegradable erosion control logs (remove) (506-7046) | LF | 319 | $2.00 | $0.85 | $1.00 | $1.28 | $6.00 | $1.00 | $1.50 |
| 31 | Concrete curb & gutter (type II) (529-7009) | LF | 424 | $45.00 | $40.00 | $55.00 | $73.73 | $50.00 | $40.00 | $45.00 |
| 32 | Concrete curb (type F3) (529-7022) | LF | 191 | $180.00 | $120.00 | $100.00 | $53.75 | $80.00 | $150.00 | $150.00 |
| 33 | Driveways (concrete) (530-7006) | SY | 1,393 | $108.00 | $85.00 | $116.00 | $108.53 | $150.00 | $100.00 | $120.00 |
| 34 | Concrete sidewalks (4") (531-7001) | SY | 3,881 | $80.00 | $74.00 | $75.00 | $64.08 | $48.00 | $70.00 | $90.00 |
| 35 | Curb ramps (type 1) (531-7005) | EACH | 3 | $1,500.00 | $3,500.00 | $1,100.00 | $2,941.20 | $1,500.00 | $2,500.00 | $3,000.00 |
| 36 | Curb ramps (type 2) (531-7006) | EACH | 1 | $1,800.00 | $3,500.00 | $1,800.00 | $5,141.40 | $1,500.00 | $2,500.00 | $3,000.00 |
| 37 | Curb ramps (type 7) (531-7010) | EACH | 7 | $1,177.00 | $3,500.00 | $1,500.00 | $2,900.49 | $2,000.00 | $2,500.00 | $3,000.00 |
| 38 | Curb ramps (type 10) (531-7011) | EACH | 1 | $1,100.00 | $3,500.00 | $1,200.00 | $3,140.70 | $5,000.00 | $2,500.00 | $3,000.00 |
| 39 | Concrete sidewalks (special) (531-7025) | SY | 15 | $150.00 | $100.00 | $350.00 | $1,191.71 | $500.00 | $200.00 | $500.00 |
| 40 | Remove and install existing gate (550-7017) | EACH | 1 | $2,500.00 | $5,000.00 | $500.00 | $2,250.00 | $5,000.00 | $2,000.00 | $2,500.00 |
| 41 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 15 | $13.00 | $12.60 | $30.00 | $12.30 | $30.00 | $90.00 | $13.50 |
| 42 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 35 | $23.00 | $24.68 | $40.00 | $24.09 | $40.00 | $90.00 | $26.00 |
| 43 | Conduit (prepare) (618-7090) | LF | 120 | $5.00 | $6.30 | $5.00 | $6.15 | $10.00 | $60.00 | $6.60 |
| 44 | Electrical conductor (no.6) bare (620-7009) | LF | 60 | $3.00 | $3.15 | $5.00 | $3.08 | $4.00 | $55.00 | $3.30 |
| 45 | Remove electrical services (628-7002) | EACH | 1 | $1,000.00 | $787.50 | $2,000.00 | $768.75 | $1,250.00 | $2,500.00 | $825.00 |
| 46 | Elc SRV type T 120/240 000(NS)GS(N)SP(O) (628-7326) | EACH | 1 | $4,000.00 | $9,607.50 | $1,500.00 | $5,278.75 | $7,200.00 | $10,000 | $5,700.00 |
| 47 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 7 | $715.00 | $733.95 | $850.00 | $685.73 | $900.00 | $800.00 | $900.00 |
| 48 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 3 | $800.00 | $771.75 | $750.00 | $753.38 | $1,100.00 | $800.00 | $1,000.00 |
| 49 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 3 | $800.00 | $1,254.75 | $1,100.00 | $1,224.88 | $1,500.00 | $800.00 | $1,250.00 |
| 50 | Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026) | EACH | 1 | $1,000.00 | $1,244.25 | $1,000.00 | $1,214.63 | $1,500.00 | $1,000.00 | $1,300.00 |
| 51 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | $1,200.00 | $2,304.75 | $1,000.00 | $1,224.88 | $1,500.00 | $1,000.00 | $1,350.00 |
| 52 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 6 | $500.00 | $523.95 | $950.00 | $511.48 | $700.00 | $800.00 | $600.00 |
| 53 | Remove SM RD SN sup&AM (644-7073) | EACH | 17 | $115.00 | $82.95 | $100.00 | $100.00 | $100.00 | $100.00 | $115.00 |
| 54 | Install object marker assembly (OM-2Y)(WC)GND (658-7056) | EACH | 3 | $68.00 | $68.25 | $75.00 | $66.63 | $100.00 | $40.00 | $100.00 |
| 55 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 283 | $5.00 | $3.76 | $20.00 | $10.25 | $35.00 | $9.00 | $11.00 |
| 56 | Install highway traffic signal (upgrade) (680-7011) | EACH | 2 | $12,000 | $5,407.50 | $15,000 | $6,995.63 | $8,000.00 | $3,000.00 | $7,500.00 |
| 57 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 2 | $900.00 | $474.60 | $1,100.00 | $463.30 | $700.00 | $1,000.00 | $500.00 |
| 58 | Traffic signal CBL (type A)(12 AWG)(3 conductor) (684-7008) | LF | 40 | $2.00 | $3.68 | $5.00 | $3.59 | $5.00 | $50.00 | $4.00 |
| 59 | Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010) | LF | 260 | $3.00 | $4.46 | $6.00 | $4.36 | $7.50 | $45.00 | $4.75 |
| 60 | Relocate RDSD flash beacon assembly (685-7002) | EACH | 1 | $5,000.00 | $4,205.25 | $5,000.00 | $4,105.13 | $5,500.00 | $6,000.00 | $4,500.00 |
| 61 | Pedestrian pole assembly (687-7001) | EACH | 2 | $3,000.00 | $4,312.35 | $5,000.00 | $4,209.68 | $5,500.00 | $4,500.00 | $4,600.00 |
| 62 | Pedestrian detect push button (APS) (688-7001) | EACH | 2 | $1,000.00 | $1,038.45 | $5,000.00 | $1,013.73 | $1,300.00 | $1,500.00 | $1,100.00 |
| 63 | Pedestrian detector controller unit (688-7003) | EACH | 1 | $4,000.00 | $3,465.00 | $4,000.00 | $3,382.50 | $4,000.00 | $5,000.00 | $3,700.00 |
| 64 | Concrete scupper (5032-7001) | EACH | 2 | $5,000.00 | $3,000.00 | $4,000.00 | $5,084.00 | $5,000.00 | $3,000.00 | $5,000.00 |
| 65 | Ground box W/ apron (adjust) (6013-7008) | EACH | 1 | $1,000.00 | $1,470.00 | $1,500.00 | $1,435.00 | $2,000.00 | $1,000.00 | $1,600.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 6, 2026. Compiled by Mirage Metrics.