Drewery Construction Company, Incorporated: TxDOT bid record

Drewery Construction Company, Incorporated submitted 107 bids on Texas DOT contracts in the data, from 12 FEB 2020 to 30 SEP 2026, and was the low bidder on 20 of them (19%). When it was not low, its total sat a median +18% above the low bid.

Owner
Texas DOT
Low bid volume
$99,959,086
Latest bid
30 SEP 2026
Data through
19 NOV 2026
107Bids
20Low bids
19Win rate, percent
+18%Median gap to the low bid when not low, 87 bids

By year

YearBidsLow bidsWin rate
202010330%
202125416%
202219316%
202311327%
20248113%
202513215%
202621419%
Drewery Construction Company, Incorporated, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Lufkin District52917%
Tyler District36411%
Beaumont District14643%
Atlanta District5120%
Drewery Construction Company, Incorporated, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Portable changeable message sign503-7002EACH5224 (46%)$10,000$10,000
Reflectorized pavement marker type II-A-A672-7004EACH6423 (36%)$4.70$5.00
TMA (stationary)505-7001DAY9119 (21%)$275.00$230.00
Reflectorized pavement marker type I-C672-7002EACH4216 (38%)$4.93$5.00
Broadcast seed (temporary) (warm)164-6009SY2816 (57%)$0.16$0.30
TMA (mobile operation)505-7003DAY5915 (25%)$200.00$291.17
Removing structure (pipe)496-7037EACH3415 (44%)$364.00$600.00
Barricades, signs and traffic handling502-7001MO9614 (15%)$6,500.00$5,000.00
Temporary sediment control fence (remove)506-7041LF5814 (24%)$1.00$1.00
RC pipe (CL III)(18 in)464-7003LF3914 (36%)$64.00$82.44
Broadcast seed (temporary) (cool)164-6011SY2814 (50%)$0.16$0.30
Work zone pavement marking non-removing (Y)4"(solid)662-7035LF2214 (64%)$0.27$0.30
Drewery Construction Company, Incorporated, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Drewery Construction Company, Incorporated, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
30 SEP 2026A00223227Lufkin DistrictMILL AND INLAY, US0059 (HOU, TRI, POLK, NAC & SHE MAINT SECTIONS to VARIOUS LOCATIONS)2 of 2$1,799,383+55%
06 AUG 2026A00196275Atlanta DistrictResurface Roadway, SH 43 (US 59 to SL 390)5 of 5$4,232,999+27%
04 AUG 2026A00220367Lufkin DistrictMILL AND INLAY, US0059 (San Jac and Angelina MNT Sections to Various Locations)2 of 3$859,999+2.0%
04 AUG 2026A00219817Lufkin DistrictMILL AND INLAY, US0059 (Nac and Shelby Maintenance Sections to VARIOUS LOCATIONS)1 of 3$593,777Low, 12% under the second
02 JUL 2026A00064356Lufkin DistrictHighway Improvement, US 259 (Rusk County Line to SH 204)3 of 6$63,974,693+4.0%
01 JUL 2026A00206568Lufkin DistrictHazard Elimination & Safety, FM 3016 (FM 228 to CR 1685)5 of 5$4,166,237+9.0%
01 JUL 2026A00206448Tyler DistrictHazard Elimination & Safety, US 69 (0.18 miles N CR 1505 (Xover @ CCECA) to CR 1503)3 of 3$1,333,220+22%
03 JUN 2026A00206565Lufkin DistrictHazard Elimination & Safety, FM 227 (FM 2544 to 3.3 MILES EAST OF FM 2544)9 of 9$6,561,594+47%
03 JUN 2026A00220774Tyler DistrictMILL AND INLAY, US0079 (VARIOUS LOCATIONS IN GREGG, RUSK, to VAN ZANDT AND WOOD COUNTIES)4 of 4$4,495,744+7.0%
02 JUN 2026A00220775Tyler DistrictMILL AND INLAY, SH0031 (VARIOUS LOCATIONS IN HENDERSON to AND CHEROKEE COUNTIES)5 of 5$1,432,981+47%
02 JUN 2026A00220776Tyler DistrictMILL AND INLAY, SH0110 (VARIOUS LOCATIONS IN SMITH AND to CHEROKEE COUNTIES)2 of 6$5,151,039+1.0%
02 JUN 2026A00220777Tyler DistrictMILL AND INLAY, IH0020 (VARIOUS to VARIOUS)1 of 5$2,670,044Low, 0.0% under the second
07 MAY 2026A00193137Lufkin DistrictHazard Elimination & Safety, US 59 (Nacogdoches City Limits to Angelina River)3 of 3$7,149,957+26%
07 MAY 2026A00133189Lufkin DistrictResurface Roadway, US 259 (SH 204 to FM 698)6 of 6$3,941,899+37%
06 MAY 2026A00193119Lufkin DistrictHazard Elimination & Safety, FM 2259 (SH 7 to 2.55 MI S OF SH 7)1 of 9$5,074,604Low, 5.0% under the second
08 APR 2026A00196681Beaumont DistrictSurfacing/Roadway Restoration, US 287 (RUSSELL CREEK BRIDGE, SOUTH to US 69)1 of 5$20,919,240Low, 3.0% under the second
07 APR 2026A00060559Tyler DistrictRoadway Rehabilitation/Reconstruction With No Added Capacity, FM 1251 (CR 394 (1.5 MI E OF FM 3135), E to PANOLA C/L (1 MI E OF FM 3231))3 of 8$9,471,823+8.0%
05 FEB 2026A00058517Tyler DistrictHighway Improvement, SH 204 (RUSK C/L AT REKLAW, SE to CHEROKEE C/L)7 of 8$12,279,155+19%
04 FEB 2026A00186267Lufkin DistrictResurface Roadway, US 59 (0.9 mi N of Piney Creek to Angelina County Line)3 of 3$11,297,786+26%
04 FEB 2026A00213638Tyler DistrictRehabilitate Existing Roadway, SS 63 (US 80 to SL 281)4 of 4$4,251,973+34%
07 JAN 2026A00196226Tyler DistrictRehabilitate Existing Roadway, FM 3309 (SL 256 to SH 155)4 of 5$2,209,920+19%
03 DEC 2025A00196221Tyler DistrictResurface Roadway, SL 281 (0.39 MI N of US 80 (Shofner Dr.) to US 259)4 of 4$14,817,768+18%
02 DEC 2025A00217157Tyler DistrictMILL AND INLAY, US0069 (Various Roadways in Smith, to Cherokee, and Van Zandt Counties)2 of 4$2,172,985+12%
06 NOV 2025A00060555Tyler DistrictSurfacing/Roadway Restoration, FM 2204 (US 259 (KILGORE BYPASS), E to FM 2011)2 of 5$3,511,2130.0%
05 SEP 2025A00196018Lufkin DistrictResurface Roadway, BU 59G (SL 287 (North) to Tulane Drive)2 of 3$4,923,210+6.0%
Drewery Construction Company, Incorporated: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy