Reynolds & Kay, LTD.: TxDOT bid record
Reynolds & Kay, LTD. submitted 58 bids on Texas DOT contracts in the data, from 07 FEB 2020 to 06 AUG 2026, and was the low bidder on 13 of them (22%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $33,364,490
- Latest bid
- 06 AUG 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 6 | 1 | 17% |
| 2021 | 4 | 0 | 0% |
| 2022 | 12 | 2 | 17% |
| 2023 | 13 | 4 | 31% |
| 2024 | 9 | 4 | 44% |
| 2025 | 8 | 0 | 0% |
| 2026 | 6 | 2 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Tyler District | 52 | 10 | 19% |
| Paris District | 3 | 2 | 67% |
| Atlanta District | 2 | 0 | 0% |
| Odessa District | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| TMA (stationary) | 505-7001 | DAY | 49 | 30 (61%) | $150.00 | $230.00 |
| TMA (mobile operation) | 505-7003 | DAY | 37 | 24 (65%) | $150.00 | $291.17 |
| Backhoe work (erosion & sediment control) | 506-7030 | HR | 34 | 24 (71%) | $55.00 | $100.00 |
| Earthwork (erosion & sediment control, in vehicle) | 506-7029 | CY | 31 | 22 (71%) | $17.00 | $30.00 |
| Portable changeable message sign | 503-7001 | DAY | 45 | 21 (47%) | $100.00 | $100.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 54 | 18 (33%) | $4,675.00 | $5,000.00 |
| Vegetative watering | 168-7001 | MG | 31 | 17 (55%) | $10.00 | $29.97 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 40 | 16 (40%) | $0.80 | $1.00 |
| Preparing row | 100-7002 | STA | 30 | 15 (50%) | $2,000.00 | $2,750.00 |
| Temporary sediment control fence (install) | 506-7039 | LF | 40 | 14 (35%) | $3.48 | $4.00 |
| Work zone pavement marking SHT terminal (tab)type W | 662-7112 | EACH | 23 | 13 (57%) | $1.15 | $1.45 |
| Asphalt (AC-20XP, AC-10-2TR, or AC-20-5TR) | 316-7068 | GAL | 30 | 12 (40%) | $4.50 | $4.94 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| East Texas Bridge, Inc. | 34 | 10 of 34 |
| Longview Bridge and Road, LTD. | 23 | 11 of 23 |
| FNH Construction, LLC | 15 | 4 of 15 |
| Madden Contracting Company, LLC. | 14 | 13 of 14 |
| A. L. Helmcamp, Inc. | 13 | 7 of 13 |
| Big Creek Construction, LTD. | 10 | 5 of 10 |
| Highway 19 Construction LLC | 10 | 7 of 10 |
| Baker & Company Construction, LLC | 10 | 8 of 10 |
| Drewery Construction Company, Incorporated | 10 | 3 of 10 |
| True Roads Construction, LLC | 9 | 7 of 9 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 06 AUG 2026 | A00049653 | Tyler District | Widen Road - Add Lanes, FM 2275 (FM 1845 (PINE TREE RD), E to SH 300 IN LONGVIEW) | 5 of 5 | $23,629,375 | +32% |
| 01 JUL 2026 | A00206448 | Tyler District | Hazard Elimination & Safety, US 69 (0.18 miles N CR 1505 (Xover @ CCECA) to CR 1503) | 1 of 3 | $1,093,712 | Low, 13% under the second |
| 07 APR 2026 | A00060559 | Tyler District | Roadway Rehabilitation/Reconstruction With No Added Capacity, FM 1251 (CR 394 (1.5 MI E OF FM 3135), E to PANOLA C/L (1 MI E OF FM 3231)) | 6 of 8 | $9,788,549 | +12% |
| 05 MAR 2026 | A00198645 | Tyler District | Construct Pedestrian Infrastructure, Various (VARIOUS LOCATION to TYLER DISTRICT) | 11 of 14 | $1,320,684 | +27% |
| 05 FEB 2026 | A00058517 | Tyler District | Highway Improvement, SH 204 (RUSK C/L AT REKLAW, SE to CHEROKEE C/L) | 5 of 8 | $11,965,671 | +16% |
| 07 JAN 2026 | A00206403 | Tyler District | Hazard Elimination & Safety, NEW COPELAND RD (at Rose Rudman Trail to and Hubbard Middle School) | 1 of 4 | $539,227 | Low, 6.0% under the second |
| 06 NOV 2025 | A00060555 | Tyler District | Surfacing/Roadway Restoration, FM 2204 (US 259 (KILGORE BYPASS), E to FM 2011) | 3 of 5 | $3,529,557 | +1.0% |
| 06 NOV 2025 | A00059355 | Tyler District | Highway Improvement, SH 19 (US 80, S to IH 20, IN CANTON) | 6 of 9 | $13,302,016 | +19% |
| 08 AUG 2025 | A00196862 | Tyler District | Hazard Elimination & Safety, FM 855 (US 175 to US 69) | 13 of 13 | $8,377,420 | +104% |
| 07 AUG 2025 | A00184659 | Tyler District | Hazard Elimination & Safety, US 259 (BU 259 to FM 850) | 2 of 4 | $2,696,692 | +8.0% |
| 01 JUL 2025 | A00193092 | Tyler District | Hazard Elimination & Safety, FM 1990 (0.1 mi N of Gum Cr to CR 2137) | 10 of 10 | $3,125,834 | +91% |
| 01 MAY 2025 | A00184614 | Tyler District | Hazard Elimination & Safety, YOUNG (Mobberly Ave to MLK Blvd) | 8 of 13 | $923,367 | +49% |
| 07 FEB 2025 | A00064408 | Tyler District | Roadway Rehabilitation/Reconstruction With No Added Capacity, US 79 (RUSK C/L, SW to .16 MI E OF SH110 IN NW SUMMERFIELD) | 2 of 7 | $4,266,345 | 0.0% |
| 07 JAN 2025 | A00178624 | Tyler District | Rehabilitate Existing Roadway, FM 279 (.24 MI E of FM 314 to Smith C/L) | 3 of 8 | $8,388,089 | +8.0% |
| 06 NOV 2024 | A00193158 | Tyler District | Traffic Signal Improvements, US 271 (at SL 323 extension to CR 334) | 6 of 6 | $2,432,335 | +40% |
| 06 NOV 2024 | A00198667 | Tyler District | Construct Pedestrian Infrastructure, Various (At various locations to in Tyler) | 7 of 7 | $1,486,807 | +72% |
| 05 JUN 2024 | 06243026 | Tyler District | BS 19-J Construct pedestrian infrastructure from BEN BELT DR to HILLSIDE DR | 9 of 9 | $4,456,090 | +71% |
| 06 MAR 2024 | 03243227 | Tyler District | IH 20 Construct ramps from WB EXIT RAMP ON IH 20 to AT SH 19 | 1 of 4 | $1,435,639 | Low, 100% under the second |
| 06 MAR 2024 | 03243231 | Tyler District | CS Hazard elimination & safety from YOUNG ST to HUGHES ST | 1 of 3 | $439,360 | Low, 13% under the second |
| 06 MAR 2024 | 03243234 | Tyler District | PW State park improvements from VARIOUS LOCATIONS to WITHIN GUS ENGLING WMA | 1 of 3 | $170,874 | Low, 7.0% under the second |
| 01 FEB 2024 | 02243016 | Tyler District | US 79 Pvmnt repair, planing, ocst, pfc surf, mbgf, pv m from 1.3 MI E OF SH 45, S to CHEROKEE C/L | 1 of 5 | $4,925,093 | Low, 2.0% under the second |
| 05 JAN 2024 | 01243216 | Tyler District | US 69 Rehabilitate existing roadway from RAINS C/L to FM 779 | 2 of 6 | $7,744,216 | +22% |
| 04 JAN 2024 | 01243027 | Tyler District | US 79 Pvmnt repair, planing, ocst, pfc surf, mbgf, pv m from FM 839, S to 1.3 MI E OF SH 42 | 2 of 6 | $3,307,283 | +3.0% |
| 07 SEP 2023 | 09233206 | Tyler District | FM 1255 Rehabilitate existing roadway from IH 20 to SH 110 | 1 of 3 | $17,084,796 | Low, 1.0% under the second |
| 07 SEP 2023 | 09233226 | Tyler District | SH 31 Resurface roadway from 2.6 MILES WEST OF SH 198 | 2 of 4 | $2,322,903 | +13% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.