Drake Companies LLC: TxDOT bid record
Drake Companies LLC submitted 20 bids on Texas DOT contracts in the data, from 06 JAN 2026 to 03 NOV 2026, and was the low bidder on 4 of them (20%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $103,047,772
- Latest bid
- 03 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2026 | 20 | 4 | 20% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Atlanta District | 7 | 0 | 0% |
| Tyler District | 7 | 3 | 43% |
| Paris District | 4 | 1 | 25% |
| Lufkin District | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| TMA (stationary) | 505-7001 | DAY | 20 | 7 (35%) | $192.50 | $230.00 |
| Set (type II) (18 in) (RCP) (6: 1) (P) | 467-7308 | EACH | 14 | 4 (29%) | $1,025.00 | $1,300.00 |
| Driveways (ACP) | 530-7010 | SY | 11 | 4 (36%) | $48.00 | $60.00 |
| Set (type II) (24 in) (RCP) (6: 1) (P) | 467-7328 | EACH | 11 | 3 (27%) | $1,405.00 | $1,900.00 |
| Driveways (concrete) | 530-7006 | SY | 5 | 3 (60%) | $100.00 | $110.00 |
| Riprap (mow strip)(4 in) | 432-7013 | CY | 14 | 2 (14%) | $607.50 | $643.00 |
| TMA (mobile operation) | 505-7003 | DAY | 13 | 2 (15%) | $275.00 | $291.17 |
| Excavation (roadway) | 110-7001 | CY | 13 | 2 (15%) | $12.85 | $20.00 |
| Removing concrete (driveways) | 104-7011 | SY | 10 | 2 (20%) | $14.68 | $21.00 |
| Construction exits (install) (type 1) | 506-7020 | SY | 9 | 2 (22%) | $38.50 | $30.00 |
| RC pipe (CL III)(36 in) | 464-7009 | LF | 9 | 2 (22%) | $145.00 | $180.00 |
| Prefabricated PM type C (W)(word) | 668-7103 | EACH | 9 | 2 (22%) | $270.00 | $300.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Longview Bridge and Road, LTD. | 17 | 10 of 17 |
| East Texas Bridge, Inc. | 14 | 7 of 14 |
| Highway 19 Construction LLC | 9 | 3 of 9 |
| THK Construction LLC | 6 | 4 of 6 |
| A. L. Helmcamp, Inc. | 5 | 2 of 5 |
| RK Hall, LLC | 4 | 3 of 4 |
| Baker & Company Construction, LLC | 4 | 3 of 4 |
| Hodges and Son Construction Company, Inc. | 3 | 1 of 3 |
| R Construction Civil, LLC | 3 | 1 of 3 |
| Skyline Bridge LLC | 3 | 1 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 03 NOV 2026 | A00187429 | Paris District | Preventive Maintenance, BU 82H (SL 286 to 33rd ST SE) | 1 of 5 | $3,510,998 | Low, 4.0% under the second |
| 06 OCT 2026 | A00221513 | Atlanta District | MILL AND INLAY, IH0030 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | 3 of 5 | $6,277,850 | +14% |
| 03 SEP 2026 | A00139727 | Paris District | Bridge Replacement, FM 911 (FM 911 to At Anderson Creek) | 3 of 8 | $1,642,280 | +11% |
| 06 AUG 2026 | A00049653 | Tyler District | Widen Road - Add Lanes, FM 2275 (FM 1845 (PINE TREE RD), E to SH 300 IN LONGVIEW) | 4 of 5 | $20,084,032 | +12% |
| 06 AUG 2026 | A00203348 | Atlanta District | Construct Rest Area, IH 30 (0.5 Mi W of CR 4204 to 0.5 Mi E of CR 4204) | 3 of 4 | $11,520,690 | +8.0% |
| 05 AUG 2026 | A00196231 | Atlanta District | Rehabilitate Existing Roadway, SH 11 (0.1 Mi. E. of US 259 to Cass C/L) | 7 of 7 | $13,998,024 | +30% |
| 02 JUL 2026 | A00027293 | Tyler District | Widen Road - Add Lanes, FM 756 (JEFF DAVIS DR (CR 1167), S to FM 346) | 6 of 9 | $65,286,576 | +11% |
| 02 JUL 2026 | A00064356 | Lufkin District | Highway Improvement, US 259 (Rusk County Line to SH 204) | 4 of 6 | $65,789,279 | +7.0% |
| 02 JUL 2026 | A00221809 | Paris District | MILL AND INLAY, SH0019 (Various locations in to Paris District) | 3 of 3 | $6,698,449 | +7.0% |
| 01 JUL 2026 | A00058522 | Tyler District | Widen Road - Add Lanes, US 271 (SMITH C/L, SW to FM 16) | 1 of 7 | $89,285,640 | Low, 4.0% under the second |
| 03 JUN 2026 | A00193590 | Paris District | Hazard Elimination & Safety, FM 2820 (FM 79 to FM 38) | 2 of 5 | $4,883,905 | +7.0% |
| 02 JUN 2026 | A00184211 | Atlanta District | Bridge Replacement, COUNTY ROAD 430 (At McFaddin Creek Tributary to .) | 3 of 7 | $2,640,674 | +12% |
| 07 MAY 2026 | A00130461 | Atlanta District | Transportation Non-Roadway, IH 30 (1.6 Mi W of US 67, WB to 1.0 Mi W of US 67, WB) | 6 of 6 | $12,337,809 | +30% |
| 06 MAY 2026 | A00193119 | Lufkin District | Hazard Elimination & Safety, FM 2259 (SH 7 to 2.55 MI S OF SH 7) | 9 of 9 | $6,820,662 | +34% |
| 08 APR 2026 | A00212486 | Tyler District | Construct Bridge, SL 323 (0.12 mi S of US 271 to UPRR) | 1 of 9 | $1,516,226 | Low, 1.0% under the second |
| 07 APR 2026 | A00192909 | Atlanta District | Hazard Elimination & Safety, SH 11 (US 59 to FM 130) | 7 of 10 | $2,577,844 | +44% |
| 07 APR 2026 | A00060559 | Tyler District | Roadway Rehabilitation/Reconstruction With No Added Capacity, FM 1251 (CR 394 (1.5 MI E OF FM 3135), E to PANOLA C/L (1 MI E OF FM 3231)) | 1 of 8 | $8,734,908 | Low, 3.0% under the second |
| 04 MAR 2026 | A00062293 | Atlanta District | Widen Road - Add Lanes And Shoulders, US 82 (Red River C/L to 0.1 Mi W of US 259) | 4 of 7 | $62,162,574 | +13% |
| 07 JAN 2026 | A00059128 | Tyler District | Interchange Improvement (New Or Update), IH 20 (1.55 MI WEST OF SH 31 (MM 588) to 1.14 MI EAST OF SH 31 (MM 590)) | 7 of 7 | $279,323,710 | +41% |
| 06 JAN 2026 | A00206402 | Tyler District | Hazard Elimination & Safety, SH 37 (CR 2460 to CR 2302 (0.23 mi N SL 564)) | 4 of 8 | $4,599,007 | +13% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.