TxDOT contract A00064662 bid tabulation
Highway Improvement, FM 2076 (END OF PAVEMENT to FM 229). Let by Texas DOT on August 8, 2025, Houston, Lufkin District. 6 bids received; low bid $9,900,198 by Drewery Construction Company, Incorporated, -13% against the engineer's estimate of $11,385,717.
- Owner
- Texas DOT
- Letting
- 08 AUG 2025
- Pay items
- 121
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Drewery Construction Company, Incorporated | $9,900,198 | Low | -13% |
| 2 | Big Creek Construction, LTD. | $10,087,828 | +2.0% | -11% |
| 3 | Pinto Construction Co., Inc. | $10,219,518 | +3.0% | -10% |
| 4 | L. S. Equipment Co., Inc. | $10,716,479 | +8.0% | -6.0% |
| 5 | A. L. Helmcamp, Inc. | $10,982,555 | +11% | -4.0% |
| 6 | Vulcan Materials Asphalt and Construction, LLC | $11,299,095 | +14% | -1.0% |
Engineer's estimate: $11,385,717.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Drewery Construction Company, Incorporated | 2. Big Creek Construction, LTD. | 3. Pinto Construction Co., Inc. | 4. L. S. Equipment Co., Inc. | 5. A. L. Helmcamp, Inc. | 6. Vulcan Materials Asphalt and Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 315.90 | $2,500.00 | $1,450.00 | $2,500.00 | $1,500.00 | $1,800.00 | $2,300.00 | $2,175.00 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 878 | $35.00 | $31.00 | $20.00 | $29.40 | $24.00 | $15.00 | $35.00 |
| 3 | Removing concrete (curb) (104-7016) | LF | 256 | $10.00 | $19.00 | $20.00 | $18.90 | $24.00 | $15.00 | $12.00 |
| 4 | Subgr widen (OC) (112-7001) | STA | 315.90 | $500.00 | $363.00 | $750.00 | $533.47 | $1,000.00 | $600.00 | $485.16 |
| 5 | Embankment (vehicle)(OC)(type B) (132-7015) | CY | 15,130 | $20.00 | $26.00 | $30.00 | $24.57 | $21.50 | $36.00 | $23.82 |
| 6 | Blading (150-7001) | STA | 315.90 | $200.00 | $300.00 | $500.00 | $393.48 | $250.00 | $200.00 | $472.44 |
| 7 | Spec excavation work (hyd excavator) (158-7002) | HR | 149 | $175.00 | $255.00 | $100.00 | $131.25 | $100.00 | $300.00 | $250.00 |
| 8 | Block sodding (162-7002) | SY | 4,935 | $6.00 | $7.00 | $7.00 | $6.59 | $8.00 | $6.00 | $5.99 |
| 9 | Broadcast seed (temporary_warm) (164-7005) | SY | 122,766 | $0.50 | $0.11 | $0.16 | $0.14 | $0.18 | $0.14 | $0.13 |
| 10 | Broadcast seed (temporary_cool) (164-7006) | SY | 122,766 | $0.50 | $0.13 | $0.16 | $0.14 | $0.18 | $0.14 | $0.13 |
| 11 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7073) | SY | 245,532 | $1.00 | $0.63 | $0.60 | $0.58 | $0.65 | $0.55 | $0.53 |
| 12 | Vegetative watering (168-7001) | TGL | 9,930.10 | $20.00 | $0.01 | $10.00 | $0.01 | $0.01 | $1.00 | $15.48 |
| 13 | Sprinkling (dust control) (204-7001) | TGL | 913 | $50.00 | $0.01 | $50.00 | $0.01 | $0.01 | $5.00 | $38.62 |
| 14 | FL BS (roadway del) (type D GR 1-2 or GR 5) (247-7217) | TON | 36,627 | $60.00 | $55.00 | $50.00 | $53.61 | $54.50 | $58.00 | $66.29 |
| 15 | Geogrid base reinforcement (type 1) (250-7001) | SY | 4,810 | $4.00 | $10.20 | $5.00 | $15.08 | $9.50 | $5.00 | $4.86 |
| 16 | Rework BS metal (type B)(6")(ord comp) (251-7025) | SY | 4,810 | $5.00 | $14.50 | $15.00 | $14.98 | $7.50 | $6.00 | $8.40 |
| 17 | Cement (275-7001) | TON | 1,665 | $225.00 | $270.00 | $250.00 | $185.00 | $240.00 | $225.00 | $215.00 |
| 18 | Cement TRT (existing material & new base)(12") (275-7009) | SY | 86,450 | $5.00 | $4.25 | $3.00 | $5.07 | $4.25 | $7.50 | $5.96 |
| 19 | Cement TRT (new base)(12") (275-7013) | SY | 4,810 | $5.00 | $4.70 | $15.00 | $5.07 | $7.50 | $9.00 | $16.75 |
| 20 | Emuls asphalt (erosion control)(SS-1) (314-7008) | GAL | 4,214 | $7.00 | $3.40 | $6.00 | $7.03 | $6.50 | $4.50 | $4.33 |
| 21 | Asphalt (RC-250) (316-7032) | TON | 98.90 | $1,100.00 | $1,150.00 | $1,200.00 | $1,358.36 | $1,470.00 | $1,100.00 | $1,225.02 |
| 22 | Asphalt (AC-15P or CRS-2P) (316-7088) | TON | 167 | $1,100.00 | $900.00 | $1,000.00 | $988.78 | $1,298.00 | $1,050.00 | $926.47 |
| 23 | Aggregate (type E or L, GR-5) (316-7254) | CY | 651 | $180.00 | $195.00 | $250.00 | $190.01 | $190.00 | $250.00 | $420.52 |
| 24 | Aggregate (type E or L, PE or PL GR 4) (316-7268) | CY | 676 | $190.00 | $185.00 | $150.00 | $195.62 | $196.00 | $260.00 | $418.65 |
| 25 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 10,040 | $180.00 | $171.00 | $130.00 | $159.60 | $164.00 | $150.00 | $136.24 |
| 26 | Cem stabil BKFL (400-7010) | CY | 54 | $250.00 | $253.00 | $400.00 | $317.10 | $400.00 | $360.00 | $200.00 |
| 27 | Flowable backfill (401-7001) | CY | 33 | $250.00 | $393.00 | $400.00 | $341.25 | $400.00 | $360.00 | $350.00 |
| 28 | Trench excavation protection (402-7001) | LF | 11 | $50.00 | $17.00 | $25.00 | $31.50 | $60.00 | $16.00 | $10.00 |
| 29 | Temporary special shoring (403-7001) | SF | 3,731 | $55.00 | $51.00 | $35.00 | $52.50 | $50.00 | $48.00 | $40.00 |
| 30 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 16 | $700.00 | $466.00 | $200.00 | $190.10 | $265.50 | $435.00 | $172.82 |
| 31 | Class A concrete (collar) (420-7008) | EACH | 10 | $1,700.00 | $1,350.00 | $1,000.00 | $1,908.90 | $2,200.00 | $790.00 | $1,200.00 |
| 32 | Class C concrete (wingwalls) (420-7146) | CY | 3 | $1,500.00 | $3,370.00 | $3,000.00 | $4,200.00 | $5,500.00 | $2,600.00 | $2,500.00 |
| 33 | Riprap (concrete)(5 in) (432-7002) | CY | 6 | $800.00 | $1,125.00 | $800.00 | $806.40 | $3,000.00 | $761.00 | $850.00 |
| 34 | Riprap (stone common)(dry)(24 in) (432-7034) | CY | 346 | $325.00 | $280.00 | $150.00 | $327.60 | $250.00 | $262.00 | $250.00 |
| 35 | Miscellaneous non-bridge (nbis) (442-7017) | LB | 56 | $50.00 | $17.00 | $25.00 | $11.00 | $275.00 | $26.00 | $200.00 |
| 36 | Concrete box culvert (4 FT X 2 FT)(extend) (462-7058) | LF | 59 | $1,000.00 | $785.00 | $1,000.00 | $945.00 | $800.00 | $998.00 | $650.00 |
| 37 | Concrete box culvert (4 FT X 3 FT)(extend) (462-7059) | LF | 20 | $1,100.00 | $840.00 | $1,150.00 | $997.50 | $767.00 | $1,105.00 | $700.00 |
| 38 | Concrete box culvert (5 FT X 5 FT)(extend) (462-7064) | LF | 11 | $1,500.00 | $900.00 | $1,300.00 | $1,260.00 | $900.00 | $1,260.00 | $800.00 |
| 39 | Concrete box culvert (7 FT X 7 FT)(extend) (462-7074) | LF | 14 | $2,000.00 | $1,000.00 | $1,500.00 | $1,538.25 | $1,200.00 | $1,470.00 | $900.00 |
| 40 | Concrete box culvert (8 FT X 6 FT)(extend) (462-7078) | LF | 20 | $1,500.00 | $1,350.00 | $1,600.00 | $1,305.15 | $1,400.00 | $1,575.00 | $1,000.00 |
| 41 | Concrete box culvert (10 FT X 10 FT)(extend) (462-7093) | LF | 3 | $4,000.00 | $3,400.00 | $4,000.00 | $3,839.85 | $3,600.00 | $3,150.00 | $3,000.00 |
| 42 | Concrete box culvert (4 FT X 5 FT) (extend) (462-7130) | LF | 4 | $1,300.00 | $1,000.00 | $1,300.00 | $1,601.25 | $1,200.00 | $1,260.00 | $900.00 |
| 43 | Concrete box culvert (5 FT X 9 FT) (extend) (462-7131) | LF | 4 | $2,000.00 | $1,125.00 | $1,400.00 | $1,634.85 | $1,500.00 | $1,365.00 | $1,000.00 |
| 44 | RC pipe (CL III)(18 in) (464-7003) | LF | 1,443 | $75.00 | $70.00 | $70.00 | $73.50 | $83.50 | $63.00 | $58.00 |
| 45 | RC pipe (CL III)(24 in) (464-7005) | LF | 244 | $150.00 | $157.00 | $105.00 | $110.25 | $97.25 | $100.00 | $130.00 |
| 46 | RC pipe (CL III)(30 in) (464-7007) | LF | 10 | $250.00 | $336.89 | $200.00 | $231.00 | $145.00 | $131.00 | $300.00 |
| 47 | Inlet(complete)(pazd)(FG)(3FTX3FT-3FTX3FT) (465-7158) | EACH | 1 | $6,800.00 | $6,200.00 | $8,500.00 | $6,825.00 | $7,500.00 | $7,875.00 | $5,500.00 |
| 48 | Headwall (CH - FW - 0) (diameter= 42 in) (466-7010) | EACH | 1 | $18,000 | $6,700.00 | $13,000 | $11,550 | $8,000.00 | $12,600 | $8,500.00 |
| 49 | Headwall (CH - PW - 0) (diameter= 18 in) (466-7099) | EACH | 2 | $9,000.00 | $3,400.00 | $9,000.00 | $8,400.00 | $4,500.00 | $8,400.00 | $4,000.00 |
| 50 | Headwall (CH - PW - 0) (diameter= 24 in) (466-7101) | EACH | 1 | $9,550.00 | $4,500.00 | $10,000 | $9,660.00 | $5,000.00 | $9,450.00 | $5,000.00 |
| 51 | Headwall (CH - PW - 0) (diameter= 30 in) (466-7103) | EACH | 1 | $12,000 | $6,200.00 | $11,000 | $15,750 | $6,250.00 | $10,500 | $6,500.00 |
| 52 | Headwall (CH - PW - 0) (diameter= 48 in) (466-7107) | EACH | 1 | $15,000 | $15,000 | $16,000 | $18,375 | $14,000 | $15,750 | $15,000 |
| 53 | Headwall (CH - PW - 0) (diameter= 66 in) (466-7110) | EACH | 1 | $17,000 | $30,000 | $21,000 | $26,250 | $30,000 | $21,000 | $26,000 |
| 54 | Headwall (CH - PW - 0) (diameter= 72 in) (466-7111) | EACH | 2 | $20,000 | $34,000 | $23,000 | $28,350 | $36,000 | $23,100 | $30,000 |
| 55 | Headwall (CH - PW - S) (diameter= 30 in) (466-7118) | EACH | 1 | $11,000 | $6,700.00 | $12,000 | $16,433 | $8,000.00 | $11,025 | $7,000.00 |
| 56 | Headwall (CH - PW - S) (diameter= 33 in) (466-7119) | EACH | 1 | $13,000 | $7,800.00 | $13,000 | $18,270 | $8,500.00 | $12,600 | $8,000.00 |
| 57 | Headwall (CH - PW - S) (diameter= 60 in) (466-7124) | EACH | 1 | $23,000 | $26,000 | $17,000 | $29,400 | $27,000 | $16,800 | $23,000 |
| 58 | Headwall (CH - PW - S) (diameter= 66 in) (466-7125) | EACH | 1 | $25,000 | $30,000 | $19,000 | $30,450 | $32,000 | $18,900 | $27,000 |
| 59 | Wingwall (FW - 0) (HW=3 FT) (466-7145) | EACH | 1 | $9,000.00 | $3,400.00 | $9,000.00 | $14,175 | $4,000.00 | $8,400.00 | $3,000.00 |
| 60 | Wingwall (FW - 0) (HW=4 FT) (466-7146) | EACH | 1 | $10,000 | $6,200.00 | $10,000 | $15,750 | $7,500.00 | $9,450.00 | $5,500.00 |
| 61 | Wingwall (FW - S) (HW=7 FT) (466-7163) | EACH | 0.50 | $20,000 | $11,000 | $15,000 | $31,500 | $12,500 | $12,600 | $9,500.00 |
| 62 | Wingwall (PW - 2) (HW=4 FT) (466-7188) | EACH | 4 | $22,000 | $6,200.00 | $15,000 | $16,590 | $7,500.00 | $14,700 | $5,500.00 |
| 63 | Wingwall (PW - 2) (HW=5 FT) (466-7189) | EACH | 1 | $25,000 | $7,900.00 | $21,000 | $22,050 | $7,500.00 | $21,000 | $7,000.00 |
| 64 | Wingwall (PW - 2) (HW=8 FT) (466-7192) | EACH | 2.50 | $26,000 | $28,000 | $41,000 | $39,900 | $27,000 | $42,000 | $25,000 |
| 65 | Wingwall (PW - 2) (HW=9 FT) (466-7193) | EACH | 1 | $28,000 | $29,000 | $43,000 | $60,585 | $29,500 | $44,100 | $26,000 |
| 66 | Wingwall (PW - 2) (HW=10 FT) (466-7194) | EACH | 1 | $30,000 | $39,300 | $51,000 | $65,625 | $41,500 | $52,500 | $35,000 |
| 67 | Wingwall (PW - 2) (HW=14 FT) (466-7198) | EACH | 1 | $35,000 | $90,000 | $80,000 | $89,250 | $87,500 | $78,750 | $80,000 |
| 68 | Wingwall (PW - 2) (HW=15 FT) (466-7199) | EACH | 1 | $40,000 | $112,000 | $90,000 | $98,280 | $115,000 | $84,000 | $100,000 |
| 69 | Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306) | EACH | 3 | $1,150.00 | $1,000.00 | $900.00 | $1,050.00 | $950.00 | $866.00 | $900.00 |
| 70 | Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307) | EACH | 2 | $1,300.00 | $1,100.00 | $1,000.00 | $1,050.00 | $950.00 | $971.00 | $1,000.00 |
| 71 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 105 | $1,300.00 | $1,100.00 | $1,000.00 | $1,050.00 | $950.00 | $971.00 | $900.00 |
| 72 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 14 | $2,000.00 | $2,800.00 | $1,700.00 | $1,995.00 | $1,150.00 | $1,680.00 | $2,500.00 |
| 73 | Clean existing culverts (480-7001) | EACH | 4 | $4,000.00 | $1,700.00 | $2,000.00 | $2,782.50 | $2,000.00 | $1,575.00 | $1,500.00 |
| 74 | Removing structure (pipe) (496-7037) | EACH | 61 | $1,000.00 | $67.00 | $500.00 | $525.00 | $30.00 | $289.00 | $850.00 |
| 75 | Mobilization (500-7001) | LS | 1 | $1,100,000 | $750,000 | $1,000,000 | $1,000,000 | $990,000 | $900,000 | $1,290,245 |
| 76 | Barricades, signs and traffic handling (502-7001) | MO | 20 | $3,500.00 | $3,560.00 | $5,000.00 | $2,500.00 | $9,500.00 | $8,000.00 | $14,463 |
| 77 | Portable changeable message sign (503-7002) | EACH | 2 | $10,000 | $7,500.00 | $8,250.00 | $20,000 | $10,000 | $15,000 | $15,000 |
| 78 | TMA (stationary) (505-7001) | DAY | 207 | $350.00 | $100.00 | $400.00 | $250.00 | $300.00 | $250.00 | $192.00 |
| 79 | TMA (mobile operation) (505-7003) | DAY | 30 | $350.00 | $100.00 | $800.00 | $50.00 | $350.00 | $250.00 | $192.00 |
| 80 | Rock filter dams (install) (type 2) (506-7002) | LF | 1,150 | $45.00 | $46.00 | $45.00 | $44.10 | $52.50 | $44.00 | $42.00 |
| 81 | Rock filter dams (remove) (506-7011) | LF | 1,150 | $15.00 | $13.50 | $5.00 | $10.50 | $10.50 | $10.00 | $10.00 |
| 82 | Construction exits (install) (type 1) (506-7020) | SY | 445 | $40.00 | $66.00 | $30.00 | $1.00 | $42.00 | $40.00 | $39.00 |
| 83 | Construction exits (remove) (506-7024) | SY | 445 | $15.00 | $20.00 | $5.00 | $1.00 | $10.00 | $10.00 | $10.00 |
| 84 | Construction perimeter fence (506-7034) | LF | 435 | $8.00 | $5.00 | $5.00 | $5.25 | $6.50 | $5.00 | $43.08 |
| 85 | Temporary sediment control fence (install) (506-7039) | LF | 15,470 | $5.00 | $4.50 | $4.30 | $4.39 | $5.00 | $4.20 | $3.99 |
| 86 | Temporary sediment control fence (remove) (506-7041) | LF | 15,470 | $1.00 | $0.70 | $1.00 | $0.42 | $1.00 | $0.40 | $0.38 |
| 87 | Driveways (concrete) (530-7006) | SY | 771 | $150.00 | $280.00 | $130.00 | $196.35 | $275.00 | $115.00 | $200.00 |
| 88 | Driveways (ACP) (530-7010) | SY | 5,810 | $75.00 | $55.00 | $45.00 | $54.12 | $60.00 | $103.00 | $44.87 |
| 89 | Turnouts (ACP) (530-7018) | SY | 457 | $100.00 | $80.00 | $65.00 | $87.54 | $90.00 | $132.00 | $95.16 |
| 90 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 31,590 | $1.00 | $0.40 | $0.50 | $0.40 | $0.75 | $0.55 | $0.08 |
| 91 | Metal W-beam guard fence (timber post) (540-7001) | LF | 500 | $30.00 | $32.00 | $35.00 | $30.80 | $32.00 | $25.00 | $28.50 |
| 92 | Metal beam guard fence (long span system) (540-7027) | EACH | 2 | $2,500.00 | $1,700.00 | $1,500.00 | $1,375.00 | $2,000.00 | $1,312.00 | $1,450.00 |
| 93 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,200.00 | $3,425.00 | $3,500.00 | $3,190.00 | $4,000.00 | $3,045.00 | $3,355.00 |
| 94 | Wire fence (type A) (552-7001) | LF | 250 | $30.00 | $28.00 | $25.00 | $40.00 | $45.00 | $30.00 | $28.00 |
| 95 | Mailbox install-M (TWG-post) type 1 (560-7001) | EACH | 4 | $650.00 | $780.00 | $700.00 | $690.80 | $695.00 | $660.00 | $620.00 |
| 96 | Mailbox install-S (WC-post) type 3 (560-7004) | EACH | 10 | $300.00 | $275.00 | $300.00 | $278.30 | $280.50 | $266.00 | $180.00 |
| 97 | Mailbox install-D (WC-post) type 3 (560-7005) | EACH | 3 | $350.00 | $300.00 | $400.00 | $327.80 | $327.50 | $313.00 | $230.00 |
| 98 | In RD IL (type ST) 40T-8 (250W EQ) LED (610-7164) | EACH | 2 | $4,650.00 | $10,100 | $8,000.00 | $7,756.88 | $9,500.00 | $9,450.00 | $7,051.71 |
| 99 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 215 | $17.00 | $17.40 | $25.00 | $21.50 | $29.50 | $16.00 | $19.54 |
| 100 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 105 | $25.00 | $31.50 | $35.00 | $30.58 | $34.25 | $29.00 | $27.80 |
| 101 | Electrical conductor (no.8) bare (620-7007) | LF | 440 | $2.30 | $3.65 | $5.00 | $3.33 | $3.50 | $3.40 | $3.03 |
| 102 | Electrical conductor (no.8) insulated (620-7008) | LF | 760 | $2.50 | $4.30 | $5.50 | $3.40 | $3.75 | $4.00 | $3.09 |
| 103 | Ground box type D (162922)W/apron (624-7008) | EACH | 5 | $1,700.00 | $1,950.00 | $2,000.00 | $1,654.39 | $2,150.00 | $1,810.00 | $1,503.99 |
| 104 | Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148) | EACH | 1 | $9,000.00 | $8,450.00 | $10,000 | $8,179.19 | $8,500.00 | $7,896.00 | $7,435.63 |
| 105 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 2 | $840.00 | $785.00 | $750.00 | $759.00 | $732.50 | $725.00 | $755.00 |
| 106 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 2 | $850.00 | $900.00 | $900.00 | $884.40 | $875.25 | $844.00 | $950.00 |
| 107 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 1 | $1,125.00 | $1,040.00 | $1,100.00 | $1,158.30 | $1,182.50 | $1,106.00 | $1,125.00 |
| 108 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 3 | $1,500.00 | $1,350.00 | $1,200.00 | $1,285.90 | $1,307.25 | $1,227.00 | $1,330.00 |
| 109 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 35 | $600.00 | $475.00 | $500.00 | $458.70 | $485.00 | $438.00 | $500.00 |
| 110 | Relocate SM RD SN sup&AM type TWT (644-7068) | EACH | 1 | $500.00 | $445.00 | $400.00 | $381.70 | $365.00 | $364.00 | $555.00 |
| 111 | Remove SM RD SN sup&AM (644-7073) | EACH | 40 | $130.00 | $140.00 | $125.00 | $108.90 | $103.00 | $104.00 | $100.00 |
| 112 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 77 | $35.00 | $42.00 | $50.00 | $34.10 | $30.00 | $33.00 | $30.00 |
| 113 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 63,180 | $1.00 | $0.25 | $0.40 | $0.24 | $0.30 | $0.23 | $0.31 |
| 114 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 3,160 | $1.00 | $2.40 | $1.50 | $2.50 | $1.40 | $1.12 | $1.27 |
| 115 | Reflectorized profile pavement marking type I(W)6"(solid)(090MIL) (666-7265) | LF | 51,400 | $0.75 | $1.00 | $0.90 | $0.99 | $1.00 | $0.95 | $0.81 |
| 116 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 11,100 | $0.75 | $0.80 | $0.77 | $0.77 | $0.80 | $0.74 | $0.72 |
| 117 | Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419) | LF | 3,350 | $0.75 | $1.15 | $0.77 | $1.10 | $1.10 | $1.05 | $0.72 |
| 118 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 46,300 | $0.75 | $0.80 | $0.77 | $0.77 | $0.80 | $0.74 | $0.72 |
| 119 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 759 | $7.00 | $6.75 | $7.00 | $6.60 | $6.40 | $6.30 | $5.80 |
| 120 | Temporary traffic signals (681-7001) | EACH | 2 | $12,000 | $3,500.00 | $10,000 | $5,000.00 | $75,000 | $15,000 | $12,116 |
| 121 | Bonding course (3007-7001) | GAL | 4,561 | $6.00 | $6.00 | $5.00 | $6.04 | $8.50 | $4.25 | $7.36 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 8, 2025. Compiled by Mirage Metrics.