TxDOT letting results, June 3, 2026
44 contracts let by Texas DOT on June 3, 2026, $340,782,804 in low bids, a median of 6.5 bidders per contract. On the 44 with an engineer's estimate, the low bid came in under it 36 times; median low bid -13% against the estimate.
- Owner
- Texas DOT
- Contracts
- 44
- Low bids, total
- $340,782,804
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00132662 | Widen Road - Add Lanes, IH 20 (FM 600 to SH 351) | Abilene District | 1 of 3 | FNF Construction, Inc. | $136,705,244 | +8.0% | TxDOT | ||
| A00063871 | Widen Road - Add Lanes, US 54 (KENWORTHY Street to FM 2529 (MCCOMBS Street)) | El Paso District | 4 | Jordan Foster Construction, LLC | $69,133,971 | $73,079,126 | +6.0% | -19% | TxDOT |
| A00062698 | Widen Road - Add Lanes, SH 123 (Cordova Ln. to IH 10) | San Antonio District | 6 | Jordan Foster Construction, LLC | $40,761,847 | $40,931,640 | 0.0% | -15% | TxDOT |
| A00191143 | Intersection Improvements With Right And/Or Left Turn Lanes, SH 29 (0.161 MI W OF WOLF RANCH PARKWAY to 0.075 MI W of IH-35 FR) | Austin District | 6 | Dan Williams Company | $7,574,102 | $7,831,553 | +3.0% | +3.0% | TxDOT |
| A00217752 | MILL AND INLAY, US0281 (IH-2 to US 281 Military Highway) | Pharr District | 3 | Ioc Company LLC | $6,198,303 | $6,214,082 | 0.0% | -9.0% | TxDOT |
| A00210421 | Rehabilitate Existing Roadway, FM 1884 (South of Fleet St to End of the State Maintenance) | Fort Worth District | 7 | Northeastern Pavers, LLC | $5,970,810 | $6,116,230 | +2.0% | -28% | TxDOT |
| A00220499 | FLEXIBLE PAVEMENT STRUCTURE REPAIR, US0380 (Various locations to Jack County) | Fort Worth District | 6 | Northeastern Pavers, LLC | $5,864,828 | $6,239,578 | +6.0% | 0.0% | TxDOT |
| A00215515 | Rehabilitate Existing Roadway, SS 380 (THREADNEEDLE ROAD, SOUTH to JIM GILLIGAN WAY) | Beaumont District | 4 | Texas Materials Group, Inc. | $4,771,697 | $5,689,672 | +19% | +2.0% | TxDOT |
| A00193590 | Hazard Elimination & Safety, FM 2820 (FM 79 to FM 38) | Paris District | 5 | Sammy Gist Enterprises, Inc. | $4,580,818 | $4,883,905 | +7.0% | -1.0% | TxDOT |
| A00206565 | Hazard Elimination & Safety, FM 227 (FM 2544 to 3.3 MILES EAST OF FM 2544) | Lufkin District | 9 | Pinto Construction Co., Inc. | $4,462,648 | $4,876,249 | +9.0% | -12% | TxDOT |
| A00186691 | Construct Pedestrian Infrastructure, SH 16 (SL 98 to Lehmann Dr.) | San Antonio District | 6 | STX Civil | $4,297,620 | $4,711,431 | +10% | -4.0% | TxDOT |
| A00220774 | MILL AND INLAY, US0079 (VARIOUS LOCATIONS IN GREGG, RUSK, to VAN ZANDT AND WOOD COUNTIES) | Tyler District | 4 | East Texas Bridge, Inc. | $4,217,863 | $4,266,307 | +1.0% | +6.0% | TxDOT |
| A00076951 | Highway Improvement, SH 70 (8 Miles North of US 82, South to US 82) | Childress District | 6 | A. L. Helmcamp, Inc. | $4,016,029 | $4,088,032 | +2.0% | +8.0% | TxDOT |
| A00140405 | Surfacing/Roadway Restoration, IH 69 (E of SS 529 to Harris C/L) | Houston District | 4 | Stripe Lines, Inc. | $3,174,124 | $4,188,679 | +32% | -49% | TxDOT |
| A00216480 | Resurface Roadway, FM 1640 (SS 529 to W of FM 2218) | Houston District | 5 | Durwood Greene Construction Co. | $3,065,936 | $3,397,769 | +11% | +7.0% | TxDOT |
| A00183477 | Bridge Replacement, ERIE ST (AT LNVA CANAL to STR#201240AA0336002) | Beaumont District | 4 | R Construction Civil, LLC | $3,062,119 | $3,296,888 | +8.0% | -5.0% | TxDOT |
| A00216795 | Bridge Maintenance, Various (Various to Various) | Waco District | 9 | The Truesdell Corporation | $3,058,058 | $3,352,693 | +10% | -13% | TxDOT |
| A00197666 | Install Illumination, IH 14 (Jasper Dr to Rosewood Dr) | Waco District | 11 | Highway Intelligent Traffic Solutions, Inc. | $2,981,026 | $3,000,000 | +1.0% | -21% | TxDOT |
| A00210173 | Bridge Maintenance, US 87 (1.95 mi south of FM 145 to On US 87) | Lubbock District | 9 | Pathfield Investments LLC | $2,742,796 | $2,868,974 | +5.0% | -12% | TxDOT |
| A00185405 | Bridge Replacement, FRANKFORD RD E (Frankford Rd WB AT Furneaux Creek to .) | Dallas District | 5 | Tucan Contracting, LLC | $2,342,967 | $2,400,102 | +2.0% | -6.0% | TxDOT |
| A00209326 | Repair Roadway, US 75 (Dallas County Line to Ridgeview Road) | Dallas District | 7 | Altus Construction LLC | $2,190,495 | $2,971,820 | +36% | -41% | TxDOT |
| A00206315 | Construct Pedestrian Infrastructure, Various (Various locations in City of Coleman to .) | Brownwood District | 4 | 3LW Civil LLC | $2,189,861 | $2,365,925 | +8.0% | -14% | TxDOT |
| A00193911 | Hazard Elimination & Safety, SH 249 (At Spring Cypress Rd to .) | Houston District | 10 | Deco Contractors, Inc. | $1,523,084 | $1,585,073 | +4.0% | -10% | TxDOT |
| A00219121 | Resurface Roadway, SS 341 (Bolliger Blvd to Scott St.) | Fort Worth District | 8 | Northeastern Pavers, LLC | $1,490,461 | $1,524,805 | +2.0% | -13% | TxDOT |
| A00210143 | BRIDGE PREVENTATIVE MAINTENANCE, US0060 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | Amarillo District | 10 | Gibson & Associates, Inc. | $1,256,310 | $1,384,913 | +10% | -27% | TxDOT |
| A00212313 | Landscape Development, Various (DISTRICTWIDE to .) | Beaumont District | 5 | Apex Landscape & Irrigation, LLC | $1,233,654 | $1,239,258 | 0.0% | -24% | TxDOT |
| A00219630 | REFLECTORIZED PAVEMENT MARKINGS & MARKERS, IH0035W (Various Locations In to North Tarrant County) | Fort Worth District | 3 | Stripe-A-Zone, LLC | $1,095,878 | $1,206,280 | +10% | -30% | TxDOT |
| A00220061 | SWEEPING AND DEBRIS REMOVAL, IH0045 (Various Roadways to Navarro County Maintenance Section) | Dallas District | 2 | Sweeping Corporation of America, LLC | $1,093,690 | $1,098,204 | 0.0% | -13% | TxDOT |
| A00193431 | Hazard Elimination & Safety, US 281 (SH 97 to FM 1334) | San Antonio District | 10 | E-Z Bel Construction, LLC | $1,035,228 | $1,080,671 | +4.0% | -12% | TxDOT |
| A00196413 | Purchase And Install Signs & Equip, Various (Districtwide Guide Signs FY 2026 to .) | San Antonio District | 11 | Rhino Equity, LLC | $919,419 | $1,002,695 | +9.0% | -11% | TxDOT |
| A00220390 | BRIDGE PREVENTATIVE MAINTENANCE, SH0008 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | Atlanta District | 11 | THK Construction LLC | $904,025 | $1,001,820 | +11% | -55% | TxDOT |
| A00190176 | Bridge Replacement, COUNTY ROAD 308 (AA03-08 Agua Dulce Creek to 1.10 MI S of FM 624) | Corpus Christi District | 8 | CK Newberry, LLC | $877,585 | $892,628 | +2.0% | -4.0% | TxDOT |
| A00211067 | Hazard Elimination & Safety, Various (Various locations to Cooke County) | Wichita Falls District | 12 | Je Casey, LLC | $847,122 | $1,109,480 | +31% | -35% | TxDOT |
| A00206486 | Hazard Elimination & Safety, FM 2220 (6 Mile Rd. to Harvard Ave.) | Pharr District | 7 | The Levy Company, Inc. | $837,743 | $892,585 | +7.0% | -17% | TxDOT |
| A00190949 | Bridge Replacement, LAZY F (0.1 Mi S of FM 883 to FM 883) | Corpus Christi District | 10 | J. Carroll Weaver, Inc. | $825,295 | $969,387 | +17% | -36% | TxDOT |
| A00213348 | Install Illumination, Various (VARIOUS LOCATIONS IN to TYLER DISTRICT) | Tyler District | 11 | Vaca Underground Utilities Inc | $565,281 | $596,416 | +6.0% | -22% | TxDOT |
| A00206853 | Construct Pedestrian Infrastructure, W FREDDY GONZALEZ DR (On Freddy Gonzalez Dr, from 9th St Ave to Closner Blvd.) | Pharr District | 7 | Castillo Aranda LLC | $493,025 | $570,328 | +16% | +10% | TxDOT |
| A00208955 | Bridge Maintenance, Various (@Various Locations to In Corpus Christi District) | Corpus Christi District | 9 | Relmco, Inc. | $478,473 | $497,452 | +4.0% | -7.0% | TxDOT |
| A00217765 | Landscape Development, Various (Various locations Districtwide to .) | Austin District | 6 | Tight Line Construction, LLC | $425,750 | $435,800 | +2.0% | -15% | TxDOT |
| A00206735 | Hazard Elimination & Safety, HARRIS BRANCH PKWY (at Giles Ln to .) | Austin District | 7 | E-Z Bel Construction, LLC | $405,662 | $449,983 | +11% | -21% | TxDOT |
| A00201414 | Bridge Maintenance, US 59 (At Morgan Creek to .) | Lufkin District | 2 | THK Construction LLC | $362,237 | $419,608 | +16% | -26% | TxDOT |
| A00206422 | Install Traffic Signal, Various (Various Locations to in the Town of Addison) | Dallas District | 5 | Elecnor Belco Electric, Inc. | $353,981 | $425,943 | +20% | -19% | TxDOT |
| A00197323 | Install/Replace Signs, Various (Various location in Travis County to .) | Austin District | 8 | Rhino Equity, LLC | $209,560 | $223,484 | +7.0% | -16% | TxDOT |
| A00214818 | Bridge Maintenance, SH 75 (At N Bedias Creek to .) | Bryan District | 7 | Jackson Excavation, LLC | $186,180 | $250,819 | +35% | -38% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.