Reynolds & Kay, LTD.: TxDOT bid record

Reynolds & Kay, LTD. submitted 58 bids on Texas DOT contracts in the data, from 07 FEB 2020 to 06 AUG 2026, and was the low bidder on 13 of them (22%). When it was not low, its total sat a median +13% above the low bid.

Owner
Texas DOT
Low bid volume
$33,364,490
Latest bid
06 AUG 2026
Data through
19 NOV 2026
58Bids
13Low bids
22Win rate, percent
+13%Median gap to the low bid when not low, 45 bids

By year

YearBidsLow bidsWin rate
20206117%
2021400%
202212217%
202313431%
20249444%
2025800%
20266233%
Reynolds & Kay, LTD., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Tyler District521019%
Paris District3267%
Atlanta District200%
Odessa District11100%
Reynolds & Kay, LTD., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
TMA (stationary)505-7001DAY4930 (61%)$150.00$230.00
TMA (mobile operation)505-7003DAY3724 (65%)$150.00$291.17
Backhoe work (erosion & sediment control)506-7030HR3424 (71%)$55.00$100.00
Earthwork (erosion & sediment control, in vehicle)506-7029CY3122 (71%)$17.00$30.00
Portable changeable message sign503-7001DAY4521 (47%)$100.00$100.00
Barricades, signs and traffic handling502-7001MO5418 (33%)$4,675.00$5,000.00
Vegetative watering168-7001MG3117 (55%)$10.00$29.97
Temporary sediment control fence (remove)506-7041LF4016 (40%)$0.80$1.00
Preparing row100-7002STA3015 (50%)$2,000.00$2,750.00
Temporary sediment control fence (install)506-7039LF4014 (35%)$3.48$4.00
Work zone pavement marking SHT terminal (tab)type W662-7112EACH2313 (57%)$1.15$1.45
Asphalt (AC-20XP, AC-10-2TR, or AC-20-5TR)316-7068GAL3012 (40%)$4.50$4.94
Reynolds & Kay, LTD., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Reynolds & Kay, LTD., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
06 AUG 2026A00049653Tyler DistrictWiden Road - Add Lanes, FM 2275 (FM 1845 (PINE TREE RD), E to SH 300 IN LONGVIEW)5 of 5$23,629,375+32%
01 JUL 2026A00206448Tyler DistrictHazard Elimination & Safety, US 69 (0.18 miles N CR 1505 (Xover @ CCECA) to CR 1503)1 of 3$1,093,712Low, 13% under the second
07 APR 2026A00060559Tyler DistrictRoadway Rehabilitation/Reconstruction With No Added Capacity, FM 1251 (CR 394 (1.5 MI E OF FM 3135), E to PANOLA C/L (1 MI E OF FM 3231))6 of 8$9,788,549+12%
05 MAR 2026A00198645Tyler DistrictConstruct Pedestrian Infrastructure, Various (VARIOUS LOCATION to TYLER DISTRICT)11 of 14$1,320,684+27%
05 FEB 2026A00058517Tyler DistrictHighway Improvement, SH 204 (RUSK C/L AT REKLAW, SE to CHEROKEE C/L)5 of 8$11,965,671+16%
07 JAN 2026A00206403Tyler DistrictHazard Elimination & Safety, NEW COPELAND RD (at Rose Rudman Trail to and Hubbard Middle School)1 of 4$539,227Low, 6.0% under the second
06 NOV 2025A00060555Tyler DistrictSurfacing/Roadway Restoration, FM 2204 (US 259 (KILGORE BYPASS), E to FM 2011)3 of 5$3,529,557+1.0%
06 NOV 2025A00059355Tyler DistrictHighway Improvement, SH 19 (US 80, S to IH 20, IN CANTON)6 of 9$13,302,016+19%
08 AUG 2025A00196862Tyler DistrictHazard Elimination & Safety, FM 855 (US 175 to US 69)13 of 13$8,377,420+104%
07 AUG 2025A00184659Tyler DistrictHazard Elimination & Safety, US 259 (BU 259 to FM 850)2 of 4$2,696,692+8.0%
01 JUL 2025A00193092Tyler DistrictHazard Elimination & Safety, FM 1990 (0.1 mi N of Gum Cr to CR 2137)10 of 10$3,125,834+91%
01 MAY 2025A00184614Tyler DistrictHazard Elimination & Safety, YOUNG (Mobberly Ave to MLK Blvd)8 of 13$923,367+49%
07 FEB 2025A00064408Tyler DistrictRoadway Rehabilitation/Reconstruction With No Added Capacity, US 79 (RUSK C/L, SW to .16 MI E OF SH110 IN NW SUMMERFIELD)2 of 7$4,266,3450.0%
07 JAN 2025A00178624Tyler DistrictRehabilitate Existing Roadway, FM 279 (.24 MI E of FM 314 to Smith C/L)3 of 8$8,388,089+8.0%
06 NOV 2024A00193158Tyler DistrictTraffic Signal Improvements, US 271 (at SL 323 extension to CR 334)6 of 6$2,432,335+40%
06 NOV 2024A00198667Tyler DistrictConstruct Pedestrian Infrastructure, Various (At various locations to in Tyler)7 of 7$1,486,807+72%
05 JUN 202406243026Tyler DistrictBS 19-J Construct pedestrian infrastructure from BEN BELT DR to HILLSIDE DR9 of 9$4,456,090+71%
06 MAR 202403243227Tyler DistrictIH 20 Construct ramps from WB EXIT RAMP ON IH 20 to AT SH 191 of 4$1,435,639Low, 100% under the second
06 MAR 202403243231Tyler DistrictCS Hazard elimination & safety from YOUNG ST to HUGHES ST1 of 3$439,360Low, 13% under the second
06 MAR 202403243234Tyler DistrictPW State park improvements from VARIOUS LOCATIONS to WITHIN GUS ENGLING WMA1 of 3$170,874Low, 7.0% under the second
01 FEB 202402243016Tyler DistrictUS 79 Pvmnt repair, planing, ocst, pfc surf, mbgf, pv m from 1.3 MI E OF SH 45, S to CHEROKEE C/L1 of 5$4,925,093Low, 2.0% under the second
05 JAN 202401243216Tyler DistrictUS 69 Rehabilitate existing roadway from RAINS C/L to FM 7792 of 6$7,744,216+22%
04 JAN 202401243027Tyler DistrictUS 79 Pvmnt repair, planing, ocst, pfc surf, mbgf, pv m from FM 839, S to 1.3 MI E OF SH 422 of 6$3,307,283+3.0%
07 SEP 202309233206Tyler DistrictFM 1255 Rehabilitate existing roadway from IH 20 to SH 1101 of 3$17,084,796Low, 1.0% under the second
07 SEP 202309233226Tyler DistrictSH 31 Resurface roadway from 2.6 MILES WEST OF SH 1982 of 4$2,322,903+13%
Reynolds & Kay, LTD.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way