Baker & Company Construction, LLC: TxDOT bid record
Baker & Company Construction, LLC submitted 37 bids on Texas DOT contracts in the data, from 06 FEB 2020 to 02 JUL 2026, and was the low bidder on 11 of them (30%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $105,643,035
- Latest bid
- 02 JUL 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 4 | 2 | 50% |
| 2021 | 1 | 0 | 0% |
| 2022 | 5 | 1 | 20% |
| 2023 | 4 | 2 | 50% |
| 2024 | 5 | 2 | 40% |
| 2025 | 12 | 1 | 8% |
| 2026 | 6 | 3 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Tyler District | 22 | 9 | 41% |
| Atlanta District | 6 | 0 | 0% |
| Dallas District | 6 | 1 | 17% |
| Paris District | 3 | 1 | 33% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 37 | 11 (30%) | $5,300.00 | $5,000.00 |
| Temporary sediment control fence (install) | 506-7039 | LF | 36 | 10 (28%) | $3.60 | $4.00 |
| Preparing row | 100-7002 | STA | 28 | 9 (32%) | $1,512.50 | $2,750.00 |
| RC pipe (CL III)(24 in) | 464-7005 | LF | 23 | 7 (30%) | $84.00 | $108.13 |
| RC pipe (CL III)(18 in) | 464-7003 | LF | 23 | 7 (30%) | $58.00 | $82.44 |
| Excavation (roadway) | 110-7001 | CY | 18 | 7 (39%) | $13.95 | $20.00 |
| Vegetative watering | 168-7001 | TGL | 10 | 6 (60%) | $10.00 | $37.73 |
| Rock filter dams (remove) | 506-7011 | LF | 29 | 5 (17%) | $11.00 | $12.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 23 | 5 (22%) | $3,190.00 | $3,245.00 |
| Portable changeable message sign | 503-7001 | DAY | 21 | 5 (24%) | $110.00 | $100.00 |
| Furn & place topsoil (4") | 160-7002 | SY | 8 | 5 (63%) | $1.23 | $3.66 |
| Removing concrete (driveways) | 104-7011 | SY | 20 | 4 (20%) | $17.90 | $21.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| East Texas Bridge, Inc. | 24 | 6 of 24 |
| Highway 19 Construction LLC | 18 | 5 of 18 |
| Longview Bridge and Road, LTD. | 16 | 5 of 16 |
| Reynolds & Kay, LTD. | 10 | 2 of 10 |
| FNH Construction, LLC | 9 | 1 of 9 |
| A. L. Helmcamp, Inc. | 9 | 3 of 9 |
| Grey Sky Construction LLC | 9 | 0 of 9 |
| Texas Materials Group, Inc. | 9 | 1 of 9 |
| True Roads Construction, LLC | 8 | 2 of 8 |
| THK Construction LLC | 7 | 7 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 JUL 2026 | A00027293 | Tyler District | Widen Road - Add Lanes, FM 756 (JEFF DAVIS DR (CR 1167), S to FM 346) | 1 of 9 | $58,705,654 | Low, 1.0% under the second |
| 07 MAY 2026 | A00130461 | Atlanta District | Transportation Non-Roadway, IH 30 (1.6 Mi W of US 67, WB to 1.0 Mi W of US 67, WB) | 2 of 6 | $10,553,425 | +11% |
| 08 APR 2026 | A00212486 | Tyler District | Construct Bridge, SL 323 (0.12 mi S of US 271 to UPRR) | 8 of 9 | $1,841,736 | +21% |
| 05 MAR 2026 | A00138814 | Paris District | Preventive Maintenance, SH 11 (SH 19 to SH 154) | 2 of 4 | $1,687,995 | +3.0% |
| 07 JAN 2026 | A00196226 | Tyler District | Rehabilitate Existing Roadway, FM 3309 (SL 256 to SH 155) | 1 of 5 | $1,861,683 | Low, 2.0% under the second |
| 06 JAN 2026 | A00206402 | Tyler District | Hazard Elimination & Safety, SH 37 (CR 2460 to CR 2302 (0.23 mi N SL 564)) | 1 of 8 | $4,058,410 | Low, 11% under the second |
| 02 DEC 2025 | A00135364 | Dallas District | Rehabilitate Existing Roadway, FM 636 (CR 4668/ Morgan Springs Rd to SH 31) | 4 of 7 | $6,935,863 | +14% |
| 06 NOV 2025 | A00059355 | Tyler District | Highway Improvement, SH 19 (US 80, S to IH 20, IN CANTON) | 2 of 9 | $11,747,064 | +5.0% |
| 08 OCT 2025 | A00208073 | Atlanta District | Rehabilitate Existing Roadway, SH 49 (0.1 MI. E. OF SH 155 to Marion C/L) | 6 of 9 | $13,893,298 | +26% |
| 04 SEP 2025 | A00189017 | Dallas District | Rehabilitate Existing Roadway, FM 3486 (FM 986 to SH 34) | 5 of 6 | $1,179,790 | +14% |
| 08 AUG 2025 | A00196862 | Tyler District | Hazard Elimination & Safety, FM 855 (US 175 to US 69) | 5 of 13 | $5,077,561 | +24% |
| 07 AUG 2025 | A00184820 | Dallas District | Highway Improvement, SH 198 (North of US 175 to FM 3080) | 2 of 9 | $5,262,891 | +2.0% |
| 02 JUL 2025 | A00192923 | Atlanta District | Hazard Elimination & Safety, SH 43 (Rusk CL to Harrison CL) | 3 of 11 | $2,738,626 | +18% |
| 01 JUL 2025 | A00193092 | Tyler District | Hazard Elimination & Safety, FM 1990 (0.1 mi N of Gum Cr to CR 2137) | 6 of 10 | $2,369,901 | +45% |
| 02 MAY 2025 | A00184738 | Paris District | Hazard Elimination & Safety, SH 34 (Traders Rd to FM 1570) | 1 of 6 | $4,125,934 | Low, 1.0% under the second |
| 03 APR 2025 | A00064052 | Dallas District | Rehabilitate Existing Roadway, FM 2727 (SH 243 to FM 429) | 2 of 9 | $17,299,428 | +3.0% |
| 03 APR 2025 | A00187424 | Paris District | Rehabilitate Existing Roadway, FM 21 (SH 37 to Titus County Line) | 6 of 9 | $11,328,665 | +24% |
| 07 JAN 2025 | A00178624 | Tyler District | Rehabilitate Existing Roadway, FM 279 (.24 MI E of FM 314 to Smith C/L) | 2 of 8 | $8,355,736 | +7.0% |
| 05 JUN 2024 | 06243021 | Atlanta District | FM 2796 Widen road - add shoulders from SH 155 to FM 593 | 4 of 6 | $6,188,587 | +21% |
| 03 MAY 2024 | 05243207 | Tyler District | FM 1651 Rehabilitate existing roadway from SH 198 E. to SH 19 | 1 of 4 | $10,542,339 | Low, 6.0% under the second |
| 04 APR 2024 | 04243030 | Dallas District | FM 148 Rehabilitate existing roadway from FM 2613 to SH 274 | 1 of 5 | $9,345,342 | Low, 7.0% under the second |
| 02 FEB 2024 | 02243217 | Dallas District | FM 1391 Bridge replacement from FM 1391 AT CEDAR CREEK | 2 of 10 | $5,656,473 | +4.0% |
| 05 JAN 2024 | 01243216 | Tyler District | US 69 Rehabilitate existing roadway from RAINS C/L to FM 779 | 5 of 6 | $8,467,226 | +33% |
| 07 SEP 2023 | 09233226 | Tyler District | SH 31 Resurface roadway from 2.6 MILES WEST OF SH 198 | 1 of 4 | $2,061,802 | Low, 13% under the second |
| 27 JUN 2023 | 06233420 | Tyler District | CR Bridge replacement from CR 35, HITTS CREEK TRIB, STR NO 104 | 1 of 7 | $4,280,740 | Low, 3.0% under the second |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.