TxDOT contract A00206681 bid tabulation
Hazard Elimination & Safety, FM 1497 (SL 286 to FM 1184). Let by Texas DOT on June 2, 2026, Lamar, Paris District. 5 bids received; low bid $648,365 by THK Construction LLC, -20% against the engineer's estimate of $806,243.
- Owner
- Texas DOT
- Letting
- 02 JUN 2026
- Pay items
- 63
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | THK Construction LLC | $648,365 | Low | -20% |
| 2 | RB Contracting, LLC | $1,020,536 | +57% | +27% |
| 3 | CDM Holdings | $1,140,139 | +76% | +41% |
| 4 | GHB Equipment Company, L.L.C. | $1,147,949 | +77% | +42% |
| 5 | Icos Management, LLC | $1,197,206 | +85% | +48% |
Engineer's estimate: $806,243.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. THK Construction LLC | 2. RB Contracting, LLC | 3. CDM Holdings | 4. GHB Equipment Company, L.L.C. | 5. Icos Management, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 86 | $1,150.00 | $700.00 | $1,500.00 | $1,655.00 | $1,500.00 | $770.00 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 58 | $15.00 | $10.00 | $50.00 | $125.00 | $20.00 | $22.00 |
| 3 | Removing concrete (sawcut) (104-7020) | LF | 30 | $27.00 | $10.00 | $50.00 | $290.00 | $20.00 | $28.00 |
| 4 | Removing concrete (miscellaneous) (104-7046) | SY | 11 | $20.00 | $10.00 | $175.00 | $115.00 | $20.00 | $28.00 |
| 5 | Excavation (channel) (110-7002) | CY | 45 | $50.00 | $10.00 | $40.00 | $92.00 | $50.00 | $110.00 |
| 6 | Embankment (vehicle)(OC)(type B) (132-7015) | CY | 4,865 | $22.50 | $10.00 | $37.00 | $41.75 | $40.00 | $22.00 |
| 7 | Spec excavation work (hyd excavator) (158-7002) | HR | 150 | $200.00 | $25.00 | $150.00 | $415.00 | $135.00 | $330.00 |
| 8 | Broadcast seed (temporary_warm_cool) (164-7007) | SY | 39,353 | $0.25 | $0.13 | $0.30 | $0.16 | $0.24 | $0.16 |
| 9 | Hydro mulch seed (permanent_rural_clay) (164-7018) | SY | 19,678 | $0.45 | $0.42 | $0.58 | $0.49 | $0.70 | $0.48 |
| 10 | Vegetative watering (168-7001) | TGL | 122 | $15.00 | $1.00 | $91.00 | $10.00 | $25.00 | $33.00 |
| 11 | Cut & restore concrete paving (400-7007) | SY | 24 | $155.00 | $150.00 | $300.00 | $250.00 | $225.00 | $385.00 |
| 12 | Cut & restore asphalt paving (400-7008) | SY | 56 | $130.00 | $150.00 | $150.00 | $131.00 | $175.00 | $302.00 |
| 13 | Cut and restore pavement (flex base) (400-7009) | SY | 51 | $40.00 | $100.00 | $100.00 | $170.00 | $150.00 | $220.00 |
| 14 | Flowable backfill (401-7001) | CY | 32 | $400.00 | $350.00 | $300.00 | $525.00 | $400.00 | $302.00 |
| 15 | Trench excavation protection (402-7001) | LF | 15 | $9.32 | $5.00 | $15.00 | $28.00 | $140.00 | $220.00 |
| 16 | Temporary special shoring (403-7001) | SF | 540 | $28.00 | $25.00 | $20.00 | $14.00 | $50.00 | $22.00 |
| 17 | Class C concrete (collar) (420-7061) | EACH | 7 | $1,500.00 | $1,000.00 | $1,000.00 | $1,368.00 | $1,100.00 | $2,200.00 |
| 18 | Concrete structure repair (epoxy mortar) (429-7002) | SF | 20 | $75.00 | $140.00 | $200.00 | $350.00 | $250.00 | $275.00 |
| 19 | Riprap (concrete)(5 in) (432-7002) | CY | 5 | $600.00 | $700.00 | $500.00 | $1,120.00 | $500.00 | $990.00 |
| 20 | Riprap (mow strip)(4 in) (432-7013) | CY | 43 | $572.00 | $700.00 | $750.00 | $650.00 | $500.00 | $880.00 |
| 21 | Riprap (stone protection)(12 in) (432-7041) | CY | 39 | $145.00 | $150.00 | $150.00 | $236.00 | $175.00 | $198.00 |
| 22 | Riprap (stone protection)(18 in) (432-7043) | CY | 321 | $160.00 | $150.00 | $175.00 | $184.75 | $200.00 | $220.00 |
| 23 | RC pipe (CL III)(18 in) (464-7003) | LF | 378 | $48.00 | $50.00 | $50.00 | $74.75 | $100.00 | $99.00 |
| 24 | RC pipe (CL III)(24 in) (464-7005) | LF | 70 | $90.00 | $62.28 | $80.00 | $106.55 | $150.00 | $121.00 |
| 25 | RC pipe (CL III)(36 in) (464-7009) | LF | 224 | $140.00 | $105.75 | $120.00 | $151.50 | $200.00 | $275.00 |
| 26 | RC pipe (CL III)(42 in) (464-7010) | LF | 50 | $185.00 | $132.70 | $200.00 | $209.10 | $350.00 | $373.00 |
| 27 | RC pipe (CL III)(48 in) (464-7011) | LF | 24 | $230.00 | $224.80 | $275.00 | $315.75 | $450.00 | $484.00 |
| 28 | Headwall (CH - PW - 0) (diameter= 48 in) (466-7107) | EACH | 1 | $14,500 | $12,000 | $10,500 | $18,592 | $5,000.00 | $27,500 |
| 29 | Set (type I)(S= 3 FT)(HW= 3 FT)(6:1)(P) (467-7043) | EACH | 2 | $6,468.00 | $6,000.00 | $14,000 | $14,336 | $2,100.00 | $19,800 |
| 30 | Set (type II) (18 in) (CMP) (6: 1) (P) (467-7304) | EACH | 8 | $1,500.00 | $700.00 | $850.00 | $815.00 | $1,800.00 | $1,540.00 |
| 31 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 27 | $1,000.00 | $700.00 | $850.00 | $862.00 | $1,800.00 | $1,760.00 |
| 32 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 4 | $2,200.00 | $1,025.00 | $1,500.00 | $1,442.00 | $3,500.00 | $2,420.00 |
| 33 | Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368) | EACH | 3 | $4,800.00 | $4,145.15 | $7,000.00 | $5,799.00 | $5,000.00 | $9,900.00 |
| 34 | Set (type II) (42 in) (RCP) (6: 1) (P) (467-7380) | EACH | 4 | $9,200.00 | $5,416.20 | $8,000.00 | $6,879.00 | $8,000.00 | $15,400 |
| 35 | Set (removing & reinstall) (467-7472) | EACH | 4 | $1,000.00 | $250.00 | $500.00 | $1,036.00 | $1,000.00 | $2,200.00 |
| 36 | Removing & RE - lay pipe (18 in) (472-7004) | LF | 52 | $50.00 | $20.00 | $25.00 | $39.85 | $125.00 | $66.00 |
| 37 | Removing & RE - lay pipe (36 in) (472-7011) | LF | 120 | $80.00 | $20.00 | $25.00 | $34.50 | $150.00 | $88.00 |
| 38 | Clean existing culverts (480-7001) | EACH | 3 | $1,500.00 | $250.00 | $1,000.00 | $2,072.00 | $3,000.00 | $6,600.00 |
| 39 | Removing structure (set) (496-7004) | EACH | 23 | $357.00 | $100.00 | $100.00 | $540.00 | $1,000.00 | $1,100.00 |
| 40 | Removing structure (headwall) (496-7006) | EACH | 1 | $1,000.00 | $500.00 | $1,000.00 | $8,288.00 | $1,500.00 | $2,750.00 |
| 41 | Removing structure (pipe) (496-7007) | LF | 490 | $20.00 | $5.00 | $10.00 | $33.90 | $40.00 | $11.00 |
| 42 | Mobilization (500-7001) | LS | 1 | $1.00 | $50,000 | $85,000 | $75,000 | $70,000 | $55,000 |
| 43 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $5,000.00 | $1,728.14 | $1,500.00 | $5,000.00 | $5,000.00 | $5,500.00 |
| 44 | Portable changeable message sign (503-7002) | EACH | 2 | $12,000 | $5,000.00 | $15,000 | $7,280.00 | $5,000.00 | $8,800.00 |
| 45 | TMA (stationary) (505-7001) | DAY | 40 | $225.00 | $250.00 | $375.00 | $235.00 | $750.00 | $275.00 |
| 46 | Rock filter dams (install) (type 2) (506-7002) | LF | 60 | $60.00 | $59.45 | $60.00 | $61.25 | $75.00 | $66.00 |
| 47 | Rock filter dams (remove) (506-7011) | LF | 60 | $12.81 | $41.00 | $25.00 | $30.60 | $30.00 | $66.00 |
| 48 | Temporary sediment control fence (install) (506-7039) | LF | 525 | $6.00 | $5.54 | $5.00 | $5.10 | $10.00 | $5.00 |
| 49 | Temporary sediment control fence (remove) (506-7041) | LF | 525 | $1.02 | $1.03 | $2.00 | $1.00 | $5.00 | $1.00 |
| 50 | Driveways (base) (530-7015) | SY | 55 | $75.00 | $25.00 | $35.00 | $163.00 | $50.00 | $385.00 |
| 51 | Turnouts (ACP) (530-7018) | SY | 704 | $65.00 | $115.00 | $95.00 | $80.80 | $50.00 | $99.00 |
| 52 | Metal W-beam guard fence (steel post) (540-7002) | LF | 325 | $26.91 | $29.22 | $36.00 | $29.60 | $35.00 | $40.00 |
| 53 | Remove metal beam guard fence (542-7001) | LF | 625 | $2.30 | $2.57 | $3.00 | $2.05 | $15.00 | $5.00 |
| 54 | Remove terminal anchor section (542-7002) | EACH | 5 | $140.00 | $205.00 | $245.00 | $204.00 | $600.00 | $168.00 |
| 55 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,000.00 | $3,254.38 | $3,800.00 | $3,162.00 | $2,500.00 | $3,730.00 |
| 56 | Guardrail end treatment (remove) (544-7003) | EACH | 1 | $200.00 | $205.00 | $245.00 | $204.00 | $1,000.00 | $550.00 |
| 57 | Mailbox install-M (TWG-post) type 1 (560-7001) | EACH | 2 | $604.00 | $716.48 | $950.00 | $790.50 | $1,000.00 | $1,100.00 |
| 58 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 52 | $313.00 | $371.05 | $425.00 | $351.90 | $375.00 | $550.00 |
| 59 | Mailbox install-D (TWG-post) type 2 (560-7003) | EACH | 8 | $361.00 | $418.20 | $525.00 | $433.50 | $650.00 | $660.00 |
| 60 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 1 | $800.00 | $169.13 | $850.00 | $713.00 | $750.00 | $1,100.00 |
| 61 | Install delineator assembly (D-SW)SZ 1(WFLX)GND (658-7003) | EACH | 68 | $30.00 | $46.13 | $55.00 | $44.00 | $100.00 | $110.00 |
| 62 | CNC crack repair (discrete)(inject) (780-7002) | LF | 12 | $70.00 | $20.00 | $300.00 | $175.00 | $200.00 | $220.00 |
| 63 | CNC crack repair (flood)(gravity) (780-7005) | SF | 14 | $50.00 | $20.00 | $110.00 | $125.00 | $100.00 | $220.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 2, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.