TxDOT contract A00208073 bid tabulation
Rehabilitate Existing Roadway, SH 49 (0.1 MI. E. OF SH 155 to Marion C/L). Let by Texas DOT on October 8, 2025, Cass, Atlanta District. 9 bids received; low bid $11,029,939 by L. S. Equipment Co., Inc., -17% against the engineer's estimate of $13,278,536.
- Owner
- Texas DOT
- Letting
- 08 OCT 2025
- Pay items
- 77
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | L. S. Equipment Co., Inc. | $11,029,939 | Low | -17% |
| 2 | H. V. Caver, Inc. | $12,666,989 | +15% | -5.0% |
| 3 | D. L. Lennon Incorporated - Contractor | $13,225,963 | +20% | 0.0% |
| 4 | East Texas Bridge, Inc. | $13,467,957 | +22% | +1.0% |
| 5 | H. H. Howard & Sons, Inc. | $13,823,100 | +25% | +4.0% |
| 6 | Baker & Company Construction, LLC | $13,893,298 | +26% | +5.0% |
| 7 | RK Hall, LLC | $13,996,913 | +27% | +5.0% |
| 8 | Pinto Construction Co., Inc. | $15,219,688 | +38% | +15% |
| 9 | Longview Bridge and Road, LTD. | $15,629,295 | +42% | +18% |
Engineer's estimate: $13,278,536.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. L. S. Equipment Co., Inc. | 2. H. V. Caver, Inc. | 3. D. L. Lennon Incorporated - Contractor | 4. East Texas Bridge, Inc. | 5. H. H. Howard & Sons, Inc. | 6. Baker & Company Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 269 | $2,000.00 | $1,000.00 | $1,450.00 | $1,452.11 | $1,950.00 | $1,400.00 | $1,490.00 |
| 2 | Removing concrete (mowstrip) (104-7005) | LF | 630 | $21.50 | $8.99 | $15.00 | $10.00 | $10.00 | $5.95 | |
| 3 | Remove (6"-10") TRT/untrt base & asphalt pavement (105-7006) | SY | 110,333 | $8.50 | $3.25 | $3.83 | $6.79 | $7.75 | $9.20 | $4.30 |
| 4 | Embankment (vehicle)(OC)(type C) (132-7017) | CY | 100 | $40.00 | $25.00 | $50.00 | $63.00 | $40.00 | $40.00 | $23.75 |
| 5 | Backfill (type B) (134-7002) | STA | 287.75 | $70.00 | $100.00 | $300.00 | $260.00 | $175.00 | $500.00 | $350.00 |
| 6 | Blading (150-7001) | STA | 287.75 | $113.00 | $100.00 | $300.00 | $310.00 | $125.00 | $250.00 | $280.00 |
| 7 | Broadcast seed (temporary_warm) (164-7005) | SY | 19,670 | $0.25 | $0.17 | $0.17 | $0.09 | $0.10 | $0.10 | $0.12 |
| 8 | Broadcast seed (temporary_cool) (164-7006) | SY | 19,670 | $0.25 | $0.22 | $0.22 | $0.09 | $0.10 | $0.10 | $0.12 |
| 9 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7076) | SY | 78,676 | $0.50 | $0.59 | $0.59 | $0.53 | $0.58 | $0.55 | $0.80 |
| 10 | Vegetative watering (168-7001) | TGL | 1,888.30 | $0.22 | $0.01 | $0.01 | $25.00 | $5.00 | $5.00 | $1.00 |
| 11 | FL BS (compacted in place)(type A GR 4) (8") (247-7069) | SY | 103,951 | $20.00 | $20.25 | $26.00 | $26.80 | $27.00 | $25.00 | $26.00 |
| 12 | Cement (275-7001) | TON | 2,780 | $257.00 | $240.00 | $235.00 | $275.00 | $270.00 | $300.00 | $275.00 |
| 13 | Cement TRT (new base)(8") (275-7011) | SY | 103,951 | $4.00 | $2.25 | $4.00 | $3.60 | $2.85 | $3.50 | $5.65 |
| 14 | Cement TRT (subgrade) (8") (275-7018) | SY | 79,883 | $3.00 | $2.25 | $4.03 | $3.60 | $2.65 | $3.50 | $6.70 |
| 15 | Prime coat & blotter (MC-30) (310-7010) | GAL | 25,989 | $6.25 | $4.00 | $8.04 | $7.50 | $5.45 | $6.00 | $7.95 |
| 16 | Asphalt (AC-20-5TR) (316-7007) | GAL | 37,422 | $4.00 | $4.85 | $5.91 | $5.00 | $5.25 | $4.75 | $8.60 |
| 17 | Aggregate (type-PB, GR-4)(sac-A) (316-7136) | CY | 744 | $165.00 | $185.00 | $196.58 | $212.00 | $175.00 | $200.00 | $267.00 |
| 18 | SP mixes SP-C PG70-22 (344-7019) | TON | 16,632 | $165.00 | $149.00 | $147.00 | $151.20 | $150.00 | $146.20 | $157.00 |
| 19 | SP mixes SP-C sac-A PG76-22 (344-7030) | TON | 17,772 | $162.00 | $154.00 | $153.50 | $157.61 | $158.00 | $152.61 | $159.00 |
| 20 | Tack coat (344-7077) | GAL | 27,031 | $3.00 | $7.14 | $7.35 | $7.14 | $4.75 | $7.14 | $9.30 |
| 21 | Planing asphalt concrete pavement(2") (354-7051) | SY | 3,222 | $3.25 | $2.74 | $6.86 | $4.50 | $5.00 | $6.75 | |
| 22 | Planing asphalt concrete pavement(3") (354-7052) | SY | 7,927 | $2.25 | $3.25 | $2.84 | $6.79 | $4.65 | $5.00 | $3.45 |
| 23 | Planing asphalt concrete pavement(4") (354-7053) | SY | 96,818 | $3.00 | $2.50 | $1.69 | $5.45 | $3.15 | $5.70 | $3.40 |
| 24 | Cut & restore asphalt paving (400-7008) | SY | 33 | $152.00 | $279.00 | $350.00 | $100.00 | $100.00 | $150.00 | $330.00 |
| 25 | Riprap (mow strip)(4 in) (432-7013) | CY | 34 | $900.00 | $433.89 | $825.00 | $700.00 | $700.00 | $891.00 | |
| 26 | RC pipe (CL III)(18 in) (464-7003) | LF | 144 | $58.00 | $55.00 | $52.57 | $60.00 | $65.00 | $80.00 | $61.50 |
| 27 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 8 | $800.00 | $900.00 | $770.00 | $1,000.00 | $1,000.00 | $900.00 | $1,068.00 |
| 28 | Removing structure (set) (496-7004) | EACH | 2 | $615.00 | $250.00 | $550.00 | $250.00 | $250.00 | $100.00 | $990.00 |
| 29 | Removing structure (pipe) (496-7007) | LF | 120 | $21.00 | $10.00 | $20.00 | $20.00 | $10.00 | $10.00 | $16.50 |
| 30 | Mobilization (500-7001) | LS | 1 | $1,220,000 | $500,000 | $775,000 | $298,275 | $940,000 | $1,000,000 | $550,000 |
| 31 | Barricades, signs and traffic handling (502-7001) | MO | 19 | $6,000.00 | $3,000.00 | $7,072.37 | $7,056.50 | $5,000.00 | $3,000.00 | $14,800 |
| 32 | Portable changeable message sign (503-7002) | EACH | 5 | $6,000.00 | $1,600.00 | $15,000 | $15,000 | $18,000 | $20,000 | $13,125 |
| 33 | TMA (stationary) (505-7001) | DAY | 365 | $185.00 | $150.00 | $200.00 | $200.00 | $250.00 | $200.00 | $245.00 |
| 34 | TMA (mobile operation) (505-7003) | DAY | 20 | $260.00 | $150.00 | $225.00 | $200.00 | $300.00 | $500.00 | $1,510.00 |
| 35 | Rock filter dams (install) (type 2) (506-7002) | LF | 128 | $47.00 | $46.00 | $46.00 | $38.00 | $42.00 | $40.00 | $29.00 |
| 36 | Rock filter dams (remove) (506-7011) | LF | 128 | $14.00 | $16.00 | $16.00 | $9.00 | $10.00 | $10.00 | $3.00 |
| 37 | Temporary sediment control fence (install) (506-7039) | LF | 264 | $4.00 | $5.00 | $5.00 | $4.00 | $4.50 | $4.00 | $5.25 |
| 38 | Temporary sediment control fence (remove) (506-7041) | LF | 264 | $1.00 | $1.00 | $1.00 | $0.69 | $0.75 | $1.00 | $1.05 |
| 39 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 54,951 | $0.30 | $0.28 | $0.16 | $1.07 | $0.30 | $0.25 | $0.30 |
| 40 | Metal W-beam guard fence (timber post) (540-7001) | LF | 400 | $25.50 | $20.00 | $20.00 | $22.00 | $25.00 | $21.00 | |
| 41 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $1,650.00 | $2,095.00 | $1,825.00 | $1,700.00 | $1,575.00 | $1,600.00 | |
| 42 | Remove metal beam guard fence (542-7001) | LF | 350 | $4.00 | $3.00 | $3.00 | $3.30 | $3.00 | $3.15 | |
| 43 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 4 | $157.50 | $200.00 | $200.00 | $220.00 | $150.00 | $210.00 | |
| 44 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,050.00 | $2,900.00 | $2,900.00 | $3,200.00 | $3,000.00 | $3,045.00 | |
| 45 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $212.00 | $200.00 | $200.00 | $220.00 | $250.00 | $210.00 | |
| 46 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 23 | $290.00 | $307.00 | $307.00 | $230.00 | $340.00 | $350.00 | $242.00 |
| 47 | Mailbox install-D (TWG-post) type 2 (560-7003) | EACH | 3 | $343.00 | $343.00 | $300.00 | $380.00 | $500.00 | $285.00 | |
| 48 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 1 | $772.00 | $772.00 | $870.00 | $850.00 | $800.00 | $915.00 | |
| 49 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 5 | $722.00 | $722.00 | $755.00 | $800.00 | $1,000.00 | $830.00 | |
| 50 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 8 | $775.00 | $775.00 | $830.00 | $850.00 | $900.00 | $1,008.00 | |
| 51 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 3 | $839.00 | $1,030.00 | $1,030.00 | $1,225.00 | $1,135.00 | $1,500.00 | $1,330.00 |
| 52 | Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025) | EACH | 1 | $1,750.00 | $907.00 | $907.00 | $1,030.00 | $1,000.00 | $1,000.00 | $1,055.00 |
| 53 | Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026) | EACH | 2 | $950.00 | $990.00 | $990.00 | $1,160.00 | $1,100.00 | $1,000.00 | $1,071.00 |
| 54 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 3 | $787.00 | $1,060.00 | $1,060.00 | $1,265.00 | $1,175.00 | $1,200.00 | $1,330.00 |
| 55 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | $1,074.00 | $1,074.00 | $1,290.00 | $1,185.00 | $1,100.00 | $1,305.00 | |
| 56 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 30 | $459.00 | $458.00 | $458.00 | $340.00 | $500.00 | $500.00 | $546.00 |
| 57 | Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058) | EACH | 3 | $380.00 | $532.00 | $532.00 | $460.00 | $585.00 | $600.00 | $693.00 |
| 58 | Remove SM RD SN sup&AM (644-7073) | EACH | 57 | $100.00 | $101.00 | $101.00 | $75.00 | $100.00 | $100.00 | $142.00 |
| 59 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 12 | $27.00 | $31.00 | $31.00 | $34.00 | $30.00 | $33.00 | |
| 60 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 38 | $47.00 | $126.00 | $126.00 | $50.00 | $135.00 | $130.00 | $100.00 |
| 61 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 117,102 | $0.35 | $0.28 | $0.23 | $0.23 | $0.33 | $0.32 | $0.25 |
| 62 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 117,102 | $0.35 | $0.28 | $0.23 | $0.23 | $0.33 | $0.32 | $0.25 |
| 63 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 38 | $0.50 | $1.00 | $2.00 | $2.00 | $1.00 | $10.00 | $3.15 |
| 64 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 1,302 | $2.62 | $1.00 | $1.75 | $2.00 | $1.00 | $10.00 | $3.15 |
| 65 | All-wther PM type I (W)6"(solid)(100MIL) (666-7309) | LF | 59,551 | $0.58 | $0.65 | $0.60 | $0.60 | $1.00 | $1.00 | $0.65 |
| 66 | All-wther PM type I (W)6"(broken)(100MIL) (666-7310) | LF | 30 | $0.65 | $1.25 | $1.00 | $1.00 | $2.20 | $3.00 | $1.05 |
| 67 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 40,498 | $0.63 | $0.75 | $0.68 | $0.68 | $1.00 | $1.00 | $0.70 |
| 68 | All-wther PM type I (Y)6"(broken)(100MIL) (666-7316) | LF | 1,970 | $1.30 | $1.00 | $1.00 | $1.35 | $1.50 | $1.05 | |
| 69 | All-wther PM type I (W) 8"(solid)(100MIL) (666-7425) | LF | 50 | $11.00 | $2.50 | $2.00 | $2.00 | $2.20 | $2.00 | $2.10 |
| 70 | PRFB rumble strip (BLK)(1')(centerline) (668-7002) | LF | 5,689 | $3.00 | $6.50 | $6.50 | $6.50 | $5.50 | $6.00 | $6.85 |
| 71 | Prefabricated PM type C (W)(8")(solid) (668-7084) | LF | 50 | $6.50 | $8.00 | $8.00 | $8.00 | $5.50 | $5.00 | $8.40 |
| 72 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 250 | $16.00 | $17.65 | $17.65 | $17.65 | $16.50 | $20.00 | $18.55 |
| 73 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 1 | $241.00 | $305.00 | $300.00 | $300.00 | $330.00 | $300.00 | $315.00 |
| 74 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 1 | $321.00 | $425.00 | $400.00 | $400.00 | $550.00 | $1,000.00 | $420.00 |
| 75 | PRFB rumble strip (BLK)(1')(edgeline) (668-7137) | LF | 400 | $7.00 | $6.50 | $6.50 | $13.75 | $15.00 | $6.85 | |
| 76 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 703 | $4.15 | $5.75 | $5.75 | $5.75 | $5.50 | $5.00 | $6.05 |
| 77 | Reflectorized pavement marker type II-C-C (672-7005) | EACH | 6 | $5.00 | $5.75 | $5.75 | $5.75 | $5.50 | $6.00 | $6.05 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of October 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.