Pinto Construction Co., Inc.: TxDOT bid record
Pinto Construction Co., Inc. submitted 27 bids on Texas DOT contracts in the data, from 04 JUN 2020 to 01 JUL 2026, and was the low bidder on 12 of them (44%). When it was not low, its total sat a median +5.0% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $93,217,772
- Latest bid
- 01 JUL 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 3 | 2 | 67% |
| 2021 | 4 | 1 | 25% |
| 2022 | 2 | 0 | 0% |
| 2023 | 4 | 2 | 50% |
| 2024 | 3 | 3 | 100% |
| 2025 | 5 | 2 | 40% |
| 2026 | 6 | 2 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Lufkin District | 18 | 9 | 50% |
| Beaumont District | 6 | 2 | 33% |
| Tyler District | 2 | 1 | 50% |
| Atlanta District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| TMA (mobile operation) | 505-7003 | DAY | 24 | 19 (79%) | $50.00 | $291.17 |
| Barricades, signs and traffic handling | 502-7001 | MO | 27 | 16 (59%) | $2,500.00 | $5,000.00 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 27 | 12 (44%) | $5.25 | $5.00 |
| Cement | 275-7001 | TON | 18 | 12 (67%) | $214.95 | $230.00 |
| Set (type II) (18 in) (RCP) (6: 1) (P) | 467-7308 | EACH | 23 | 10 (43%) | $900.00 | $1,300.00 |
| Construction exits (remove) | 506-7024 | SY | 18 | 10 (56%) | $4.10 | $10.00 |
| Class C concrete (collar) | 420-7061 | EACH | 17 | 10 (59%) | $1,100.00 | $1,457.90 |
| TMA (stationary) | 505-7001 | DAY | 26 | 9 (35%) | $250.00 | $230.00 |
| RC pipe (CL III)(24 in) | 464-7005 | LF | 22 | 9 (41%) | $101.58 | $108.13 |
| Removing structure (pipe) | 496-7037 | EACH | 18 | 9 (50%) | $343.88 | $600.00 |
| Spec excavation work (hyd excavator) | 158-7002 | HR | 18 | 9 (50%) | $131.25 | $160.00 |
| Set (type II) (18 in) (RCP) (4: 1) (C) | 467-7306 | EACH | 16 | 9 (56%) | $840.00 | $1,214.60 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| A. L. Helmcamp, Inc. | 19 | 3 of 19 |
| Drewery Construction Company, Incorporated | 19 | 5 of 19 |
| Longview Bridge and Road, LTD. | 10 | 1 of 10 |
| L. S. Equipment Co., Inc. | 8 | 2 of 8 |
| East Texas Bridge, Inc. | 7 | 1 of 7 |
| Big Creek Construction, LTD. | 5 | 2 of 5 |
| Texas Materials Group, Inc. | 4 | 1 of 4 |
| Cornerstone Paving and Construction, L.L.C. | 2 | 2 of 2 |
| THK Construction LLC | 2 | 0 of 2 |
| Isi Contracting, Inc. | 2 | 0 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 JUL 2026 | A00206568 | Lufkin District | Hazard Elimination & Safety, FM 3016 (FM 228 to CR 1685) | 2 of 5 | $3,853,111 | +1.0% |
| 03 JUN 2026 | A00206565 | Lufkin District | Hazard Elimination & Safety, FM 227 (FM 2544 to 3.3 MILES EAST OF FM 2544) | 1 of 9 | $4,462,648 | Low, 9.0% under the second |
| 06 MAY 2026 | A00193119 | Lufkin District | Hazard Elimination & Safety, FM 2259 (SH 7 to 2.55 MI S OF SH 7) | 2 of 9 | $5,333,070 | +5.0% |
| 08 APR 2026 | A00196681 | Beaumont District | Surfacing/Roadway Restoration, US 287 (RUSSELL CREEK BRIDGE, SOUTH to US 69) | 2 of 5 | $21,505,037 | +3.0% |
| 05 FEB 2026 | A00058517 | Tyler District | Highway Improvement, SH 204 (RUSK C/L AT REKLAW, SE to CHEROKEE C/L) | 1 of 8 | $10,286,588 | Low, 3.0% under the second |
| 06 JAN 2026 | A00184512 | Tyler District | Hazard Elimination & Safety, SH 64 (CR 4133 to SL 571) | 2 of 5 | $14,133,502 | +4.0% |
| 08 OCT 2025 | A00208073 | Atlanta District | Rehabilitate Existing Roadway, SH 49 (0.1 MI. E. OF SH 155 to Marion C/L) | 8 of 9 | $15,219,688 | +38% |
| 08 AUG 2025 | A00064662 | Lufkin District | Highway Improvement, FM 2076 (END OF PAVEMENT to FM 229) | 3 of 6 | $10,219,518 | +3.0% |
| 02 JUL 2025 | A00184100 | Beaumont District | Hazard Elimination & Safety, FM 256 (US 69, EAST to CLEAR FORK CREEK) | 2 of 5 | $6,400,629 | +14% |
| 01 JUL 2025 | A00064919 | Lufkin District | Highway Improvement, US 96 (FM 83 to 0.15 mi N of SS 414) | 1 of 5 | $14,650,398 | Low, 7.0% under the second |
| 07 JAN 2025 | A00178004 | Lufkin District | Hazard Elimination & Safety, FM 947 (2.961 mi W of FM 2695 to FM 2695) | 1 of 4 | $5,239,176 | Low, 18% under the second |
| 10 JUL 2024 | 07243213 | Lufkin District | FM 1751 Hazard elimination & safety from 3.00 MI N OF FM 83 to FM 83 | 1 of 2 | $11,134,225 | Low, 6.0% under the second |
| 06 JUN 2024 | 06243233 | Lufkin District | FM 3124 Hazard elimination & safety from FM 2109 to 2.302 MI E OF FM 2109 | 1 of 2 | $3,926,437 | Low, 9.0% under the second |
| 03 MAY 2024 | 05243209 | Lufkin District | FM 58 Roadway rehabilitation/reconstruction with no add from WHITEHOUSE DR. to 1.25 MILES SOUTH OF FM 2108 | 1 of 3 | $11,095,200 | Low, 13% under the second |
| 02 JUN 2023 | 06233221 | Beaumont District | FM 1632 Surfacing/roadway restoration from FM 256, SOUTH to US 69 | 1 of 2 | $5,136,533 | Low, 19% under the second |
| 05 MAY 2023 | 05233218 | Lufkin District | FM 1878 Hazard elimination & safety from FM 2112 to CR 280 | 2 of 3 | $5,000,000 | +3.0% |
| 04 MAY 2023 | 05233013 | Lufkin District | FM 1277 Hazard elimination & safety from CR 3140 to SH 103 | 1 of 2 | $12,057,158 | Low, 12% under the second |
| 08 MAR 2023 | 03233232 | Lufkin District | FM 2680 Hazard elimination & safety from END OF PAVEMENT to US 69 | 2 of 2 | $5,013,875 | +88% |
| 03 NOV 2022 | 11223208 | Lufkin District | FM 2781 Highway improvement from CR 551 to TRINITY COUNTY LINE, ETC. | 2 of 4 | $12,811,394 | +6.0% |
| 03 AUG 2022 | 08223032 | Lufkin District | FS 357 Hazard elimination & safety from END OF PAVEMENT to FM 357/FM 233 | 3 of 4 | $1,767,921 | +7.0% |
| 05 AUG 2021 | 08213228 | Lufkin District | FM 2022 Widen road - add shoulders from FM 2423 to FM 2663 | 1 of 4 | $4,532,080 | Low, 12% under the second |
| 01 JUL 2021 | 07213033 | Beaumont District | RE 255 Surfacing/roadway restoration from 2.30 MILES WEST OF FM 1007 to 0.11 MILES EAST OF FM 1007 | 2 of 4 | $2,277,318 | +2.0% |
| 04 FEB 2021 | 02213009 | Lufkin District | FM 841 Replace guardrail from FM 325 to US 69 | 2 of 6 | $5,402,373 | +3.0% |
| 07 JAN 2021 | 01213011 | Beaumont District | FM 1746 Surfacing roadway restoration from FM 2992, EAST to FM 92 | 3 of 5 | $4,137,193 | +7.0% |
| 06 AUG 2020 | 08203217 | Lufkin District | FM 1275 Widen road - add shoulders from FM 1275 to END OF PAVEMENT | 1 of 5 | $6,199,551 | Low, 3.0% under the second |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.