GHB Equipment Company, L.L.C.: TxDOT bid record

GHB Equipment Company, L.L.C. submitted 50 bids on Texas DOT contracts in the data, from 19 MAR 2020 to 12 NOV 2026, and was the low bidder on 6 of them (12%). When it was not low, its total sat a median +30% above the low bid.

Owner
Texas DOT
Low bid volume
$11,676,330
Latest bid
12 NOV 2026
Data through
19 NOV 2026
50Bids
6Low bids
12Win rate, percent
+30%Median gap to the low bid when not low, 43 bids

By year

YearBidsLow bidsWin rate
2020500%
2021500%
20225360%
20233133%
2024200%
202510110%
20262015%
GHB Equipment Company, L.L.C., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Paris District22314%
Dallas District1100%
Tyler District6117%
Atlanta District3133%
Amarillo District200%
Wichita Falls District2150%
Lubbock District100%
Brownwood District100%
Pharr District100%
Odessa District100%
GHB Equipment Company, L.L.C., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
TMA (stationary)505-7001DAY4611 (24%)$300.00$230.00
Portable changeable message sign503-7001DAY298 (28%)$100.00$100.00
Barricades, signs and traffic handling502-7001MO436 (14%)$7,200.00$5,000.00
Concrete structure repair (vertical & overhead)429-7007SF154 (27%)$150.00$220.00
Riprap (concrete)(5 in)432-7002CY104 (40%)$512.50$640.65
Portable changeable message sign503-7002EACH133 (23%)$10,000$10,000
Riprap (mow strip)(4 in)432-7013CY93 (33%)$550.00$643.00
Full - depth repair CPCD (10")361-6035SY63 (50%)$300.00$281.00
Riprap (concrete)(4 in)432-7001CY53 (60%)$500.00$650.00
Full - depth repair CRCP (8"-14")361-6052SY53 (60%)$330.00$390.31
Guardrail end treatment (install)544-7001EACH102 (20%)$3,000.00$3,245.00
Cleaning and sealing existing joints438-7001LF102 (20%)$40.00$44.00
GHB Equipment Company, L.L.C., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

GHB Equipment Company, L.L.C., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
12 NOV 2026A00223997Dallas DistrictCONCRETE SPALL REPAIR, US0075 (VARIOUS ROADWAYS IN THE COLLIN to COUNTY MAINTENANCE SECTION)3 of 6$743,150+21%
15 OCT 2026A00223685Paris DistrictBRIDGE PREVENTATIVE MAINTENANCE, IH0030 (Various locations in to Hopkins County)10 of 11$324,760+28%
11 AUG 2026A00221404Tyler DistrictBRIDGE PREVENTATIVE MAINTENANCE, IH0020 (Various Bridges in to Tyler District)8 of 13$246,334+85%
05 AUG 2026A00206966Paris DistrictConstruct Pedestrian Infrastructure, SH 5 (Newport Drive to Umphress Street)7 of 10$1,177,990+19%
21 JUL 2026A00220735Tyler DistrictBRIDGE PREVENTATIVE MAINTENANCE, IH0020 (Various Bridges in Gregg and Rusk Co to in the Tyler District)1 of 3$473,835Low, 22% under the second
21 JUL 2026A00222462Tyler DistrictBRIDGE PREVENTATIVE MAINTENANCE, IH0020 (Various Bridges in to Smith, Cherokee, and Wood Counties)4 of 5$771,605+39%
08 JUL 2026A00219961Dallas DistrictBRIDGE JOINT CLEANING AND SEALING, US0075 (VARIOUS ROADWAYS to IN THE COLLIN MAINTENANCE SECTION)3 of 9$119,119+20%
02 JUL 2026A00213157Wichita Falls DistrictBridge Maintenance, US 281 (At SH 79 SB / FM 369 WB Connector to .)2 of 10$1,845,048+7.0%
01 JUL 2026A00139849Brownwood DistrictRepair Roadway, IH 20 (1.1 Mi West of SH 16 to SH 16)3 of 4$1,144,067+11%
10 JUN 2026A00219815Dallas DistrictCULVERT REPLACEMENT, FM 455 (AT FM0455 to 0.30 MILES WEST OF FM 2478)2 of 5$114,164+4.0%
04 JUN 2026A00222277Pharr DistrictBRIDGE PREVENTATIVE MAINTENANCE, IH0002 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)3 of 5$842,250+49%
02 JUN 2026A00206681Paris DistrictHazard Elimination & Safety, FM 1497 (SL 286 to FM 1184)4 of 5$1,147,949+77%
13 MAY 2026A00219086Dallas DistrictBRIDGE JOINT CLEANING AND SEALING, SH0114 (VARIOUS ROADWAYS IN to DENTON COUNTY MAINTENANCE SECTION)8 of 9$398,286+67%
06 MAY 2026A00206714Atlanta DistrictBicycle And Pedestrian Improvements, FM 3527 (SH 93 at Lake Ridge Apartments to Grady T. Wallace Park)9 of 11$1,332,727+41%
16 APR 2026A00214351Paris DistrictBRIDGE PREVENTATIVE MAINTENANCE, US0082 (Various locations in to Paris District)2 of 7$496,015+18%
16 APR 2026A00220064Paris DistrictCULVERT REPAIR, SH0037 (Spur 423 to SH 37)7 of 8$192,070+58%
24 FEB 2026A00218605Odessa DistrictBRIDGE PREVENTATIVE MAINTENANCE, IH0010 (VARIOUS to VARIOUS)7 of 12$479,332+22%
11 FEB 2026A00217097Dallas DistrictFULL DEPTH CONCRETE REPAIR, FM0407 (VARIOUS ROADWAYS to DENTON COUNTY MAINTENANCE SECTION)4 of 5$987,800+80%
28 JAN 2026A00218355Amarillo DistrictBRIDGE PREVENTATIVE MAINTENANCE, IH0040 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets)9 of 11$868,845+74%
14 JAN 2026A00216266Dallas DistrictBRIDGE JOINT REPLACEMENT, US0380 (0.15 MI WEST OF CR0559 to 1.17 MI WEST OF CR0560)9 of 9$159,100+195%
02 DEC 2025A00217303Dallas DistrictFULL DEPTH CONCRETE REPAIR, IH0020 (Various Roadways in the Kaufman - to Rockwall Maintenance Section)3 of 8$1,977,364+16%
12 NOV 2025A00216530Tyler DistrictBRIDGE RAIL REPAIR, US0080 (VARIOUS BRIDGES to IN THE TYLER DISTRICT)2 of 7$159,836+12%
18 SEP 2025A00214350Paris DistrictBRIDGE PREVENTATIVE MAINTENANCE, US0082 (Various locations in to Grayson County)6 of 9$144,100+66%
05 SEP 2025A00193579Paris DistrictHazard Elimination & Safety, BU 82H (Loop 286 to 11th NW St)6 of 9$1,695,450+26%
24 JUL 2025A00214348Paris DistrictBRIDGE PREVENTATIVE MAINTENANCE, IH0030 (Various locations in to Paris District)5 of 7$348,711+67%
GHB Equipment Company, L.L.C.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy