TxDOT contract A00206681 bid tabulation

Hazard Elimination & Safety, FM 1497 (SL 286 to FM 1184). Let by Texas DOT on June 2, 2026, Lamar, Paris District. 5 bids received; low bid $648,365 by THK Construction LLC, -20% against the engineer's estimate of $806,243.

Owner
Texas DOT
Letting
02 JUN 2026
Pay items
63
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1THK Construction LLC$648,365Low-20%
2RB Contracting, LLC$1,020,536+57%+27%
3CDM Holdings$1,140,139+76%+41%
4GHB Equipment Company, L.L.C.$1,147,949+77%+42%
5Icos Management, LLC$1,197,206+85%+48%
TxDOT contract A00206681: bids by rank

Engineer's estimate: $806,243.

Bid tabulation

LinePay itemUnitQuantityEstimate1. THK Construction LLC2. RB Contracting, LLC3. CDM Holdings4. GHB Equipment Company, L.L.C.5. Icos Management, LLC
1Preparing row (100-7002)STA86$1,150.00$700.00$1,500.00$1,655.00$1,500.00$770.00
2Removing concrete (riprap) (104-7006)SY58$15.00$10.00$50.00$125.00$20.00$22.00
3Removing concrete (sawcut) (104-7020)LF30$27.00$10.00$50.00$290.00$20.00$28.00
4Removing concrete (miscellaneous) (104-7046)SY11$20.00$10.00$175.00$115.00$20.00$28.00
5Excavation (channel) (110-7002)CY45$50.00$10.00$40.00$92.00$50.00$110.00
6Embankment (vehicle)(OC)(type B) (132-7015)CY4,865$22.50$10.00$37.00$41.75$40.00$22.00
7Spec excavation work (hyd excavator) (158-7002)HR150$200.00$25.00$150.00$415.00$135.00$330.00
8Broadcast seed (temporary_warm_cool) (164-7007)SY39,353$0.25$0.13$0.30$0.16$0.24$0.16
9Hydro mulch seed (permanent_rural_clay) (164-7018)SY19,678$0.45$0.42$0.58$0.49$0.70$0.48
10Vegetative watering (168-7001)TGL122$15.00$1.00$91.00$10.00$25.00$33.00
11Cut & restore concrete paving (400-7007)SY24$155.00$150.00$300.00$250.00$225.00$385.00
12Cut & restore asphalt paving (400-7008)SY56$130.00$150.00$150.00$131.00$175.00$302.00
13Cut and restore pavement (flex base) (400-7009)SY51$40.00$100.00$100.00$170.00$150.00$220.00
14Flowable backfill (401-7001)CY32$400.00$350.00$300.00$525.00$400.00$302.00
15Trench excavation protection (402-7001)LF15$9.32$5.00$15.00$28.00$140.00$220.00
16Temporary special shoring (403-7001)SF540$28.00$25.00$20.00$14.00$50.00$22.00
17Class C concrete (collar) (420-7061)EACH7$1,500.00$1,000.00$1,000.00$1,368.00$1,100.00$2,200.00
18Concrete structure repair (epoxy mortar) (429-7002)SF20$75.00$140.00$200.00$350.00$250.00$275.00
19Riprap (concrete)(5 in) (432-7002)CY5$600.00$700.00$500.00$1,120.00$500.00$990.00
20Riprap (mow strip)(4 in) (432-7013)CY43$572.00$700.00$750.00$650.00$500.00$880.00
21Riprap (stone protection)(12 in) (432-7041)CY39$145.00$150.00$150.00$236.00$175.00$198.00
22Riprap (stone protection)(18 in) (432-7043)CY321$160.00$150.00$175.00$184.75$200.00$220.00
23RC pipe (CL III)(18 in) (464-7003)LF378$48.00$50.00$50.00$74.75$100.00$99.00
24RC pipe (CL III)(24 in) (464-7005)LF70$90.00$62.28$80.00$106.55$150.00$121.00
25RC pipe (CL III)(36 in) (464-7009)LF224$140.00$105.75$120.00$151.50$200.00$275.00
26RC pipe (CL III)(42 in) (464-7010)LF50$185.00$132.70$200.00$209.10$350.00$373.00
27RC pipe (CL III)(48 in) (464-7011)LF24$230.00$224.80$275.00$315.75$450.00$484.00
28Headwall (CH - PW - 0) (diameter= 48 in) (466-7107)EACH1$14,500$12,000$10,500$18,592$5,000.00$27,500
29Set (type I)(S= 3 FT)(HW= 3 FT)(6:1)(P) (467-7043)EACH2$6,468.00$6,000.00$14,000$14,336$2,100.00$19,800
30Set (type II) (18 in) (CMP) (6: 1) (P) (467-7304)EACH8$1,500.00$700.00$850.00$815.00$1,800.00$1,540.00
31Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH27$1,000.00$700.00$850.00$862.00$1,800.00$1,760.00
32Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH4$2,200.00$1,025.00$1,500.00$1,442.00$3,500.00$2,420.00
33Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368)EACH3$4,800.00$4,145.15$7,000.00$5,799.00$5,000.00$9,900.00
34Set (type II) (42 in) (RCP) (6: 1) (P) (467-7380)EACH4$9,200.00$5,416.20$8,000.00$6,879.00$8,000.00$15,400
35Set (removing & reinstall) (467-7472)EACH4$1,000.00$250.00$500.00$1,036.00$1,000.00$2,200.00
36Removing & RE - lay pipe (18 in) (472-7004)LF52$50.00$20.00$25.00$39.85$125.00$66.00
37Removing & RE - lay pipe (36 in) (472-7011)LF120$80.00$20.00$25.00$34.50$150.00$88.00
38Clean existing culverts (480-7001)EACH3$1,500.00$250.00$1,000.00$2,072.00$3,000.00$6,600.00
39Removing structure (set) (496-7004)EACH23$357.00$100.00$100.00$540.00$1,000.00$1,100.00
40Removing structure (headwall) (496-7006)EACH1$1,000.00$500.00$1,000.00$8,288.00$1,500.00$2,750.00
41Removing structure (pipe) (496-7007)LF490$20.00$5.00$10.00$33.90$40.00$11.00
42Mobilization (500-7001)LS1$1.00$50,000$85,000$75,000$70,000$55,000
43Barricades, signs and traffic handling (502-7001)MO6$5,000.00$1,728.14$1,500.00$5,000.00$5,000.00$5,500.00
44Portable changeable message sign (503-7002)EACH2$12,000$5,000.00$15,000$7,280.00$5,000.00$8,800.00
45TMA (stationary) (505-7001)DAY40$225.00$250.00$375.00$235.00$750.00$275.00
46Rock filter dams (install) (type 2) (506-7002)LF60$60.00$59.45$60.00$61.25$75.00$66.00
47Rock filter dams (remove) (506-7011)LF60$12.81$41.00$25.00$30.60$30.00$66.00
48Temporary sediment control fence (install) (506-7039)LF525$6.00$5.54$5.00$5.10$10.00$5.00
49Temporary sediment control fence (remove) (506-7041)LF525$1.02$1.03$2.00$1.00$5.00$1.00
50Driveways (base) (530-7015)SY55$75.00$25.00$35.00$163.00$50.00$385.00
51Turnouts (ACP) (530-7018)SY704$65.00$115.00$95.00$80.80$50.00$99.00
52Metal W-beam guard fence (steel post) (540-7002)LF325$26.91$29.22$36.00$29.60$35.00$40.00
53Remove metal beam guard fence (542-7001)LF625$2.30$2.57$3.00$2.05$15.00$5.00
54Remove terminal anchor section (542-7002)EACH5$140.00$205.00$245.00$204.00$600.00$168.00
55Guardrail end treatment (install) (544-7001)EACH4$3,000.00$3,254.38$3,800.00$3,162.00$2,500.00$3,730.00
56Guardrail end treatment (remove) (544-7003)EACH1$200.00$205.00$245.00$204.00$1,000.00$550.00
57Mailbox install-M (TWG-post) type 1 (560-7001)EACH2$604.00$716.48$950.00$790.50$1,000.00$1,100.00
58Mailbox install-S (TWG-post) type 2 (560-7002)EACH52$313.00$371.05$425.00$351.90$375.00$550.00
59Mailbox install-D (TWG-post) type 2 (560-7003)EACH8$361.00$418.20$525.00$433.50$650.00$660.00
60Relocate SM RD SN sup&AM type 10BWG (644-7065)EACH1$800.00$169.13$850.00$713.00$750.00$1,100.00
61Install delineator assembly (D-SW)SZ 1(WFLX)GND (658-7003)EACH68$30.00$46.13$55.00$44.00$100.00$110.00
62CNC crack repair (discrete)(inject) (780-7002)LF12$70.00$20.00$300.00$175.00$200.00$220.00
63CNC crack repair (flood)(gravity) (780-7005)SF14$50.00$20.00$110.00$125.00$100.00$220.00
TxDOT contract A00206681: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of June 2, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy