TxDOT contract A00192909 bid tabulation
Hazard Elimination & Safety, SH 11 (US 59 to FM 130). Let by Texas DOT on April 7, 2026, Cass, Atlanta District. 10 bids received; low bid $1,793,826 by Skyline Bridge LLC, -29% against the engineer's estimate of $2,530,848.
- Owner
- Texas DOT
- Letting
- 07 APR 2026
- Pay items
- 66
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Skyline Bridge LLC | $1,793,826 | Low | -29% |
| 2 | THK Construction LLC | $1,946,199 | +8.0% | -23% |
| 3 | H. V. Caver, Inc. | $1,979,078 | +10% | -22% |
| 4 | Garret Shields Infrastructure | $2,142,639 | +19% | -15% |
| 5 | Icos Management, LLC | $2,341,940 | +31% | -7.0% |
| 6 | CDM Holdings | $2,568,347 | +43% | +1.0% |
| 7 | Drake Companies LLC | $2,577,844 | +44% | +2.0% |
| 8 | Longview Bridge and Road, LTD. | $2,933,014 | +64% | +16% |
| 9 | 3LW Civil LLC | $3,012,612 | +68% | +19% |
| 10 | A R Brothers Construction Services, Inc. | $3,304,123 | +84% | +31% |
Engineer's estimate: $2,530,848.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Skyline Bridge LLC | 2. THK Construction LLC | 3. H. V. Caver, Inc. | 4. Garret Shields Infrastructure | 5. Icos Management, LLC | 6. CDM Holdings |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 381.41 | $1,300.00 | $650.00 | $800.00 | $1,155.66 | $800.00 | $536.00 | $1,055.00 |
| 2 | Removing concrete (mowstrip) (104-7003) | SY | 2,368 | $10.00 | $10.00 | $20.00 | $20.00 | $13.00 | $20.30 | |
| 3 | Removing concrete (riprap) (104-7006) | SY | 165 | $15.00 | $25.00 | $10.00 | $25.00 | $30.00 | $36.00 | $43.80 |
| 4 | Removing concrete (driveways) (104-7011) | SY | 475 | $15.00 | $16.00 | $25.00 | $23.00 | $20.00 | $54.00 | $25.30 |
| 5 | Embankment (vehicle)(OC)(type C) (132-7017) | CY | 1,106 | $100.00 | $28.00 | $20.00 | $35.00 | $30.00 | $54.00 | $63.65 |
| 6 | Blading (150-7001) | STA | 51 | $275.00 | $230.00 | $100.00 | $125.00 | $100.00 | $428.00 | $157.00 |
| 7 | Broadcast seed (temporary_warm) (164-7005) | SY | 11,619 | $0.10 | $0.12 | $0.12 | $0.12 | $0.10 | $0.25 | $0.12 |
| 8 | Broadcast seed (temporary_cool) (164-7006) | SY | 11,619 | $0.10 | $0.12 | $0.12 | $0.12 | $0.10 | $0.25 | $0.12 |
| 9 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7076) | SY | 47,234 | $0.65 | $0.51 | $0.51 | $0.49 | $0.50 | $0.25 | $0.50 |
| 10 | Vegetative watering (168-7001) | TGL | 1,130.60 | $11.00 | $1.00 | $1.00 | $0.01 | $10.00 | $2.00 | $10.00 |
| 11 | Cut & restore asphalt paving (400-7008) | SY | 277 | $200.00 | $100.00 | $150.00 | $185.00 | $200.00 | $214.00 | $196.00 |
| 12 | Flowable backfill (401-7001) | CY | 5 | $275.00 | $250.00 | $1,000.00 | $400.00 | $400.00 | $642.00 | $310.00 |
| 13 | Class A concrete (collar) (420-7008) | EACH | 17 | $1,365.00 | $1,250.00 | $500.00 | $775.00 | $1,000.00 | $3,638.00 | $1,515.00 |
| 14 | Riprap (concrete)(4 in) (432-7001) | CY | 60 | $525.00 | $500.00 | $750.00 | $450.00 | $600.00 | $728.00 | $565.00 |
| 15 | Riprap (mow strip)(4 in) (432-7013) | CY | 295 | $650.00 | $475.00 | $750.00 | $517.00 | $600.00 | $642.00 | $585.00 |
| 16 | Riprap (stone protection)(18 in) (432-7043) | CY | 54 | $175.00 | $200.00 | $200.00 | $150.00 | $235.00 | $220.00 | |
| 17 | Bedding material (6 in) (432-7050) | CY | 14 | $150.00 | $200.00 | $200.00 | $200.00 | $321.00 | $435.00 | |
| 18 | Retrofit rail (type T631) (451-7020) | LF | 148 | $150.00 | $205.00 | $87.00 | $100.00 | $100.00 | $128.00 | $107.50 |
| 19 | RC pipe (CL III)(12 in) (464-7001) | LF | 6 | $50.00 | $60.00 | $80.00 | $45.19 | $70.00 | $107.00 | $96.00 |
| 20 | RC pipe (CL III)(18 in) (464-7003) | LF | 2,652 | $58.00 | $53.75 | $55.00 | $47.17 | $60.00 | $75.00 | $71.00 |
| 21 | RC pipe (CL III)(24 in) (464-7005) | LF | 1,051 | $135.00 | $70.25 | $66.00 | $81.68 | $100.00 | $91.00 | $88.00 |
| 22 | Inlet (complete)(cip)(FG)(5FTX5FT) (465-7409) | EACH | 1 | $9,000.00 | $9,000.00 | $7,500.00 | $900.00 | $4,000.00 | $9,630.00 | $11,225 |
| 23 | Inlet (complete)(cip)(FG)(4FTX5FT) (465-7410) | EACH | 3 | $8,000.00 | $9,000.00 | $7,500.00 | $850.00 | $4,000.00 | $8,560.00 | $10,765 |
| 24 | Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306) | EACH | 1 | $575.00 | $800.00 | $628.00 | $1,200.00 | $2,140.00 | $835.00 | |
| 25 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 190 | $1,100.00 | $700.00 | $750.00 | $711.00 | $1,000.00 | $1,284.00 | $830.00 |
| 26 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 45 | $1,700.00 | $1,165.00 | $1,050.00 | $1,160.00 | $2,000.00 | $1,819.00 | $1,200.00 |
| 27 | Clean existing culverts (480-7001) | EACH | 37 | $500.00 | $765.00 | $500.00 | $1,150.00 | $1,000.00 | $2,140.00 | $600.00 |
| 28 | Removing structure (set) (496-7004) | EACH | 4 | $250.00 | $250.00 | $250.00 | $500.00 | $500.00 | $2,140.00 | $250.00 |
| 29 | Removing structure (headwall) (496-7006) | EACH | 30 | $467.00 | $600.00 | $250.00 | $200.00 | $500.00 | $2,140.00 | $400.00 |
| 30 | Removing structure (pipe) (496-7007) | LF | 2,648 | $14.50 | $8.00 | $5.00 | $20.00 | $10.00 | $11.00 | $24.20 |
| 31 | Mobilization (500-7001) | LS | 1 | $235,000 | $150,000 | $200,000 | $160,000 | $200,000 | $65,600 | $250,000 |
| 32 | Barricades, signs and traffic handling (502-7001) | MO | 11 | $6,000.00 | $3,000.00 | $1,472.55 | $4,000.00 | $5,000.00 | $1.00 | $20,825 |
| 33 | Portable changeable message sign (503-7002) | EACH | 4 | $15,000 | $6,000.00 | $15,000 | $4,000.00 | $1,000.00 | $4,280.00 | $16,700 |
| 34 | TMA (stationary) (505-7001) | DAY | 135 | $300.00 | $300.00 | $225.00 | $200.00 | $300.00 | $268.00 | $256.00 |
| 35 | Temporary sediment control fence (install) (506-7039) | LF | 1,705 | $4.60 | $3.90 | $4.20 | $3.75 | $5.00 | $2.00 | $4.10 |
| 36 | Temporary sediment control fence (remove) (506-7041) | LF | 1,705 | $1.20 | $1.50 | $0.47 | $0.80 | $1.00 | $1.00 | $0.50 |
| 37 | One-way traffic control (port traffic signal) (510-7003) | MO | 2 | $5,500.00 | $6,250.00 | $10,000 | $5,500.00 | $7,000.00 | $10,700 | $5,304.00 |
| 38 | Driveways (concrete) (type 1) (530-7008) | SY | 543 | $106.00 | $86.00 | $100.00 | $98.00 | $100.00 | $278.00 | $200.00 |
| 39 | Metal W-beam guard fence (timber post) (540-7001) | LF | 3,212.50 | $20.00 | $27.56 | $23.89 | $20.00 | $30.00 | $26.00 | $20.40 |
| 40 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,330.00 | $1,680.00 | $1,500.00 | $1,500.00 | $1,926.00 | $1,840.50 | |
| 41 | Metal W - beam guard fence (low fill culvert) (540-7018) | LF | 75 | $135.00 | $106.32 | $92.00 | $100.00 | $128.00 | $93.90 | |
| 42 | Metal beam guard fence (long span system) (540-7027) | EACH | 2 | $2,650.00 | $1,228.50 | $1,050.00 | $1,000.00 | $2,140.00 | $1,071.00 | |
| 43 | Remove metal beam guard fence (542-7001) | LF | 3,447 | $4.00 | $2.50 | $2.10 | $2.00 | $5.00 | $5.00 | $2.05 |
| 44 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 4 | $350.00 | $157.50 | $150.00 | $500.00 | $428.00 | $153.00 | |
| 45 | Guardrail end treatment (install) (544-7001) | EACH | 24 | $2,976.00 | $3,180.00 | $3,218.25 | $3,015.00 | $3,500.00 | $4,066.00 | $3,075.30 |
| 46 | Guardrail end treatment (remove) (544-7003) | EACH | 24 | $212.00 | $250.00 | $210.00 | $150.00 | $500.00 | $428.00 | $153.00 |
| 47 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 9 | $1,560.00 | $1,075.00 | $799.05 | $876.03 | $800.00 | $1,017.00 | $836.40 |
| 48 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 6 | $967.00 | $1,075.00 | $889.35 | $992.17 | $800.00 | $1,070.00 | $867.00 |
| 49 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 6 | $1,030.00 | $1,075.00 | $1,031.10 | $995.91 | $800.00 | $1,070.00 | $867.00 |
| 50 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 9 | $1,060.00 | $715.00 | $1,099.35 | $995.92 | $800.00 | $1,284.00 | $918.00 |
| 51 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | $1,074.00 | $1,275.00 | $1,468.95 | $1,216.72 | $800.00 | $1,498.00 | $1,122.00 |
| 52 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 70 | $506.00 | $560.00 | $516.60 | $509.22 | $500.00 | $749.00 | $612.00 |
| 53 | Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058) | EACH | 9 | $585.00 | $601.65 | $556.49 | $500.00 | $642.00 | $612.00 | |
| 54 | Remove SM RD SN sup&AM (644-7073) | EACH | 112 | $111.50 | $75.00 | $106.05 | $100.00 | $100.00 | $214.00 | $102.00 |
| 55 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 8 | $47.75 | $47.25 | $41.00 | $30.00 | $54.00 | $42.00 | |
| 56 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 54 | $27.00 | $47.75 | $47.25 | $34.00 | $30.00 | $54.00 | $35.00 |
| 57 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 40 | $95.00 | $168.00 | $82.50 | $60.00 | $107.00 | $76.50 | |
| 58 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 48 | $3.21 | $10.60 | $10.50 | $10.00 | $15.00 | $13.00 | $14.00 |
| 59 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 350 | $4.70 | $5.30 | $5.25 | $5.00 | $10.00 | $7.00 | $9.00 |
| 60 | Work zone pavement marking removing (traffic BTN) type W (662-7058) | LF | 1,600 | $12.00 | $5.30 | $5.25 | $5.00 | $9.00 | $7.00 | $9.00 |
| 61 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 10,000 | $0.75 | $1.06 | $1.05 | $1.00 | $1.25 | $2.15 | $1.02 |
| 62 | All-wther PM type I (Y)6"(broken)(100MIL) (666-7316) | LF | 6,667 | $0.75 | $1.06 | $1.05 | $1.00 | $1.25 | $2.15 | $1.02 |
| 63 | PRFB rumble strip (BLK)(1')(centerline) (668-7002) | LF | 2,000 | $2.25 | $8.50 | $8.40 | $8.00 | $5.00 | $10.00 | $4.35 |
| 64 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 175 | $4.75 | $6.35 | $6.30 | $6.00 | $8.00 | $8.00 | $6.65 |
| 65 | Eliminating existing PM & markers (6") (677-7002) | LF | 10,000 | $0.50 | $0.70 | $0.69 | $0.65 | $0.80 | $1.00 | $0.66 |
| 66 | Eliminating existing PM & markers (rumble strip) (677-7030) | LF | 2,000 | $0.22 | $2.65 | $2.63 | $2.50 | $0.50 | $3.00 | $2.55 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.