TxDOT contract A00178624 bid tabulation
Rehabilitate Existing Roadway, FM 279 (.24 MI E of FM 314 to Smith C/L). Let by Texas DOT on January 7, 2025, Van Zandt, Tyler District. 8 bids received; low bid $7,787,125 by Big Creek Construction, LTD., -19% against the engineer's estimate of $9,573,493.
- Owner
- Texas DOT
- Letting
- 07 JAN 2025
- Pay items
- 86
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Big Creek Construction, LTD. | $7,787,125 | Low | -19% |
| 2 | Baker & Company Construction, LLC | $8,355,736 | +7.0% | -13% |
| 3 | Reynolds & Kay, LTD. | $8,388,089 | +8.0% | -12% |
| 4 | True Roads, LLC | $8,797,813 | +13% | -8.0% |
| 5 | Texas Materials Group, Inc. | $8,902,491 | +14% | -7.0% |
| 6 | East Texas Bridge, Inc. | $9,340,897 | +20% | -2.0% |
| 7 | Longview Bridge and Road, LTD. | $9,531,944 | +22% | 0.0% |
| 8 | FNH Construction, LLC | $11,345,901 | +46% | +19% |
Engineer's estimate: $9,573,493.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Big Creek Construction, LTD. | 2. Baker & Company Construction, LLC | 3. Reynolds & Kay, LTD. | 4. True Roads, LLC | 5. Texas Materials Group, Inc. | 6. East Texas Bridge, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 440 | $1,500.00 | $1,750.00 | $1,115.00 | $2,200.00 | $1,500.00 | $1,348.60 | $3,000.00 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 251 | $25.00 | $35.00 | $50.00 | $35.00 | $48.00 | $55.00 | $40.00 |
| 3 | Embankment (vehicle)(OC)(type C) (132-7017) | CY | 4,622 | $95.00 | $35.00 | $39.00 | $30.00 | $26.00 | $49.36 | $30.00 |
| 4 | Backfill (type A) (134-7001) | STA | 535 | $278.00 | $350.00 | $360.00 | $615.00 | $520.00 | $607.55 | $250.00 |
| 5 | Blading (150-7002) | HR | 60 | $165.00 | $200.00 | $335.00 | $350.00 | $325.00 | $200.00 | $300.00 |
| 6 | Furn & place topsoil (4") (160-7002) | SY | 7,786 | $4.00 | $3.00 | $6.65 | $5.50 | $4.00 | $7.03 | $4.00 |
| 7 | Broadcast seed (temporary_warm_cool) (164-7007) | SY | 310,468 | $0.30 | $0.10 | $0.12 | $0.15 | $0.12 | $0.11 | $0.12 |
| 8 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7073) | SY | 310,468 | $1.08 | $0.35 | $0.80 | $0.68 | $0.67 | $0.62 | $0.60 |
| 9 | Bonded fiber MTRX seed (temporary)(warm) (164-7074) | SY | 155,234 | $0.65 | $0.35 | $0.53 | $0.54 | $0.65 | $0.59 | $0.60 |
| 10 | Bonded fiber MTRX seed (temporary)(cool) (164-7075) | SY | 155,234 | $0.65 | $0.35 | $0.53 | $0.56 | $0.64 | $0.58 | $0.60 |
| 11 | Vegetative watering (168-7001) | TGL | 3,415 | $10.00 | $1.00 | $20.00 | $10.00 | $9.00 | $36.55 | $10.00 |
| 12 | Asphalt (AC-20XP, AC-10-2TR, or AC-20-5TR) (316-7068) | GAL | 61,678 | $4.50 | $4.50 | $7.35 | $4.65 | $7.20 | $4.92 | $4.50 |
| 13 | Aggregate (type-PD or PL, GR-4) (316-7258) | CY | 1,371 | $180.00 | $175.00 | $231.00 | $158.00 | $222.00 | $250.53 | $220.00 |
| 14 | SP mixes SP-C PG64-22 (level-UP) (344-7012) | TON | 20,277 | $170.00 | $130.00 | $149.00 | $144.00 | $146.00 | $149.43 | $165.00 |
| 15 | SP mixes SP-D PG64-22 (344-7041) | TON | 881 | $170.00 | $205.00 | $189.00 | $370.00 | $300.00 | $282.83 | $350.00 |
| 16 | Tack coat (344-7077) | GAL | 16,898 | $2.20 | $3.50 | $6.30 | $0.70 | $4.50 | $7.12 | $6.00 |
| 17 | Flexible pavement structure repair(6") (351-7005) | SY | 12,269 | $100.00 | $70.00 | $69.30 | $73.00 | $80.00 | $77.17 | $75.00 |
| 18 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 5,591 | $18.00 | $5.00 | $4.85 | $8.00 | $6.50 | $6.50 | $5.00 |
| 19 | Planing asphalt concrete pavement(2") (354-7051) | SY | 1,733 | $5.00 | $5.00 | $7.30 | $6.00 | $8.20 | $6.50 | $5.00 |
| 20 | Cut & restoring pavement (400-7006) | SY | 16 | $265.00 | $250.00 | $427.50 | $400.00 | $385.00 | $330.00 | $500.00 |
| 21 | Cem stabil BKFL (400-7010) | CY | 14 | $93.26 | $350.00 | $462.50 | $350.00 | $385.00 | $275.00 | $400.00 |
| 22 | Flowable backfill (401-7001) | CY | 15 | $400.00 | $350.00 | $452.50 | $300.00 | $375.00 | $385.00 | $500.00 |
| 23 | Class C concrete (rail foundation) (420-7052) | CY | 1.40 | $800.00 | $6,500.00 | $1,320.00 | $6,000.00 | $5,000.00 | $8,250.00 | $4,000.00 |
| 24 | Riprap (concrete)(5 in) (432-7002) | CY | 0.80 | $2,000.00 | $11,000 | $1,500.00 | $3,000.00 | $2,200.00 | $8,000.00 | |
| 25 | Riprap (mow strip)(4 in) (432-7013) | CY | 111 | $775.00 | $775.00 | $632.50 | $1,000.00 | $825.00 | $1,320.00 | $750.00 |
| 26 | Riprap (stone protection)(18 in) (432-7043) | CY | 370 | $200.00 | $200.00 | $221.00 | $197.00 | $205.00 | $385.00 | $250.00 |
| 27 | Riprap (stone protection)(24 in) (432-7045) | CY | 400 | $200.00 | $217.00 | $209.00 | $205.00 | $440.00 | $250.00 | |
| 28 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 504 | $60.00 | $46.00 | $50.00 | $50.00 | $40.30 | $75.00 | |
| 29 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 107 | $53.00 | $80.00 | $58.00 | $50.00 | $64.00 | $82.18 | $100.00 |
| 30 | Rail (type T221) (450-7004) | LF | 10 | $250.00 | $750.00 | $1,045.00 | $1,100.00 | $950.00 | $1,375.00 | $400.00 |
| 31 | Concrete box culvert (2FT X 2FT) (extend) (462-7119) | LF | 6 | $950.00 | $963.00 | $3,000.00 | $1,800.00 | $1,100.00 | $1,500.00 | |
| 32 | RC pipe (CL III)(24 in) (464-7005) | LF | 42 | $115.00 | $125.00 | $128.00 | $125.00 | $130.00 | $203.50 | $150.00 |
| 33 | Wingwall (FW - 0) (HW=3 FT) (466-7145) | EACH | 1 | $9,000.00 | $13,750 | $23,000 | $13,000 | $7,150.00 | $8,000.00 | |
| 34 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 2 | $1,850.00 | $2,500.00 | $3,620.00 | $2,500.00 | $2,000.00 | $2,750.00 | $1,200.00 |
| 35 | Set (type I)(S= 2 FT)(HW= 3 FT)(4:1)(C) (467-7473) | EACH | 1 | $8,500.00 | $15,235 | $18,000 | $8,000.00 | $8,250.00 | $8,000.00 | |
| 36 | Removing structure (pipe) (496-7007) | LF | 42 | $28.00 | $25.00 | $44.00 | $75.00 | $36.00 | $71.50 | $40.00 |
| 37 | Mobilization (500-7001) | LS | 1 | $870,318 | $770,000 | $400,000 | $468,000 | $750,000 | $628,863 | $500,000 |
| 38 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $10,000 | $19,000 | $44,290 | $10,000 | $16,000 | $6,205.09 | $20,000 |
| 39 | Portable changeable message sign (503-7001) | DAY | 21 | $250.00 | $250.00 | $250.00 | $105.00 | $90.00 | $556.55 | $300.00 |
| 40 | TMA (stationary) (505-7001) | DAY | 100 | $270.00 | $300.00 | $305.00 | $200.00 | $360.00 | $300.00 | $300.00 |
| 41 | TMA (mobile operation) (505-7003) | DAY | 10 | $220.00 | $500.00 | $1,507.00 | $200.00 | $360.00 | $178.51 | $300.00 |
| 42 | Rock filter dams (install) (type 1) (506-7001) | LF | 300 | $37.00 | $35.00 | $34.00 | $38.00 | $40.00 | $39.60 | $45.00 |
| 43 | Rock filter dams (install) (type 2) (506-7002) | LF | 300 | $50.00 | $45.00 | $36.00 | $40.00 | $44.00 | $44.00 | $50.00 |
| 44 | Rock filter dams (remove) (506-7011) | LF | 300 | $13.00 | $10.00 | $10.00 | $11.00 | $10.00 | $9.90 | $9.00 |
| 45 | Earthwork (erosion & sediment control, in vehicle) (506-7029) | CY | 120 | $38.50 | $65.00 | $30.00 | $24.00 | $25.00 | $69.99 | $50.00 |
| 46 | Backhoe work (erosion & sediment control) (506-7030) | HR | 60 | $55.00 | $200.00 | $178.00 | $55.00 | $280.00 | $175.00 | $125.00 |
| 47 | Temporary sediment control fence (install) (506-7039) | LF | 2,920 | $4.50 | $5.00 | $4.20 | $4.00 | $4.40 | $4.40 | $5.00 |
| 48 | Temporary sediment control fence (remove) (506-7041) | LF | 2,920 | $1.00 | $1.00 | $1.60 | $0.80 | $1.10 | $1.10 | $1.00 |
| 49 | Trackhoe work (erosion & sediment control) (506-7051) | HR | 60 | $90.00 | $200.00 | $187.00 | $103.00 | $310.00 | $175.00 | $200.00 |
| 50 | Driveways (concrete) (hes) (530-7007) | SY | 251 | $150.00 | $150.00 | $262.50 | $160.00 | $155.00 | $291.50 | $180.00 |
| 51 | Turnouts (ACP) (530-7018) | SY | 833 | $70.00 | $75.00 | $68.00 | $95.00 | $105.00 | $63.98 | $90.00 |
| 52 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 103,356 | $0.30 | $0.20 | $0.13 | $0.16 | $0.22 | $0.42 | $0.40 |
| 53 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 50,053 | $0.46 | $0.25 | $0.19 | $0.16 | $0.23 | $0.24 | $0.60 |
| 54 | Metal W-beam guard fence (steel post) (540-7002) | LF | 350 | $36.50 | $50.00 | $30.00 | $30.00 | $30.00 | $28.60 | $30.00 |
| 55 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 2 | $2,415.00 | $2,500.00 | $2,310.00 | $2,200.00 | $2,110.00 | $2,200.00 | $2,200.00 |
| 56 | Metal W - beam guard fence (low fill culvert) (540-7018) | LF | 100 | $90.00 | $100.00 | $79.00 | $105.00 | $100.00 | $92.40 | $110.00 |
| 57 | Guardrail end treatment (install) (544-7001) | EACH | 6 | $3,300.00 | $3,500.00 | $3,025.00 | $3,300.00 | $3,150.00 | $3,245.00 | $3,200.00 |
| 58 | Mailbox install-M (TWG-post) type 1 (560-7001) | EACH | 4 | $550.00 | $575.00 | $692.00 | $750.00 | $530.00 | $605.00 | $600.00 |
| 59 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 91 | $320.00 | $300.00 | $347.00 | $380.00 | $360.00 | $330.00 | $330.00 |
| 60 | Mailbox install-D (TWG-post) type 2 (560-7003) | EACH | 9 | $360.00 | $350.00 | $389.00 | $425.00 | $425.00 | $352.00 | $380.00 |
| 61 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 143 | $800.00 | $650.00 | $645.00 | $700.00 | $780.00 | $660.00 | $600.00 |
| 62 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 11 | $900.00 | $700.00 | $772.00 | $850.00 | $885.00 | $770.00 | $730.00 |
| 63 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 9 | $1,075.00 | $900.00 | $1,012.00 | $1,100.00 | $1,350.00 | $935.00 | $920.00 |
| 64 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 3 | $1,000.00 | $500.00 | $575.00 | $625.00 | $610.00 | $539.00 | $500.00 |
| 65 | Remove SM RD SN sup&AM (644-7073) | EACH | 172 | $110.00 | $100.00 | $105.00 | $110.00 | $140.00 | $110.00 | $100.00 |
| 66 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 16 | $35.00 | $35.00 | $26.25 | $30.00 | $20.00 | $48.40 | $40.00 |
| 67 | Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059) | EACH | 81 | $50.00 | $75.00 | $47.25 | $125.00 | $115.00 | $77.00 | $75.00 |
| 68 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 108,260 | $0.40 | $0.25 | $0.38 | $0.33 | $0.33 | $0.24 | $0.33 |
| 69 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 5,413 | $1.45 | $1.50 | $4.06 | $1.20 | $2.20 | $2.48 | $2.00 |
| 70 | Work zone pavement marking SHT terminal remove (Y)(4") (662-7116) | LF | 24,359 | $2.00 | $1.50 | $3.20 | $1.40 | $1.30 | $2.97 | $3.00 |
| 71 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 68 | $10.35 | $10.00 | $8.40 | $9.00 | $8.80 | $10.84 | $9.00 |
| 72 | RE prof PM (W)6"(solid) raisd prof only (666-7279) | LF | 1,454 | $10.00 | $3.00 | $3.15 | $3.30 | $3.30 | $2.26 | $4.00 |
| 73 | RE prof PM (Y)6"(solid) raisd prof only (666-7280) | LF | 1,354 | $10.00 | $3.00 | $3.15 | $3.30 | $3.30 | $2.26 | $4.00 |
| 74 | RE prof PM (Y)6"(broken) raisd prof only (666-7281) | LF | 25 | $10.00 | $3.00 | $3.15 | $3.30 | $3.30 | $2.26 | $4.00 |
| 75 | Pavement sler 6" (666-7347) | LF | 325 | $0.50 | $1.00 | $2.10 | $2.20 | $2.20 | $0.28 | $3.00 |
| 76 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 110,820 | $0.73 | $0.65 | $0.74 | $0.75 | $0.78 | $0.66 | $0.77 |
| 77 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 2,121 | $1.00 | $0.65 | $1.05 | $1.10 | $1.10 | $0.67 | $1.10 |
| 78 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 101,326 | $0.73 | $0.65 | $0.75 | $0.75 | $0.78 | $0.66 | $0.77 |
| 79 | Reflectorized pavement marker type I-A (672-7001) | EACH | 198 | $7.40 | $5.00 | $6.30 | $6.50 | $6.60 | $4.79 | $7.00 |
| 80 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,362 | $6.30 | $5.00 | $4.60 | $4.80 | $4.80 | $4.79 | $5.00 |
| 81 | Eliminating existing PM & markers (4") (677-7001) | LF | 325 | $5.85 | $1.00 | $3.15 | $3.30 | $3.30 | $0.77 | $4.00 |
| 82 | Eliminating existing PM & markers (rumble strip) (677-7030) | LF | 10,474 | $1.00 | $0.55 | $1.00 | $1.10 | $0.90 | $2.00 | |
| 83 | Full - width mowing (730-7019) | CYC | 4 | $3,500.00 | $6,000.00 | $5,000.00 | $1,500.00 | $9,000.00 | $5,500.00 | $3,000.00 |
| 84 | Litter removal (734-7002) | CYC | 4 | $2,500.00 | $6,000.00 | $5,000.00 | $500.00 | $6,000.00 | $4,000.00 | $3,000.00 |
| 85 | Concrete rail replacement (in-kind) (778-7004) | LF | 18 | $2,500.00 | $935.00 | $900.00 | $700.00 | $1,045.00 | $2,000.00 | |
| 86 | Concrete post replacement (778-7005) | EACH | 5 | $6,500.00 | $1,650.00 | $2,000.00 | $2,000.00 | $660.00 | $3,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 7, 2025. Compiled by Mirage Metrics.