TxDOT contract A00049653 bid tabulation
Widen Road - Add Lanes, FM 2275 (FM 1845 (PINE TREE RD), E to SH 300 IN LONGVIEW). Let by Texas DOT on August 6, 2026, Gregg, Tyler District. 5 bids received; low bid $17,959,231 by Longview Bridge and Road, LTD., -7.7% against the engineer's estimate of $19,466,265.
- Owner
- Texas DOT
- Letting
- 06 AUG 2026
- Pay items
- 178
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Longview Bridge and Road, LTD. | $17,959,231 | Low | -8.0% |
| 2 | East Texas Bridge, Inc. | $18,990,388 | +6.0% | -2.0% |
| 3 | Highway 19 Construction LLC | $19,144,418 | +7.0% | -2.0% |
| 4 | Drake Companies LLC | $20,084,032 | +12% | +3.0% |
| 5 | Reynolds & Kay, LTD. | $23,629,375 | +32% | +21% |
Engineer's estimate: $19,466,265.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Longview Bridge and Road, LTD. | 2. East Texas Bridge, Inc. | 3. Highway 19 Construction LLC | 4. Drake Companies LLC | 5. Reynolds & Kay, LTD. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 134 | $2,500.00 | $3,500.00 | $3,750.00 | $1,500.00 | $2,300.00 | $1,700.00 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 877 | $30.00 | $5.00 | $12.00 | $25.00 | $13.50 | $12.00 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 4,852 | $14.00 | $8.70 | $12.00 | $15.00 | $14.85 | $12.00 |
| 4 | Removing concrete (curb & gutter) (104-7017) | LF | 503 | $14.00 | $4.00 | $7.00 | $10.00 | $12.50 | $9.00 |
| 5 | Removing concrete (miscellaneous) (104-7046) | SY | 97 | $60.00 | $25.00 | $12.00 | $25.00 | $20.00 | $17.00 |
| 6 | Remove (2"-6") TRT/untrt base & asphalt pavement (105-7002) | SY | 37,360 | $10.00 | $4.60 | $5.00 | $4.60 | $4.70 | $5.00 |
| 7 | Remove (0"-6") TRT/untrt base & asphalt pavement (105-7046) | SY | 5,424 | $12.00 | $2.60 | $6.00 | $8.00 | $5.50 | $8.00 |
| 8 | Excavation (roadway) (110-7001) | CY | 29,512 | $6.00 | $6.50 | $6.00 | $4.50 | $7.50 | $15.00 |
| 9 | Embankment (final)(DC)(type B) (132-7004) | CY | 113,103 | $8.00 | $8.00 | $8.00 | $18.00 | $10.00 | $22.00 |
| 10 | Furn & place topsoil (4") (160-7002) | SY | 61,687 | $2.00 | $1.50 | $1.35 | $1.00 | $1.70 | $3.00 |
| 11 | Block sodding (162-7002) | SY | 15,422 | $4.00 | $6.00 | $5.00 | $5.00 | $5.00 | $6.00 |
| 12 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 30,844 | $0.50 | $0.12 | $0.12 | $0.11 | $0.12 | $0.15 |
| 13 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7073) | SY | 61,687 | $0.75 | $0.56 | $0.52 | $0.48 | $0.53 | $0.60 |
| 14 | Bonded fiber MTRX seed (temporary)(warm) (164-7074) | SY | 30,844 | $0.75 | $0.55 | $0.49 | $0.45 | $0.50 | $0.55 |
| 15 | Bonded fiber MTRX seed (temporary)(cool) (164-7075) | SY | 30,844 | $0.75 | $0.55 | $0.49 | $0.45 | $0.50 | $0.55 |
| 16 | Vegetative watering (168-7001) | TGL | 679 | $15.00 | $12.00 | $8.00 | $50.00 | $10.00 | $15.00 |
| 17 | FL BS (compacted in place)(type A GR 1-2) (6") (247-7044) | SY | 1,245 | $20.00 | $28.00 | $23.00 | $18.00 | $22.00 | $30.00 |
| 18 | FL BS (compacted in place)(type A GR 1-2) (8") (247-7067) | SY | 83,630 | $20.00 | $28.00 | $24.00 | $18.68 | $22.50 | $18.00 |
| 19 | Lime (quicklime (dry)) (260-7002) | TON | 792 | $300.00 | $267.00 | $365.00 | $350.00 | $340.00 | $315.00 |
| 20 | Lime TRT (existing material)(8") (260-7007) | SY | 44,028 | $4.00 | $2.00 | $3.50 | $3.65 | $3.00 | $6.00 |
| 21 | Cement (275-7001) | TON | 792 | $275.00 | $267.00 | $245.00 | $250.00 | $250.00 | $270.00 |
| 22 | Cement TRT (existing material)(8") (275-7003) | SY | 44,028 | $4.00 | $2.00 | $2.25 | $3.65 | $3.00 | $5.00 |
| 23 | Prime coat & blotter (MC-30) (310-7010) | GAL | 25,771 | $5.00 | $6.30 | $5.50 | $5.63 | $5.25 | $6.00 |
| 24 | Asphalt (AC-20XP, AC-10-2TR, or AC-20-5TR) (316-7068) | GAL | 70,342 | $4.00 | $4.50 | $4.00 | $4.50 | $4.50 | $5.00 |
| 25 | Aggregate (type-PD or PL, GR-4) (316-7258) | CY | 1,523 | $180.00 | $212.00 | $155.00 | $180.00 | $198.00 | $200.00 |
| 26 | SP mixes SP-B PG64-22 (344-7001) | TON | 799 | $145.00 | $166.00 | $144.00 | $156.00 | $156.00 | $175.00 |
| 27 | SP mixes SP-C PG64-22 (344-7009) | TON | 17,514 | $125.00 | $156.00 | $153.00 | $143.00 | $157.00 | $165.00 |
| 28 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 8,633 | $130.00 | $157.00 | $157.00 | $142.00 | $164.00 | $170.00 |
| 29 | SP mixes SP-D sac-A PG64-22 (exempt) (344-7072) | TON | 688 | $180.00 | $163.00 | $160.00 | $148.00 | $170.00 | $195.00 |
| 30 | Tack coat (344-7077) | GAL | 24,255 | $2.50 | $4.00 | $4.00 | $6.50 | $5.25 | $3.00 |
| 31 | Flexible pavement structure repair(6") (351-7005) | SY | 600 | $65.00 | $95.00 | $60.00 | $56.00 | $85.00 | $80.00 |
| 32 | Planing asphalt concrete pavement(1") (354-7050) | SY | 362 | $5.00 | $7.30 | $10.00 | $15.00 | $14.00 | $22.00 |
| 33 | Planing asphalt concrete pavement(2") (354-7051) | SY | 501 | $6.00 | $6.70 | $10.00 | $15.00 | $13.00 | $22.00 |
| 34 | Concrete pavement (joint reinforced) (6") (360-7090) | SY | 637 | $50.00 | $115.00 | $90.00 | $110.00 | $87.00 | $100.00 |
| 35 | Cut & restore asphalt paving (400-7008) | SY | 173 | $135.00 | $161.00 | $85.00 | $350.00 | $114.00 | $250.00 |
| 36 | Cem stabil BKFL (400-7010) | CY | 190 | $220.00 | $215.00 | $200.00 | $180.00 | $205.00 | $250.00 |
| 37 | Flowable backfill (401-7001) | CY | 1 | $250.00 | $200.00 | $1,000.00 | $500.00 | $1,500.00 | $250.00 |
| 38 | Trench excavation protection (402-7001) | LF | 2,385 | $15.00 | $10.00 | $10.00 | $5.00 | $9.50 | $1.00 |
| 39 | Temporary special shoring (403-7001) | SF | 7,740 | $50.00 | $20.00 | $30.00 | $55.00 | $42.50 | $57.00 |
| 40 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 48 | $345.00 | $352.00 | $345.00 | $320.00 | $355.00 | $350.00 |
| 41 | Class C concrete (collar) (420-7061) | EACH | 8 | $1,300.00 | $1,500.00 | $1,200.00 | $2,500.00 | $1,500.00 | $1,000.00 |
| 42 | Retaining wall (concrete block) (423-7013) | SF | 1,230 | $50.00 | $61.00 | $75.00 | $35.00 | $55.00 | $80.00 |
| 43 | Retaining wall (cast-in-place) (423-7016) | SF | 676 | $100.00 | $69.00 | $92.00 | $55.00 | $117.00 | $150.00 |
| 44 | Riprap (concrete)(4 in) (432-7001) | CY | 9 | $910.00 | $805.00 | $700.00 | $750.00 | $620.00 | $1,000.00 |
| 45 | Riprap (mow strip)(4 in) (432-7013) | CY | 8 | $725.00 | $575.00 | $700.00 | $600.00 | $670.00 | $900.00 |
| 46 | Riprap (stone common)(dry)(12 in) (432-7031) | CY | 1,164 | $140.00 | $210.00 | $235.00 | $180.00 | $180.00 | $175.00 |
| 47 | Rail (type PR11) (450-7044) | LF | 607 | $126.50 | $120.00 | $150.00 | $126.50 | $130.00 | |
| 48 | Concrete box culvert (8 FT X 4 FT) (462-7021) | LF | 234 | $825.00 | $700.00 | $800.00 | $800.00 | $775.00 | $730.00 |
| 49 | RC pipe (CL III)(18 in) (464-7003) | LF | 177 | $65.00 | $59.00 | $55.00 | $46.00 | $60.00 | $60.00 |
| 50 | RC pipe (CL III)(24 in) (464-7005) | LF | 7,030 | $75.00 | $68.00 | $70.00 | $65.00 | $78.00 | $76.00 |
| 51 | RC pipe (CL III)(30 in) (464-7007) | LF | 674 | $80.00 | $92.00 | $95.00 | $88.00 | $105.00 | $112.00 |
| 52 | RC pipe (CL III)(36 in) (464-7009) | LF | 170 | $145.00 | $133.00 | $130.00 | $150.00 | $155.00 | $195.00 |
| 53 | RC pipe (CL IV)(24 in) (464-7021) | LF | 158 | $170.00 | $87.00 | $90.00 | $80.00 | $100.00 | $131.00 |
| 54 | Manh (complete)(PRM)(48IN) (465-7002) | EACH | 4 | $7,850.00 | $5,400.00 | $9,000.00 | $5,750.00 | $6,700.00 | $5,500.00 |
| 55 | Manh (complete)(PRM)(60IN) (465-7003) | EACH | 8 | $9,200.00 | $7,200.00 | $12,000 | $9,000.00 | $8,500.00 | $7,000.00 |
| 56 | Inlet (complete)(PSL)(RC)(3FTX3FT) (465-7070) | EACH | 2 | $6,700.00 | $6,720.00 | $9,000.00 | $6,500.00 | $8,500.00 | $7,300.00 |
| 57 | Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126) | EACH | 2 | $8,250.00 | $5,430.00 | $9,000.00 | $5,750.00 | $7,200.00 | $6,800.00 |
| 58 | Inlet (complete)(PSL)(FG)(3FTX5FT-3FTX5FT) (465-7130) | EACH | 9 | $8,250.00 | $7,630.00 | $10,000 | $7,850.00 | $9,500.00 | $9,000.00 |
| 59 | Inlet (complete)(cco)(3FT)(both) (465-7171) | EACH | 47 | $6,500.00 | $4,960.00 | $9,000.00 | $5,900.00 | $6,500.00 | $8,300.00 |
| 60 | Inlet (complete)(cco)(4FT)(both) (465-7175) | EACH | 5 | $8,000.00 | $7,665.00 | $11,000 | $7,800.00 | $9,200.00 | $12,000 |
| 61 | Inlet (complete)(armor curb slot) (465-7335) | EACH | 1 | $4,500.00 | $17,960 | $14,000 | $10,000 | $10,000 | $15,000 |
| 62 | Headwall (CH - FW - 15) (diameter= 24 in) (466-7020) | EACH | 2 | $10,000 | $6,450.00 | $3,000.00 | $6,000.00 | $8,600.00 | $12,000 |
| 63 | Headwall (CH - FW - 45) (diameter= 24 in) (466-7050) | EACH | 1 | $10,000 | $8,660.00 | $5,000.00 | $6,000.00 | $9,920.00 | $14,500 |
| 64 | Headwall (CH - PW - 0) (diameter= 30 in) (466-7103) | EACH | 1 | $11,000 | $9,500.00 | $6,000.00 | $9,000.00 | $10,500 | $17,000 |
| 65 | Headwall (CH - PW - 0) (diameter= 36 in) (466-7105) | EACH | 2 | $11,000 | $23,000 | $72,000 | $9,000.00 | $75,000 | $100,000 |
| 66 | Headwall (CH - PW - S) (diameter= 24 in) (466-7116) | EACH | 1 | $9,200.00 | $8,800.00 | $5,000.00 | $6,000.00 | $9,750.00 | $18,000 |
| 67 | Headwall (CH - PW - S) (diameter= 30 in) (466-7118) | EACH | 2 | $11,000 | $12,000 | $10,000 | $9,000.00 | $10,500 | $26,500 |
| 68 | Wingwall (PW - 1) (HW=6 FT) (466-7176) | EACH | 2 | $13,000 | $21,850 | $26,000 | $18,000 | $27,000 | $35,000 |
| 69 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 10 | $1,400.00 | $1,085.00 | $750.00 | $786.00 | $1,250.00 | $1,200.00 |
| 70 | Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325) | EACH | 2 | $1,400.00 | $1,465.00 | $1,000.00 | $1,100.00 | $1,500.00 | $1,500.00 |
| 71 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 9 | $1,400.00 | $1,455.00 | $1,100.00 | $1,200.00 | $1,555.00 | $1,600.00 |
| 72 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 26 | $1,400.00 | $1,580.00 | $1,200.00 | $1,310.00 | $1,700.00 | $1,700.00 |
| 73 | Adjusting inlets (479-7002) | EACH | 2 | $1,500.00 | $1,980.00 | $3,000.00 | $3,500.00 | $3,500.00 | $2,200.00 |
| 74 | Removing structure (set) (496-7004) | EACH | 30 | $400.00 | $315.00 | $400.00 | $500.00 | $350.00 | $350.00 |
| 75 | Removing structure (pipe) (496-7007) | LF | 1,948 | $20.00 | $13.30 | $15.00 | $20.00 | $14.00 | $22.00 |
| 76 | Mobilization (500-7001) | LS | 1 | $1,200,000 | $800,000 | $1,175,000 | $1,950,000 | $1,500,000 | $2,150,000 |
| 77 | Barricades, signs and traffic handling (502-7001) | MO | 33 | $7,000.00 | $3,500.00 | $3,500.00 | $1,500.00 | $5,500.00 | $6,000.00 |
| 78 | Portable changeable message sign (503-7001) | DAY | 150 | $140.00 | $132.00 | $125.00 | $100.00 | $135.00 | $100.00 |
| 79 | TMA (stationary) (505-7001) | DAY | 60 | $175.00 | $150.00 | $200.00 | $250.00 | $198.00 | $150.00 |
| 80 | TMA (mobile operation) (505-7003) | DAY | 30 | $250.00 | $200.00 | $200.00 | $500.00 | $275.00 | $300.00 |
| 81 | Rock filter dams (install) (type 1) (506-7001) | LF | 500 | $35.00 | $37.40 | $36.00 | $33.00 | $36.00 | $36.00 |
| 82 | Rock filter dams (install) (type 2) (506-7002) | LF | 572 | $35.00 | $39.60 | $40.00 | $37.00 | $41.00 | $38.00 |
| 83 | Rock filter dams (remove) (506-7011) | LF | 1,072 | $9.00 | $10.00 | $8.00 | $8.00 | $9.00 | $10.00 |
| 84 | Construction exits (install) (type 1) (506-7020) | SY | 111 | $45.00 | $54.00 | $38.00 | $35.00 | $39.00 | $55.00 |
| 85 | Construction exits (remove) (506-7024) | SY | 111 | $12.00 | $13.20 | $5.00 | $5.00 | $6.00 | $13.00 |
| 86 | Excavation (erosion & sediment control, in vehicle) (506-7027) | CY | 200 | $40.00 | $25.00 | $20.00 | $50.00 | $20.00 | $29.00 |
| 87 | Backhoe work (erosion & sediment control) (506-7030) | HR | 300 | $85.00 | $45.00 | $65.00 | $50.00 | $55.00 | $75.00 |
| 88 | Temporary sediment control fence (install) (506-7039) | LF | 23,430 | $2.50 | $4.00 | $3.80 | $3.49 | $4.00 | $4.00 |
| 89 | Temporary sediment control fence (remove) (506-7041) | LF | 23,430 | $1.50 | $0.66 | $0.45 | $0.42 | $0.50 | $0.68 |
| 90 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 1,190 | $6.00 | $3.30 | $4.75 | $4.25 | $4.70 | $3.42 |
| 91 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,190 | $1.00 | $1.10 | $1.00 | $1.00 | $1.00 | $1.00 |
| 92 | Trackhoe work (erosion & sediment control) (506-7051) | HR | 300 | $145.00 | $89.00 | $100.00 | $50.00 | $115.00 | $143.00 |
| 93 | Constructing detours (508-7001) | SY | 15,901 | $100.00 | $63.50 | $68.00 | $52.00 | $84.00 | $90.00 |
| 94 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 8,520 | $95.00 | $54.00 | $75.00 | $39.00 | $85.00 | $90.00 |
| 95 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 1,000 | $90.00 | $91.00 | $75.00 | $39.00 | $85.00 | $110.00 |
| 96 | Portable concrete traffic barrier (des source)(F-shape)(type 1) (512-7017) | LF | 1,230 | $15.00 | $19.35 | $15.00 | $25.00 | $14.00 | $24.00 |
| 97 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 6,900 | $20.00 | $4.60 | $8.00 | $10.00 | $7.00 | $12.00 |
| 98 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 1,000 | $20.00 | $7.60 | $8.00 | $10.00 | $10.00 | $15.00 |
| 99 | Portable concrete traffic barrier (stockpile)(F-shape)(type 1) (512-7041) | LF | 1,230 | $12.00 | $19.50 | $12.00 | $25.00 | $14.00 | $25.00 |
| 100 | Portable concrete traffic barrier (stockpile)(low prof)(type 1) (512-7045) | LF | 8,520 | $60.00 | $12.00 | $12.00 | $25.00 | $10.00 | $17.00 |
| 101 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 1,000 | $60.00 | $7.60 | $5.00 | $25.00 | $14.00 | $18.00 |
| 102 | Concrete curb & gutter (type II) (529-7009) | LF | 20,252 | $35.00 | $21.00 | $28.00 | $31.00 | $33.75 | $28.00 |
| 103 | Concrete curb (doweled) (529-7012) | LF | 181 | $80.00 | $22.50 | $12.00 | $35.00 | $29.00 | $53.00 |
| 104 | Driveways (concrete) (530-7006) | SY | 1,897 | $90.00 | $105.00 | $100.00 | $100.00 | $100.00 | $150.00 |
| 105 | Driveways (concrete) (hes) (530-7007) | SY | 1,616 | $150.00 | $113.00 | $110.00 | $110.00 | $110.00 | $150.00 |
| 106 | Driveways (ACP) (530-7010) | SY | 2,018 | $45.00 | $49.00 | $70.00 | $65.00 | $45.00 | $50.00 |
| 107 | Turnouts (ACP) (530-7018) | SY | 46 | $90.00 | $70.00 | $75.00 | $90.00 | $105.00 | $160.00 |
| 108 | Concrete sidewalks (4") (531-7001) | SY | 2,951 | $65.00 | $68.00 | $72.00 | $75.00 | $105.00 | |
| 109 | Concrete sidewalks (5") (531-7002) | SY | 8,698 | $69.00 | $88.00 | $70.00 | $80.00 | $120.00 | |
| 110 | Curb ramps (type 1) (531-7005) | EACH | 1 | $2,400.00 | $2,500.00 | $1,100.00 | $3,000.00 | $4,200.00 | |
| 111 | Curb ramps (type 6) (531-7009) | EACH | 1 | $2,400.00 | $4,000.00 | $1,800.00 | $3,000.00 | $4,200.00 | |
| 112 | Curb ramps (type 7) (531-7010) | EACH | 22 | $2,930.00 | $2,000.00 | $1,100.00 | $2,300.00 | $4,000.00 | |
| 113 | Curb ramps (type 22) (531-7014) | EACH | 1 | $2,400.00 | $4,000.00 | $5,000.00 | $3,000.00 | $7,000.00 | |
| 114 | Concrete directional island (536-7004) | SY | 227 | $140.00 | $100.00 | $100.00 | $180.00 | $110.00 | $155.00 |
| 115 | Mailbox install-M (TWG-post) type 1 (560-7001) | EACH | 2 | $500.00 | $795.00 | $795.00 | $650.00 | $795.00 | $800.00 |
| 116 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 48 | $370.00 | $371.00 | $370.00 | $250.00 | $370.00 | $350.00 |
| 117 | Mailbox install-D (TWG-post) type 2 (560-7003) | EACH | 6 | $325.00 | $421.00 | $415.00 | $250.00 | $425.00 | $425.00 |
| 118 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 275 | $10.00 | $9.90 | $10.00 | $9.00 | $9.90 | $10.00 |
| 119 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 370 | $20.00 | $17.40 | $17.35 | $16.00 | $17.50 | $18.00 |
| 120 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 1,265 | $25.00 | $26.65 | $23.50 | $51.50 | $23.75 | $23.00 |
| 121 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 130 | $35.00 | $34.00 | $34.00 | $31.00 | $34.00 | $34.00 |
| 122 | Electrical conductor (no.6) bare (620-7009) | LF | 1,015 | $3.50 | $3.30 | $3.30 | $3.00 | $3.30 | $3.25 |
| 123 | Tray cable (4 conductor) (12 AWG) (621-7006) | LF | 1,320 | $3.50 | $3.85 | $3.80 | $3.50 | $3.85 | $3.70 |
| 124 | Ground box type D (162922)W/apron (624-7008) | EACH | 12 | $1,650.00 | $1,540.00 | $1,550.00 | $1,400.00 | $1,540.00 | $1,550.00 |
| 125 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 35 | $700.00 | $920.00 | $900.00 | $850.00 | $915.00 | $900.00 |
| 126 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 4 | $800.00 | $1,000.00 | $980.00 | $800.00 | $995.00 | $1,000.00 |
| 127 | Install small roadside sign support and assembly type 10BWG(1)SA(T-2EXT) (644-7005) | EACH | 1 | $925.00 | $1,300.00 | $1,275.00 | $900.00 | $1,300.00 | $1,300.00 |
| 128 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 6 | $850.00 | $1,080.00 | $1,075.00 | $1,000.00 | $1,080.00 | $1,100.00 |
| 129 | Remove SM RD SN sup&AM (644-7073) | EACH | 8 | $80.00 | $111.00 | $110.00 | $100.00 | $110.00 | $110.00 |
| 130 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 3,920 | $0.50 | $0.33 | $0.32 | $0.30 | $0.35 | $0.34 |
| 131 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 69,339 | $0.30 | $0.25 | $0.24 | $0.22 | $0.25 | $0.25 |
| 132 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 1,034 | $4.00 | $4.40 | $4.30 | $4.00 | $4.40 | $4.25 |
| 133 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 3,460 | $0.75 | $0.33 | $0.32 | $0.30 | $0.35 | $0.34 |
| 134 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 43,400 | $0.30 | $0.25 | $0.24 | $0.22 | $0.25 | $0.25 |
| 135 | Work zone pavement marking removing (reflectorized) type I-C (662-7050) | LF | 70 | $1.00 | $5.50 | $5.50 | $5.00 | $5.50 | $5.50 |
| 136 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 2,060 | $4.50 | $4.65 | $4.55 | $4.20 | $4.65 | $4.50 |
| 137 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 1,400 | $2.00 | $2.20 | $2.20 | $2.00 | $2.20 | $2.20 |
| 138 | Work zone pavement marking removing (W)8"(solid) (662-7072) | LF | 100 | $5.00 | $2.75 | $2.75 | $2.50 | $2.75 | $2.75 |
| 139 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 2,874 | $2.50 | $2.20 | $2.20 | $2.00 | $2.20 | $2.20 |
| 140 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 1,920 | $1.00 | $2.65 | $1.50 | $2.00 | $1.32 | $1.15 |
| 141 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 1,920 | $1.00 | $2.65 | $1.50 | $2.00 | $1.32 | $1.15 |
| 142 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 162 | $1.00 | $2.20 | $2.20 | $2.00 | $5.00 | $2.15 |
| 143 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 72 | $2.00 | $2.20 | $2.20 | $2.00 | $5.50 | $2.28 |
| 144 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 2,212 | $1.40 | $1.30 | $1.30 | $1.20 | $2.20 | $1.37 |
| 145 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 1,844 | $5.00 | $7.15 | $7.00 | $6.50 | $7.00 | $7.00 |
| 146 | Reflectorized pavement marking type I (W)(bike arrow)(100MIL) (666-7093) | EACH | 4 | $300.00 | $195.00 | $190.00 | $175.00 | $165.00 | $200.00 |
| 147 | Reflectorized pavement marking type I(W)(bike word)(100MIL) (666-7102) | EACH | 4 | $300.00 | $195.00 | $190.00 | $175.00 | $165.00 | $200.00 |
| 148 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 5,252 | $1.00 | $1.10 | $1.10 | $1.00 | $1.10 | $1.15 |
| 149 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 30,040 | $1.00 | $0.83 | $0.82 | $0.75 | $1.10 | $0.85 |
| 150 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 4,210 | $1.00 | $1.10 | $1.10 | $1.00 | $2.20 | $1.15 |
| 151 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 28,426 | $1.00 | $0.83 | $0.82 | $0.75 | $2.20 | $0.85 |
| 152 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 27 | $225.00 | $240.00 | $235.00 | $215.00 | $235.00 | $250.00 |
| 153 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 9 | $260.00 | $270.00 | $265.00 | $245.00 | $235.00 | $275.00 |
| 154 | Reflectorized pavement marker type I-C (672-7002) | EACH | 367 | $6.00 | $5.50 | $5.50 | $5.00 | $4.40 | $5.50 |
| 155 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 887 | $7.00 | $5.50 | $5.50 | $5.00 | $4.40 | $5.50 |
| 156 | Eliminating existing PM & markers (4") (677-7001) | LF | 44,225 | $0.60 | $0.58 | $0.57 | $0.52 | $1.10 | $0.55 |
| 157 | Eliminating existing PM & markers (8") (677-7004) | LF | 1,650 | $1.25 | $0.83 | $0.82 | $0.75 | $2.20 | $0.80 |
| 158 | Eliminating existing PM & markers (24") (677-7008) | LF | 498 | $3.00 | $3.30 | $3.30 | $3.00 | $4.40 | $3.20 |
| 159 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 8 | $110.00 | $110.00 | $110.00 | $100.00 | $55.00 | $105.00 |
| 160 | Eliminating existing PM & markers (word) (677-7015) | EACH | 8 | $120.00 | $110.00 | $110.00 | $100.00 | $5.00 | $105.00 |
| 161 | Install highway traffic signal (isolated) (680-7002) | EACH | 2 | $32,000 | $14,575 | $14,500 | $13,250 | $14,600 | $16,000 |
| 162 | Removing traffic signals (680-7004) | EACH | 2 | $6,000.00 | $8,000.00 | $7,850.00 | $7,250.00 | $8,000.00 | $8,500.00 |
| 163 | Temporary traffic signals (681-7001) | EACH | 2 | $40,000 | $19,000 | $19,000 | $17,250 | $19,000 | $20,000 |
| 164 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 4 | $290.00 | $306.00 | $300.00 | $278.00 | $305.00 | $310.00 |
| 165 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 8 | $290.00 | $306.00 | $300.00 | $278.00 | $305.00 | $310.00 |
| 166 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 4 | $290.00 | $306.00 | $300.00 | $278.00 | $305.00 | $310.00 |
| 167 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 12 | $675.00 | $665.00 | $655.00 | $605.00 | $670.00 | $700.00 |
| 168 | Back plate (12")(4 sect) (682-7053) | EACH | 4 | $175.00 | $210.00 | $205.00 | $189.00 | $210.00 | $210.00 |
| 169 | Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007) | LF | 2,240 | $1.85 | $2.20 | $2.20 | $2.00 | $2.20 | $2.20 |
| 170 | Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010) | LF | 2,420 | $3.00 | $3.30 | $3.30 | $3.00 | $3.30 | $3.25 |
| 171 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 2,870 | $4.00 | $3.90 | $3.85 | $3.55 | $3.90 | $4.00 |
| 172 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 2 | $16,500 | $19,715 | $19,500 | $17,922 | $19,750 | $22,000 |
| 173 | Reloc traffic SG PL AM(S)SNGL MST arm pole (686-7282) | EACH | 5 | $9,050.00 | $4,675.00 | $4,600.00 | $4,250.00 | $4,675.00 | $5,000.00 |
| 174 | Pedestrian pole assembly (687-7001) | EACH | 12 | $2,250.00 | $5,340.00 | $5,300.00 | $4,852.00 | $5,400.00 | $5,800.00 |
| 175 | Pedestrian push button pole (687-7002) | EACH | 3 | $2,646.00 | $4,785.00 | $4,700.00 | $4,350.00 | $4,800.00 | $5,200.00 |
| 176 | Pedestrian detect push button (APS) (688-7001) | EACH | 12 | $850.00 | $1,020.00 | $1,000.00 | $925.00 | $1,020.00 | $1,000.00 |
| 177 | Pedestrian detector controller unit (688-7003) | EACH | 2 | $3,100.00 | $3,850.00 | $3,800.00 | $3,500.00 | $3,850.00 | $4,000.00 |
| 178 | VDS cabling (6017-7012) | LF | 1,445 | $3.00 | $4.00 | $4.00 | $3.65 | $4.00 | $4.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 6, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.