GHB Equipment Company, L.L.C.: TxDOT bid record
GHB Equipment Company, L.L.C. submitted 50 bids on Texas DOT contracts in the data, from 19 MAR 2020 to 12 NOV 2026, and was the low bidder on 6 of them (12%). When it was not low, its total sat a median +30% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $11,676,330
- Latest bid
- 12 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 5 | 0 | 0% |
| 2021 | 5 | 0 | 0% |
| 2022 | 5 | 3 | 60% |
| 2023 | 3 | 1 | 33% |
| 2024 | 2 | 0 | 0% |
| 2025 | 10 | 1 | 10% |
| 2026 | 20 | 1 | 5% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Paris District | 22 | 3 | 14% |
| Dallas District | 11 | 0 | 0% |
| Tyler District | 6 | 1 | 17% |
| Atlanta District | 3 | 1 | 33% |
| Amarillo District | 2 | 0 | 0% |
| Wichita Falls District | 2 | 1 | 50% |
| Lubbock District | 1 | 0 | 0% |
| Brownwood District | 1 | 0 | 0% |
| Pharr District | 1 | 0 | 0% |
| Odessa District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| TMA (stationary) | 505-7001 | DAY | 46 | 11 (24%) | $300.00 | $230.00 |
| Portable changeable message sign | 503-7001 | DAY | 29 | 8 (28%) | $100.00 | $100.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 43 | 6 (14%) | $7,200.00 | $5,000.00 |
| Concrete structure repair (vertical & overhead) | 429-7007 | SF | 15 | 4 (27%) | $150.00 | $220.00 |
| Riprap (concrete)(5 in) | 432-7002 | CY | 10 | 4 (40%) | $512.50 | $640.65 |
| Portable changeable message sign | 503-7002 | EACH | 13 | 3 (23%) | $10,000 | $10,000 |
| Riprap (mow strip)(4 in) | 432-7013 | CY | 9 | 3 (33%) | $550.00 | $643.00 |
| Full - depth repair CPCD (10") | 361-6035 | SY | 6 | 3 (50%) | $300.00 | $281.00 |
| Riprap (concrete)(4 in) | 432-7001 | CY | 5 | 3 (60%) | $500.00 | $650.00 |
| Full - depth repair CRCP (8"-14") | 361-6052 | SY | 5 | 3 (60%) | $330.00 | $390.31 |
| Guardrail end treatment (install) | 544-7001 | EACH | 10 | 2 (20%) | $3,000.00 | $3,245.00 |
| Cleaning and sealing existing joints | 438-7001 | LF | 10 | 2 (20%) | $40.00 | $44.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| O. Trevino Construction, LLC | 22 | 10 of 22 |
| Garret Shields Infrastructure | 16 | 12 of 16 |
| Highway 19 Construction LLC | 14 | 12 of 14 |
| Icos Management, LLC | 13 | 9 of 13 |
| FNH Construction, LLC | 11 | 0 of 11 |
| SCR Civil Construction, LLC | 11 | 5 of 11 |
| Road Doctors LLC | 10 | 6 of 10 |
| Built Right Construction of Oklahoma, LLC | 9 | 2 of 9 |
| Structural Integrity Group LLC | 9 | 6 of 9 |
| Gibson & Associates, Inc. | 8 | 4 of 8 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | A00223997 | Dallas District | CONCRETE SPALL REPAIR, US0075 (VARIOUS ROADWAYS IN THE COLLIN to COUNTY MAINTENANCE SECTION) | 3 of 6 | $743,150 | +21% |
| 15 OCT 2026 | A00223685 | Paris District | BRIDGE PREVENTATIVE MAINTENANCE, IH0030 (Various locations in to Hopkins County) | 10 of 11 | $324,760 | +28% |
| 11 AUG 2026 | A00221404 | Tyler District | BRIDGE PREVENTATIVE MAINTENANCE, IH0020 (Various Bridges in to Tyler District) | 8 of 13 | $246,334 | +85% |
| 05 AUG 2026 | A00206966 | Paris District | Construct Pedestrian Infrastructure, SH 5 (Newport Drive to Umphress Street) | 7 of 10 | $1,177,990 | +19% |
| 21 JUL 2026 | A00220735 | Tyler District | BRIDGE PREVENTATIVE MAINTENANCE, IH0020 (Various Bridges in Gregg and Rusk Co to in the Tyler District) | 1 of 3 | $473,835 | Low, 22% under the second |
| 21 JUL 2026 | A00222462 | Tyler District | BRIDGE PREVENTATIVE MAINTENANCE, IH0020 (Various Bridges in to Smith, Cherokee, and Wood Counties) | 4 of 5 | $771,605 | +39% |
| 08 JUL 2026 | A00219961 | Dallas District | BRIDGE JOINT CLEANING AND SEALING, US0075 (VARIOUS ROADWAYS to IN THE COLLIN MAINTENANCE SECTION) | 3 of 9 | $119,119 | +20% |
| 02 JUL 2026 | A00213157 | Wichita Falls District | Bridge Maintenance, US 281 (At SH 79 SB / FM 369 WB Connector to .) | 2 of 10 | $1,845,048 | +7.0% |
| 01 JUL 2026 | A00139849 | Brownwood District | Repair Roadway, IH 20 (1.1 Mi West of SH 16 to SH 16) | 3 of 4 | $1,144,067 | +11% |
| 10 JUN 2026 | A00219815 | Dallas District | CULVERT REPLACEMENT, FM 455 (AT FM0455 to 0.30 MILES WEST OF FM 2478) | 2 of 5 | $114,164 | +4.0% |
| 04 JUN 2026 | A00222277 | Pharr District | BRIDGE PREVENTATIVE MAINTENANCE, IH0002 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | 3 of 5 | $842,250 | +49% |
| 02 JUN 2026 | A00206681 | Paris District | Hazard Elimination & Safety, FM 1497 (SL 286 to FM 1184) | 4 of 5 | $1,147,949 | +77% |
| 13 MAY 2026 | A00219086 | Dallas District | BRIDGE JOINT CLEANING AND SEALING, SH0114 (VARIOUS ROADWAYS IN to DENTON COUNTY MAINTENANCE SECTION) | 8 of 9 | $398,286 | +67% |
| 06 MAY 2026 | A00206714 | Atlanta District | Bicycle And Pedestrian Improvements, FM 3527 (SH 93 at Lake Ridge Apartments to Grady T. Wallace Park) | 9 of 11 | $1,332,727 | +41% |
| 16 APR 2026 | A00214351 | Paris District | BRIDGE PREVENTATIVE MAINTENANCE, US0082 (Various locations in to Paris District) | 2 of 7 | $496,015 | +18% |
| 16 APR 2026 | A00220064 | Paris District | CULVERT REPAIR, SH0037 (Spur 423 to SH 37) | 7 of 8 | $192,070 | +58% |
| 24 FEB 2026 | A00218605 | Odessa District | BRIDGE PREVENTATIVE MAINTENANCE, IH0010 (VARIOUS to VARIOUS) | 7 of 12 | $479,332 | +22% |
| 11 FEB 2026 | A00217097 | Dallas District | FULL DEPTH CONCRETE REPAIR, FM0407 (VARIOUS ROADWAYS to DENTON COUNTY MAINTENANCE SECTION) | 4 of 5 | $987,800 | +80% |
| 28 JAN 2026 | A00218355 | Amarillo District | BRIDGE PREVENTATIVE MAINTENANCE, IH0040 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | 9 of 11 | $868,845 | +74% |
| 14 JAN 2026 | A00216266 | Dallas District | BRIDGE JOINT REPLACEMENT, US0380 (0.15 MI WEST OF CR0559 to 1.17 MI WEST OF CR0560) | 9 of 9 | $159,100 | +195% |
| 02 DEC 2025 | A00217303 | Dallas District | FULL DEPTH CONCRETE REPAIR, IH0020 (Various Roadways in the Kaufman - to Rockwall Maintenance Section) | 3 of 8 | $1,977,364 | +16% |
| 12 NOV 2025 | A00216530 | Tyler District | BRIDGE RAIL REPAIR, US0080 (VARIOUS BRIDGES to IN THE TYLER DISTRICT) | 2 of 7 | $159,836 | +12% |
| 18 SEP 2025 | A00214350 | Paris District | BRIDGE PREVENTATIVE MAINTENANCE, US0082 (Various locations in to Grayson County) | 6 of 9 | $144,100 | +66% |
| 05 SEP 2025 | A00193579 | Paris District | Hazard Elimination & Safety, BU 82H (Loop 286 to 11th NW St) | 6 of 9 | $1,695,450 | +26% |
| 24 JUL 2025 | A00214348 | Paris District | BRIDGE PREVENTATIVE MAINTENANCE, IH0030 (Various locations in to Paris District) | 5 of 7 | $348,711 | +67% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.