CDM Holdings: TxDOT bid record
CDM Holdings submitted 67 bids on Texas DOT contracts in the data, from 08 APR 2020 to 04 NOV 2026, and was the low bidder on 10 of them (15%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $78,817,480
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 5 | 1 | 20% |
| 2021 | 14 | 1 | 7% |
| 2022 | 8 | 1 | 13% |
| 2023 | 5 | 1 | 20% |
| 2024 | 6 | 2 | 33% |
| 2025 | 15 | 3 | 20% |
| 2026 | 14 | 1 | 7% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Paris District | 30 | 8 | 27% |
| Atlanta District | 12 | 0 | 0% |
| Fort Worth District | 5 | 0 | 0% |
| Tyler District | 4 | 0 | 0% |
| Lufkin District | 3 | 0 | 0% |
| Childress District | 3 | 1 | 33% |
| Wichita Falls District | 2 | 1 | 50% |
| Lubbock District | 2 | 0 | 0% |
| Waco District | 2 | 0 | 0% |
| Houston District | 2 | 0 | 0% |
| Brownwood District | 1 | 0 | 0% |
| Amarillo District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Work zone pavement marking SHT terminal (tab)type Y-2 | 662-7114 | EACH | 25 | 16 (64%) | $1.00 | $1.41 |
| Work zone pavement marking SHT terminal (tab)type W | 662-7112 | EACH | 21 | 14 (67%) | $1.00 | $1.45 |
| TMA (stationary) | 505-7001 | DAY | 46 | 13 (28%) | $238.12 | $230.00 |
| Preparing row | 100-7002 | STA | 31 | 11 (35%) | $1,100.00 | $2,750.00 |
| Reflectorized pavement marker type I-C | 672-7002 | EACH | 24 | 10 (42%) | $4.14 | $5.00 |
| TMA (mobile operation) | 505-7003 | DAY | 19 | 10 (53%) | $200.00 | $291.17 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 37 | 9 (24%) | $1.10 | $1.00 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 38 | 7 (18%) | $4.32 | $5.00 |
| Portable changeable message sign | 503-7002 | EACH | 27 | 6 (22%) | $12,000 | $10,000 |
| Metal W-beam guard fence (steel post) | 540-7002 | LF | 26 | 6 (23%) | $28.25 | $33.00 |
| Vegetative watering | 168-7001 | MG | 21 | 6 (29%) | $25.00 | $29.97 |
| Guardrail end treatment (install) | 544-7001 | EACH | 35 | 5 (14%) | $3,130.38 | $3,245.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Highway 19 Construction LLC | 20 | 14 of 20 |
| East Texas Bridge, Inc. | 19 | 10 of 19 |
| Hodges and Son Construction Company, Inc. | 18 | 8 of 18 |
| Longview Bridge and Road, LTD. | 11 | 7 of 11 |
| FNH Construction, LLC | 9 | 0 of 9 |
| Ronald R. Wagner & Co., LP | 9 | 6 of 9 |
| THK Construction LLC | 9 | 8 of 9 |
| Stateline Construction, LLC | 8 | 4 of 8 |
| Clark Construction of Texas, Inc. | 8 | 2 of 8 |
| CK Newberry, LLC | 8 | 1 of 8 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00196925 | Paris District | Widen Road - Add Shoulders, FM 35 (Creek Dr. to SH 276) | 8 of 9 | $8,325,506 | +22% |
| 04 NOV 2026 | A00193963 | Paris District | Preventive Maintenance, SH 66 (Collin County Line to FM 6) | 1 of 2 | $14,216,814 | Low, 7.0% under the second |
| 03 NOV 2026 | A00197883 | Lufkin District | Resurface Roadway, SH 7 (Flat Fork Creek to US 84) | 2 of 5 | $11,390,823 | +6.0% |
| 06 OCT 2026 | A00195646 | Atlanta District | Seal Coat, US 67 (US 259 to Titus C/L) | 3 of 6 | $12,656,206 | +6.0% |
| 06 OCT 2026 | A00207643 | Paris District | Rehabilitate Existing Roadway, US 69 (Spruce Street (Whitewright) to Lovers Lane (Bells)) | 5 of 7 | $11,217,323 | +14% |
| 02 SEP 2026 | A00220228 | Fort Worth District | Reconstruct Existing Roadway, US 287 (FM 157 to Heritage Pkwy) | 7 of 7 | $5,400,453 | +106% |
| 02 JUN 2026 | A00206681 | Paris District | Hazard Elimination & Safety, FM 1497 (SL 286 to FM 1184) | 3 of 5 | $1,140,139 | +76% |
| 07 MAY 2026 | A00130461 | Atlanta District | Transportation Non-Roadway, IH 30 (1.6 Mi W of US 67, WB to 1.0 Mi W of US 67, WB) | 4 of 6 | $11,081,707 | +17% |
| 06 MAY 2026 | A00206714 | Atlanta District | Bicycle And Pedestrian Improvements, FM 3527 (SH 93 at Lake Ridge Apartments to Grady T. Wallace Park) | 3 of 11 | $1,093,185 | +16% |
| 07 APR 2026 | A00192909 | Atlanta District | Hazard Elimination & Safety, SH 11 (US 59 to FM 130) | 6 of 10 | $2,568,347 | +43% |
| 05 FEB 2026 | A00059276 | Fort Worth District | Resurface Roadway, US 380 (W. of Lake Bridgeport Bridge to SH 101/SH 114) | 2 of 6 | $6,881,717 | +2.0% |
| 04 FEB 2026 | A00198028 | Paris District | Construct Pedestrian Infrastructure, BU 271B (E Price St to MLK Dr) | 13 of 13 | $1,113,655 | +53% |
| 06 JAN 2026 | A00206402 | Tyler District | Hazard Elimination & Safety, SH 37 (CR 2460 to CR 2302 (0.23 mi N SL 564)) | 7 of 8 | $5,004,561 | +23% |
| 06 JAN 2026 | A00206664 | Paris District | Hazard Elimination & Safety, FM 900 (2.75 Mi S of FM 69 to US 67) | 7 of 8 | $3,549,874 | +24% |
| 02 DEC 2025 | A00058984 | Atlanta District | Surfacing/Roadway Restoration, US 82 (SH 8 to FM 1398W) | 5 of 5 | $12,650,763 | +22% |
| 02 DEC 2025 | A00195013 | Fort Worth District | Preventive Maintenance, SH 108 (Palo Pinto Co. Line to N of FM 219) | 3 of 4 | $12,817,313 | +45% |
| 02 DEC 2025 | A00197754 | Tyler District | Seal Coat, SH 31 (End of Grassy Median E. of Malakoff to Navarro CL) | 3 of 4 | $21,889,996 | +11% |
| 05 NOV 2025 | A00193711 | Paris District | Preventive Maintenance, SH 24 (FM 499 to IH 30) | 2 of 5 | $15,337,166 | +18% |
| 09 OCT 2025 | A00188666 | Atlanta District | Seal Coat, SH 8 (Arkansas S/L to 2.9 Mi S of Arkansas S/L) | 3 of 3 | $14,411,227 | +17% |
| 04 JUN 2025 | A00187423 | Paris District | Rehabilitate Existing Roadway, SH 78 (150' South of FM 273 to Oklahoma State Line) | 3 of 8 | $17,198,520 | +11% |
| 03 APR 2025 | A00187424 | Paris District | Rehabilitate Existing Roadway, FM 21 (SH 37 to Titus County Line) | 7 of 9 | $11,389,762 | +25% |
| 05 MAR 2025 | A00138848 | Paris District | Rehabilitate Existing Roadway, SH 34 (SH 276 to Kaufman County Line) | 1 of 5 | $9,373,273 | Low, 16% under the second |
| 07 FEB 2025 | A00064408 | Tyler District | Roadway Rehabilitation/Reconstruction With No Added Capacity, US 79 (RUSK C/L, SW to .16 MI E OF SH110 IN NW SUMMERFIELD) | 7 of 7 | $7,291,646 | +71% |
| 07 FEB 2025 | A00197744 | Paris District | Construct Pedestrian Infrastructure, BU 82J (SH 37 to N High St) | 3 of 11 | $1,544,115 | +4.0% |
| 07 FEB 2025 | A00183926 | Waco District | Rehabilitate Existing Roadway, FM 46 (SH 6 to Robertson CL) | 4 of 6 | $4,206,742 | +7.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.