TxDOT contract A00062698 bid tabulation
Widen Road - Add Lanes, SH 123 (Cordova Ln. to IH 10). Let by Texas DOT on June 3, 2026, Guadalupe, San Antonio District. 6 bids received; low bid $40,761,847 by Jordan Foster Construction, LLC, -15% against the engineer's estimate of $47,767,491.
- Owner
- Texas DOT
- Letting
- 03 JUN 2026
- Pay items
- 273
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jordan Foster Construction, LLC | $40,761,847 | Low | -15% |
| 2 | Webber, LLC | $40,931,640 | 0.0% | -14% |
| 3 | Hunter Industries, LTD. | $41,173,464 | +1.0% | -14% |
| 4 | Posillico Civil, Inc. | $41,964,087 | +3.0% | -12% |
| 5 | Joe Bland Construction LLC | $43,401,769 | +6.0% | -9.0% |
| 6 | Copasa Inc | $52,249,858 | +28% | +9.0% |
Engineer's estimate: $47,767,491.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Jordan Foster Construction, LLC | 2. Webber, LLC | 3. Hunter Industries, LTD. | 4. Posillico Civil, Inc. | 5. Joe Bland Construction LLC | 6. Copasa Inc |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 131 | $5,000.00 | $4,667.38 | $27,582 | $1,221.00 | $12,210 | $2,000.00 | $39,885 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 2,143 | $21.00 | $17.00 | $12.28 | $19.80 | $44.00 | $25.00 | $9.25 |
| 3 | Removing concrete (mowstrip) (104-7005) | LF | 1,542 | $15.00 | $7.00 | $10.82 | $13.20 | $4.50 | $12.00 | $8.33 |
| 4 | Removing concrete (riprap) (104-7006) | SY | 352 | $20.00 | $25.00 | $24.00 | $16.50 | $19.50 | $26.00 | $9.25 |
| 5 | Removing concrete (medians) (104-7008) | SY | 554 | $22.00 | $15.00 | $19.22 | $16.50 | $13.00 | $26.00 | $9.25 |
| 6 | Removing concrete (driveways) (104-7011) | SY | 4,349 | $23.00 | $25.00 | $16.79 | $16.50 | $12.00 | $28.00 | $9.25 |
| 7 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 1,507 | $22.00 | $10.00 | $15.34 | $16.50 | $17.00 | $26.00 | $9.25 |
| 8 | Removing concrete (curb) (104-7016) | LF | 1,729 | $11.00 | $1.00 | $5.45 | $9.90 | $9.00 | $8.00 | $9.25 |
| 9 | Remove (4"-8") TRT/untrt base & asphalt pavement (105-7004) | SY | 4,846 | $20.00 | $20.45 | $5.70 | $3.30 | $3.00 | $7.00 | $7.45 |
| 10 | Remove(12"-24") TRT/untrt base & asphalt pavement (105-7124) | SY | 84,794 | $22.00 | $8.50 | $6.87 | $12.10 | $3.00 | $9.00 | $12.64 |
| 11 | Excavation (roadway) (110-7001) | CY | 57,959 | $12.00 | $13.50 | $18.39 | $13.20 | $11.00 | $20.00 | $11.55 |
| 12 | Embankment (final)(DC)(type C1) (132-7008) | CY | 47,194 | $15.00 | $25.50 | $10.07 | $19.93 | $21.00 | $38.00 | $26.48 |
| 13 | Embankment (final)(OC)(type C2) (132-7009) | CY | 27,740 | $15.00 | $23.50 | $8.65 | $19.63 | $7.00 | $38.00 | $10.45 |
| 14 | Furn & place topsoil (4") (160-7002) | SY | 97,238 | $2.00 | $2.00 | $1.04 | $1.32 | $3.00 | $1.00 | $1.50 |
| 15 | Block sodding (162-7002) | SY | 97,238 | $6.00 | $4.00 | $3.96 | $4.41 | $4.00 | $4.00 | $3.37 |
| 16 | Drill seed (temporary_warm_cool) (164-7015) | SY | 119,791 | $0.25 | $0.10 | $0.10 | $0.15 | $0.10 | $0.25 | $0.22 |
| 17 | Fertilizer (166-7002) | TON | 11.10 | $1,275.00 | $680.00 | $661.35 | $1,417.79 | $661.00 | $750.00 | $750.00 |
| 18 | Vegetative watering (168-7001) | TGL | 3,645.60 | $10.00 | $25.00 | $24.43 | $23.10 | $38.00 | $5.00 | $36.00 |
| 19 | Proof rolling (216-7001) | HR | 286 | $85.00 | $103.00 | $79.61 | $66.00 | $146.00 | $20.00 | $95.00 |
| 20 | FL BS (compacted in place)(tyd GR1-2)(final pos) (247-7188) | CY | 30,452 | $60.00 | $60.00 | $50.29 | $53.13 | $67.00 | $35.00 | $74.44 |
| 21 | Lime (com or QK)(slurry) or QK(dry) (260-7001) | TON | 3,639 | $400.00 | $302.00 | $151.47 | $341.00 | $564.00 | $145.00 | $351.95 |
| 22 | Lime TRT (subgrade)(10") (260-7033) | SY | 121,310 | $5.00 | $3.00 | $2.58 | $4.40 | $5.00 | $8.00 | $6.26 |
| 23 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 23,216 | $4.50 | $2.85 | $2.83 | $4.95 | $3.00 | $3.00 | $2.80 |
| 24 | D-GR HMA type-B PG64-22 (341-7001) | TON | 60,514 | $80.00 | $80.00 | $76.89 | $87.45 | $72.00 | $85.00 | $78.50 |
| 25 | D-GR HMA type D PG76-22 (341-7056) | TON | 13,576 | $105.00 | $102.00 | $98.13 | $101.75 | $88.00 | $108.00 | $99.50 |
| 26 | Tack coat (341-7082) | GAL | 43,319 | $3.50 | $1.00 | $1.01 | $3.19 | $1.00 | $1.00 | $1.00 |
| 27 | SP mixes SP-C sac-B PG76-22 (344-7031) | TON | 17,380 | $100.00 | $92.00 | $88.52 | $100.65 | $91.00 | $98.00 | $90.00 |
| 28 | Plane & text asphalt concrete pavement(0" to 2") (354-7002) | SY | 2,766 | $3.25 | $3.05 | $6.28 | $3.52 | $4.00 | $3.50 | $3.00 |
| 29 | Concrete pavement (CRCP)(hes) (11") (360-7050) | SY | 2,179 | $180.00 | $126.00 | $119.79 | $120.00 | $96.00 | $130.00 | $110.00 |
| 30 | Struct excavation (400-7001) | CY | 7,500 | $25.00 | $15.00 | $3.00 | $10.50 | $2.00 | $1.00 | $13.55 |
| 31 | Cut & restore asphalt paving (400-7008) | SY | 168 | $300.00 | $105.00 | $292.36 | $95.00 | $194.00 | $145.00 | $161.50 |
| 32 | Cem stabil BKFL (400-7010) | CY | 4,798 | $110.00 | $161.00 | $156.27 | $194.25 | $142.00 | $140.00 | $176.00 |
| 33 | Trench excavation protection (402-7001) | LF | 929 | $30.00 | $3.00 | $12.40 | $26.25 | $3.00 | $3.00 | $50.00 |
| 34 | Temporary special shoring (403-7001) | SF | 809 | $28.00 | $33.00 | $46.00 | $36.75 | $27.00 | $85.00 | $45.00 |
| 35 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 104 | $450.00 | $370.00 | $305.00 | $320.25 | $309.00 | $540.00 | $305.00 |
| 36 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 88 | $750.00 | $550.00 | $415.00 | $435.75 | $421.00 | $675.00 | $415.00 |
| 37 | Class C concrete (rail foundation) (420-7052) | CY | 21 | $540.00 | $650.00 | $832.09 | $500.00 | $1,121.00 | $940.00 | $1,200.00 |
| 38 | Riprap (concrete)(5 in) (432-7002) | CY | 1,990 | $580.00 | $440.00 | $437.10 | $435.28 | $260.00 | $365.00 | $510.00 |
| 39 | Rail (type C221) (450-7032) | LF | 693 | $165.00 | $160.00 | $176.85 | $170.00 | $200.00 | $145.00 | $85.45 |
| 40 | Rail (handrail)(type F) (450-7063) | LF | 7,646 | $155.00 | $145.00 | $142.88 | $150.02 | $108.00 | $170.00 | $184.55 |
| 41 | Concrete box culvert (4 FT X 2 FT) (462-7003) | LF | 98 | $475.00 | $310.00 | $269.88 | $383.25 | $454.00 | $350.00 | $547.13 |
| 42 | Concrete box culvert (6 FT X 2 FT) (462-7010) | LF | 1,224 | $600.00 | $440.00 | $371.34 | $551.25 | $700.00 | $515.00 | $556.09 |
| 43 | Concrete box culvert (6 FT X 3 FT) (462-7011) | LF | 1,078 | $560.00 | $530.00 | $443.42 | $598.50 | $811.00 | $575.00 | $747.33 |
| 44 | Concrete box culvert (7 FT X 3 FT) (462-7015) | LF | 813 | $600.00 | $590.00 | $591.99 | $727.65 | $1,032.00 | $695.00 | $849.08 |
| 45 | Concrete box culvert (8 FT X 3 FT) (462-7020) | LF | 203 | $620.00 | $690.00 | $661.11 | $826.35 | $1,093.00 | $775.00 | $920.58 |
| 46 | Concrete box culvert (8 FT X 4 FT) (462-7021) | LF | 520 | $700.00 | $690.00 | $686.78 | $882.00 | $1,192.00 | $550.00 | $960.18 |
| 47 | RC pipe (CL III)(18 in) (464-7003) | LF | 160 | $80.00 | $100.00 | $110.51 | $68.25 | $115.00 | $90.00 | $107.28 |
| 48 | RC pipe (CL III)(24 in) (464-7005) | LF | 2,333 | $110.00 | $110.00 | $105.61 | $89.25 | $131.00 | $110.00 | $119.93 |
| 49 | RC pipe (arch)(CL III)(des 1) (464-7040) | LF | 100 | $225.00 | $180.00 | $304.05 | $304.50 | $251.00 | $180.00 | $197.48 |
| 50 | Inlet (complete)(pco)(3FT)(none) (465-7013) | EACH | 3 | $9,000.00 | $9,500.00 | $9,071.79 | $5,927.23 | $10,138 | $4,000.00 | $8,310.00 |
| 51 | Inlet (complete)(pco)(3FT)(left) (465-7014) | EACH | 1 | $6,200.00 | $10,000 | $8,597.23 | $5,879.98 | $11,521 | $5,000.00 | $9,530.00 |
| 52 | Inlet (complete)(PSL)(RC)(6FTX6FT) (465-7076) | EACH | 1 | $15,000 | $14,000 | $10,236 | $11,812 | $19,541 | $8,250.00 | $10,500 |
| 53 | Inlet (complete)(wall) (465-7373) | EACH | 2 | $14,000 | $14,100 | $10,500 | $8,399.97 | $42,924 | $22,500 | $12,700 |
| 54 | Inlet (complete)(type sidewalk bridge)(mod) (465-7374) | EACH | 98 | $21,000 | $15,600 | $11,500 | $15,000 | $15,750 | $1,000.00 | $16,500 |
| 55 | Wingwall (PW - 1) (HW=6 FT) (466-7176) | EACH | 2 | $20,500 | $27,000 | $22,742 | $18,414 | $37,214 | $22,500 | $47,320 |
| 56 | Wingwall (PW - 1) (HW=7 FT) (466-7177) | EACH | 2 | $35,400 | $31,000 | $24,742 | $23,926 | $48,616 | $31,250 | $47,320 |
| 57 | Wingwall (PW - 1) (HW=8 FT) (466-7178) | EACH | 4 | $30,000 | $44,000 | $38,904 | $34,868 | $63,711 | $48,000 | $48,320 |
| 58 | Wingwall (PW - 1) (HW=9 FT) (466-7179) | EACH | 1 | $40,000 | $44,000 | $40,904 | $46,252 | $79,975 | $61,000 | $49,320 |
| 59 | Set (type I)(S= 4 FT)(HW= 3 FT)(6:1)(P) (467-7070) | EACH | 2 | $10,000 | $13,000 | $14,258 | $4,724.98 | $16,816 | $7,500.00 | $9,860.00 |
| 60 | Set (type I)(S= 6 FT)(HW= 3 FT)(6:1)(P) (467-7127) | EACH | 5 | $13,000 | $13,500 | $13,471 | $6,824.98 | $19,233 | $9,000.00 | $12,195 |
| 61 | Set (type I)(S= 6 FT)(HW= 4 FT)(6:1)(P) (467-7131) | EACH | 26 | $17,000 | $14,000 | $16,390 | $8,294.97 | $21,050 | $13,500 | $15,638 |
| 62 | Set (type II) (des 1) (RCP) (6: 1) (P) (467-7418) | EACH | 4 | $4,350.00 | $2,200.00 | $2,663.11 | $3,044.99 | $2,815.00 | $4,000.00 | $3,456.00 |
| 63 | Set (type II)(18 in)(RCP)(3:1)(P) (467-7467) | EACH | 4 | $1,800.00 | $2,000.00 | $2,257.96 | $1,574.99 | $2,407.00 | $2,000.00 | $1,902.57 |
| 64 | Set(type II)(24 in)(RCP)(4:1)(P) (467-7468) | EACH | 68 | $1,400.00 | $1,670.00 | $1,941.69 | $1,984.49 | $2,815.00 | $2,500.00 | $2,620.87 |
| 65 | Clean existing culverts (480-7001) | EACH | 1 | $5,000.00 | $8,000.00 | $2,888.01 | $2,519.99 | $711.00 | $3,500.00 | $4,451.00 |
| 66 | Removing structure (set) (496-7004) | EACH | 54 | $257.00 | $830.00 | $670.20 | $525.00 | $607.00 | $750.00 | $1,129.50 |
| 67 | Removing structure (wingwall) (496-7005) | EACH | 7 | $1,500.00 | $2,800.00 | $1,492.85 | $1,312.50 | $2,061.00 | $2,250.00 | $4,453.00 |
| 68 | Removing structure (headwall) (496-7006) | EACH | 2 | $2,100.00 | $2,500.00 | $1,492.85 | $1,312.50 | $3,469.00 | $2,000.00 | $4,454.00 |
| 69 | Removing structure (pipe) (496-7007) | LF | 1,145 | $15.00 | $25.00 | $26.57 | $10.50 | $21.00 | $35.00 | $47.15 |
| 70 | Removing structure (box culvert) (496-7008) | LF | 1,897 | $100.00 | $44.00 | $43.62 | $33.60 | $36.00 | $50.00 | $48.15 |
| 71 | Mobilization (500-7001) | LS | 1 | $4,312,377 | $4,010,885 | $4,025,000 | $3,947,922 | $4,000,000 | $825,000 | $5,224,989 |
| 72 | Barricades, signs and traffic handling (502-7001) | MO | 32 | $10,000 | $7,000.00 | $25,000 | $8,329.58 | $14,098 | $7,500.00 | $76,000 |
| 73 | Portable changeable message sign (503-7002) | EACH | 5 | $10,000 | $3,000.00 | $9,495.51 | $3,715.49 | $43,638 | $12,000 | $12,500 |
| 74 | TMA (stationary) (505-7001) | DAY | 97 | $475.00 | $300.00 | $281.00 | $132.70 | $275.00 | $215.00 | $250.00 |
| 75 | TMA (mobile operation) (505-7002) | HR | 32 | $45.00 | $75.00 | $82.13 | $79.62 | $63.00 | $1,125.00 | $500.00 |
| 76 | Rock filter dams (install) (type 1) (506-7001) | LF | 265 | $35.00 | $39.00 | $38.45 | $30.38 | $38.00 | $45.00 | $48.90 |
| 77 | Rock filter dams (install) (type 3) (506-7003) | LF | 40 | $81.00 | $111.00 | $107.79 | $96.21 | $107.00 | $120.00 | $137.50 |
| 78 | Rock filter dams (remove) (506-7011) | LF | 305 | $13.00 | $19.50 | $18.83 | $10.13 | $19.00 | $20.00 | $16.65 |
| 79 | Construction exits (install) (type 1) (506-7020) | SY | 1,906 | $30.00 | $38.00 | $37.31 | $24.30 | $37.00 | $45.00 | $31.54 |
| 80 | Construction exits (remove) (506-7024) | SY | 1,786 | $3.25 | $9.45 | $9.20 | $7.09 | $9.00 | $10.00 | $4.90 |
| 81 | Temporary sediment control fence (install) (506-7039) | LF | 24,703 | $3.00 | $3.90 | $3.79 | $2.94 | $3.00 | $5.00 | $3.96 |
| 82 | Temporary sediment control fence (remove) (506-7041) | LF | 24,703 | $1.00 | $0.74 | $0.72 | $0.30 | $1.00 | $1.00 | $1.46 |
| 83 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 2,242 | $6.00 | $5.65 | $5.52 | $4.05 | $5.00 | $7.00 | $9.70 |
| 84 | Biodegradable erosion control logs (remove) (506-7046) | LF | 2,222 | $1.25 | $0.84 | $0.82 | $0.71 | $1.00 | $1.00 | $2.75 |
| 85 | Constructing detours (508-7001) | SY | 11,519 | $95.00 | $67.00 | $52.00 | $70.19 | $59.00 | $60.00 | $102.22 |
| 86 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 4,840 | $30.00 | $28.00 | $13.25 | $20.00 | $70.00 | $85.00 | $41.85 |
| 87 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 280 | $40.00 | $76.00 | $71.85 | $25.00 | $72.00 | $75.00 | $42.90 |
| 88 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 21,120 | $5.00 | $5.00 | $8.69 | $9.00 | $11.00 | $15.00 | $11.85 |
| 89 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 1,440 | $12.00 | $17.00 | $23.71 | $10.00 | $13.00 | $35.00 | $12.90 |
| 90 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 4,660 | $11.00 | $9.00 | $9.41 | $10.00 | $25.00 | $25.00 | $11.85 |
| 91 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 240 | $12.00 | $20.00 | $13.36 | $10.00 | $41.00 | $25.00 | $12.90 |
| 92 | Colored textured concrete (4") (527-7001) | SY | 30,894 | $110.00 | $57.00 | $67.50 | $73.45 | $34.00 | $65.00 | $86.21 |
| 93 | Concrete curb (type F3) (529-7022) | LF | 33 | $185.00 | $390.00 | $300.00 | $163.23 | $357.00 | $475.00 | $255.00 |
| 94 | Concrete curb (type I) (mod) (529-7029) | LF | 50,147 | $45.00 | $11.75 | $13.95 | $14.69 | $13.00 | $23.00 | $11.60 |
| 95 | Concrete curb (type II)(mod) (529-7035) | LF | 195 | $55.00 | $24.00 | $22.50 | $14.69 | $20.00 | $25.00 | $24.00 |
| 96 | Driveways (concrete) (hes) (530-7007) | SY | 2,729 | $135.00 | $85.00 | $86.05 | $81.61 | $100.00 | $135.00 | $123.25 |
| 97 | Driveways (ACP) (type 2) (530-7012) | SY | 4,447 | $55.00 | $65.00 | $63.09 | $48.40 | $69.00 | $70.00 | $110.00 |
| 98 | Concrete sidewalks (4") (531-7001) | SY | 24,858 | $70.00 | $55.00 | $52.05 | $51.69 | $42.00 | $60.00 | $52.55 |
| 99 | Curb ramps (type 1) (531-7005) | EACH | 4 | $2,500.00 | $2,900.00 | $2,975.00 | $3,155.77 | $3,882.00 | $2,000.00 | $1,200.00 |
| 100 | Curb ramps (type 2) (531-7006) | EACH | 11 | $2,800.00 | $2,900.00 | $2,825.00 | $3,155.77 | $3,890.00 | $2,250.00 | $3,985.00 |
| 101 | Curb ramps (type 3) (531-7007) | EACH | 18 | $3,900.00 | $2,900.00 | $3,000.00 | $3,155.77 | $3,956.00 | $2,500.00 | $4,510.00 |
| 102 | Curb ramps (type 5) (531-7008) | EACH | 6 | $3,575.00 | $2,900.00 | $2,905.00 | $3,155.77 | $3,954.00 | $3,500.00 | $6,250.00 |
| 103 | Curb ramps (type 7) (531-7010) | EACH | 4 | $2,500.00 | $2,900.00 | $2,915.00 | $3,155.77 | $3,957.00 | $3,500.00 | $3,510.00 |
| 104 | Curb ramps (type 10) (531-7011) | EACH | 6 | $2,200.00 | $2,900.00 | $3,050.00 | $3,155.77 | $3,954.00 | $4,500.00 | $4,310.00 |
| 105 | Curb ramps (type 21) (531-7013) | EACH | 4 | $3,500.00 | $5,300.00 | $3,100.00 | $3,155.77 | $4,308.00 | $4,500.00 | $3,250.00 |
| 106 | Curb ramps (type 22) (531-7014) | EACH | 1 | $3,200.00 | $9,200.00 | $3,900.00 | $3,155.77 | $4,686.00 | $4,500.00 | $6,825.00 |
| 107 | Remove metal beam guard fence (542-7001) | LF | 1,537.50 | $5.00 | $3.15 | $3.00 | $3.19 | $7.00 | $2.00 | $3.00 |
| 108 | Remove terminal anchor section (542-7002) | EACH | 1 | $220.00 | $230.00 | $300.00 | $318.73 | $498.00 | $115.00 | $220.00 |
| 109 | Guardrail end treatment (remove) (544-7003) | EACH | 9 | $350.00 | $350.00 | $275.00 | $292.17 | $746.00 | $175.00 | $330.00 |
| 110 | Chain link fence (install) (6') (550-7001) | LF | 38 | $30.00 | $60.00 | $75.00 | $61.09 | $130.00 | $65.00 | $57.50 |
| 111 | Gate (remove) (550-7016) | EACH | 1 | $1,000.00 | $460.00 | $250.00 | $467.47 | $995.00 | $2,000.00 | $440.00 |
| 112 | Gate (install)(6'X24') (550-7018) | EACH | 1 | $10,000 | $2,900.00 | $15,000 | $2,958.87 | $6,300.00 | $4,000.00 | $2,785.00 |
| 113 | Mailbox install-S (TWG-post) type 4 (560-7013) | EACH | 10 | $250.00 | $410.00 | $249.00 | $225.00 | $388.00 | $500.00 | $320.08 |
| 114 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 2,325 | $20.00 | $14.50 | $12.00 | $12.00 | $12.00 | $22.00 | $12.00 |
| 115 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 4,135 | $30.00 | $22.00 | $15.00 | $15.00 | $15.00 | $28.00 | $15.00 |
| 116 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 1,320 | $30.00 | $17.50 | $13.00 | $13.00 | $13.00 | $30.00 | $13.00 |
| 117 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 4,710 | $35.00 | $24.00 | $20.00 | $20.00 | $20.00 | $34.00 | $20.00 |
| 118 | Electrical conductor (no.6) bare (620-7009) | LF | 12,490 | $2.50 | $2.40 | $1.90 | $1.90 | $2.00 | $3.00 | $1.90 |
| 119 | Electrical conductor (no.6) insulated (620-7010) | LF | 650 | $3.00 | $2.75 | $2.15 | $2.15 | $2.00 | $3.50 | $2.15 |
| 120 | Tray cable (4 conductor) (12 AWG) (621-7006) | LF | 3,275 | $3.50 | $3.50 | $3.20 | $3.20 | $3.00 | $3.50 | $3.20 |
| 121 | Ground box type D (162922) (624-7007) | EACH | 22 | $1,500.00 | $1,320.00 | $1,000.00 | $1,000.00 | $1,014.00 | $1,500.00 | $1,000.00 |
| 122 | Ground box type D (162922)W/apron (624-7008) | EACH | 3 | $1,800.00 | $1,760.00 | $1,100.00 | $1,100.00 | $1,115.00 | $2,000.00 | $1,100.00 |
| 123 | Remove electrical services (628-7002) | EACH | 3 | $600.00 | $450.00 | $545.00 | $545.00 | $553.00 | $415.00 | $545.00 |
| 124 | Elc SRV type D 120/240 070(NS)AL(E)SP(O) (628-7169) | EACH | 3 | $8,000.00 | $8,200.00 | $6,500.00 | $6,500.00 | $6,591.00 | $10,650 | $6,500.00 |
| 125 | Aluminum signs (type A) (636-7001) | SF | 265.25 | $35.00 | $45.00 | $30.00 | $30.00 | $30.00 | $50.00 | $30.00 |
| 126 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 47 | $700.00 | $730.00 | $700.00 | $650.00 | $781.00 | $845.00 | $645.00 |
| 127 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 1 | $900.00 | $780.00 | $750.00 | $700.00 | $963.00 | $1,025.00 | $795.00 |
| 128 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 79 | $900.00 | $800.00 | $775.00 | $750.00 | $963.00 | $1,075.00 | $795.00 |
| 129 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 19 | $900.00 | $1,010.00 | $975.00 | $800.00 | $1,211.00 | $1,125.00 | $1,000.00 |
| 130 | Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025) | EACH | 4 | $950.00 | $730.00 | $700.00 | $915.00 | $1,235.00 | $1,250.00 | $1,020.00 |
| 131 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 15 | $975.00 | $830.00 | $800.00 | $920.00 | $1,259.00 | $1,275.00 | $1,040.00 |
| 132 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 6 | $1,200.00 | $930.00 | $900.00 | $950.00 | $1,525.00 | $1,500.00 | $1,260.00 |
| 133 | Install small roadside sign support and assembly TYS80(1)SA(U-1EXT) (644-7032) | EACH | 2 | $1,200.00 | $1,040.00 | $1,000.00 | $1,000.00 | $1,501.00 | $1,500.00 | $1,240.00 |
| 134 | Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034) | EACH | 6 | $1,300.00 | $1,140.00 | $1,100.00 | $1,200.00 | $1,653.00 | $1,575.00 | $1,365.00 |
| 135 | Install small roadside sign support and assembly TYS80(2)SA(P-exal) (644-7049) | EACH | 4 | $1,960.00 | $2,600.00 | $2,500.00 | $1,500.00 | $2,730.00 | $2,425.00 | $2,255.00 |
| 136 | Remove SM RD SN sup&AM (644-7073) | EACH | 77 | $100.00 | $93.00 | $90.00 | $100.00 | $121.00 | $100.00 | $100.00 |
| 137 | Remove lrsa (647-7003) | EACH | 1 | $950.00 | $660.00 | $1,190.51 | $500.00 | $890.00 | $785.00 | $500.00 |
| 138 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 33 | $90.00 | $104.00 | $100.00 | $65.00 | $137.00 | $80.00 | $64.00 |
| 139 | Remove delin & object marker assms (658-7078) | EACH | 38 | $20.00 | $5.20 | $5.00 | $15.00 | $39.00 | $25.00 | $18.00 |
| 140 | Inst delineator assembly (D-SY)SZ 1(yflx)SRFHH(BI) (658-7127) | EACH | 8 | $80.00 | $130.00 | $125.00 | $150.00 | $343.00 | $175.00 | $160.00 |
| 141 | Install delineator assembly (D-DY)SZ 1(yflx)SRFLL (658-7147) | EACH | 23 | $100.00 | $130.00 | $125.00 | $75.00 | $193.00 | $90.00 | $90.00 |
| 142 | Install OM SM RD sign (1-OM-PW)Y (658-7317) | EACH | 137 | $10.00 | $52.00 | $50.00 | $20.00 | $75.00 | $35.00 | $35.00 |
| 143 | Install OM SM RD sign (1-OM-PW)R (658-7318) | EACH | 42 | $10.00 | $52.00 | $50.00 | $20.00 | $75.00 | $40.00 | $35.00 |
| 144 | Install OM SM RD sign (2-OM-PW)Y (658-7319) | EACH | 4 | $4.00 | $104.00 | $100.00 | $25.00 | $9.00 | $1.25 | $41.00 |
| 145 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 4,970 | $1.00 | $1.05 | $0.95 | $1.00 | $1.00 | $2.50 | $0.95 |
| 146 | Work zone pavement marking removing (W)6"(DOT) (662-7066) | LF | 83 | $1.00 | $2.10 | $1.90 | $2.00 | $2.00 | $2.50 | $1.90 |
| 147 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 95,040 | $1.00 | $0.80 | $0.70 | $0.77 | $1.00 | $1.00 | $0.70 |
| 148 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 1,429 | $7.00 | $8.35 | $4.00 | $8.00 | $4.00 | $9.00 | $4.00 |
| 149 | Work zone pavement marking removing (Y)6"(DOT) (662-7099) | LF | 81 | $2.00 | $2.10 | $1.90 | $2.00 | $2.00 | $2.50 | $1.90 |
| 150 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 61,589 | $1.00 | $0.80 | $0.70 | $0.77 | $1.00 | $1.00 | $0.70 |
| 151 | Work zone pavement marking removing (Y)24"(solid) (662-7105) | LF | 157 | $12.00 | $8.35 | $4.00 | $8.00 | $4.00 | $9.00 | $4.00 |
| 152 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 135 | $1.20 | $2.10 | $1.60 | $2.00 | $2.00 | $2.50 | $1.60 |
| 153 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 24 | $1.50 | $2.10 | $1.80 | $2.00 | $2.00 | $2.50 | $1.80 |
| 154 | Reflectorized pavement marking type I (W)8"(lane drop)(100MIL) (666-7021) | LF | 407 | $2.00 | $2.10 | $0.75 | $2.00 | $1.00 | $2.50 | $0.75 |
| 155 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 15,226 | $1.00 | $0.94 | $0.90 | $0.90 | $1.00 | $1.00 | $0.90 |
| 156 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 98 | $3.25 | $3.65 | $3.70 | $3.50 | $4.00 | $4.00 | $3.70 |
| 157 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 3,734 | $7.00 | $7.05 | $7.50 | $6.75 | $8.00 | $8.00 | $7.50 |
| 158 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 61 | $150.00 | $182.00 | $150.00 | $175.00 | $150.00 | $195.00 | $150.00 |
| 159 | Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045) | EACH | 3 | $200.00 | $260.00 | $190.00 | $250.00 | $190.00 | $285.00 | $190.00 |
| 160 | Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051) | EACH | 4 | $250.00 | $260.00 | $195.00 | $250.00 | $195.00 | $280.00 | $195.00 |
| 161 | Reflectorized pavement marking type I(W)(U-LT arrow)(100 mil) (666-7054) | EACH | 4 | $250.00 | $310.00 | $200.00 | $300.00 | $200.00 | $335.00 | $200.00 |
| 162 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 68 | $175.00 | $210.00 | $160.00 | $200.00 | $160.00 | $225.00 | $160.00 |
| 163 | Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123) | LF | 185 | $7.00 | $7.05 | $7.50 | $6.75 | $8.00 | $8.00 | $7.50 |
| 164 | Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132) | EACH | 1 | $350.00 | $570.00 | $250.00 | $550.00 | $250.00 | $625.00 | $250.00 |
| 165 | Pavement sler 6" (666-7347) | LF | 64,509 | $0.20 | $0.20 | $0.20 | $0.19 | $0.25 | $0.25 | $0.20 |
| 166 | Pavement sler 8" (666-7348) | LF | 15,657 | $0.25 | $0.26 | $0.40 | $0.25 | $1.00 | $0.30 | $0.40 |
| 167 | Pavement sler 12" (666-7350) | LF | 98 | $1.00 | $1.05 | $1.35 | $1.00 | $1.00 | $1.25 | $1.35 |
| 168 | Pavement sler 24" (666-7352) | LF | 3,919 | $1.30 | $2.10 | $2.65 | $2.00 | $3.00 | $2.50 | $2.65 |
| 169 | Pavement sler (arrow) (666-7353) | EACH | 61 | $15.00 | $52.00 | $80.00 | $50.00 | $80.00 | $55.00 | $80.00 |
| 170 | Pavement sler (word) (666-7354) | EACH | 68 | $15.00 | $52.00 | $95.00 | $50.00 | $95.00 | $55.00 | $95.00 |
| 171 | Pavement sler (med nose) (666-7355) | EACH | 1 | $50.00 | $52.00 | $110.00 | $50.00 | $110.43 | $55.00 | $110.00 |
| 172 | Pavement sler (double arrow) (666-7356) | EACH | 3 | $20.00 | $52.00 | $80.00 | $50.00 | $80.00 | $55.00 | $80.00 |
| 173 | Pavement sler (uturn arrow) (666-7358) | EACH | 4 | $20.00 | $52.00 | $110.00 | $50.00 | $110.00 | $55.00 | $110.00 |
| 174 | Pavement sler (U-L arrow) (666-7360) | EACH | 4 | $20.00 | $52.00 | $110.00 | $50.00 | $110.00 | $55.00 | $110.00 |
| 175 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 6,670 | $0.60 | $0.68 | $0.70 | $0.65 | $1.00 | $1.00 | $0.70 |
| 176 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 27,293 | $0.60 | $0.68 | $0.63 | $0.65 | $1.00 | $1.00 | $0.63 |
| 177 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 30,411 | $0.60 | $0.68 | $0.63 | $0.65 | $1.00 | $1.00 | $0.63 |
| 178 | Reflectorized pavement marker type I-C (672-7002) | EACH | 36 | $4.00 | $4.45 | $4.25 | $4.25 | $4.00 | $5.00 | $4.25 |
| 179 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 263 | $4.00 | $4.45 | $4.25 | $4.25 | $4.00 | $5.00 | $4.25 |
| 180 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 1,094 | $4.00 | $4.45 | $4.25 | $4.25 | $4.00 | $5.00 | $4.25 |
| 181 | Eliminating existing PM & markers (6") (677-7002) | LF | 17,400 | $0.20 | $0.47 | $0.60 | $0.45 | $1.00 | $0.50 | $0.60 |
| 182 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 2 | $100.00 | $210.00 | $40.00 | $200.00 | $40.00 | $225.00 | $40.00 |
| 183 | Install highway traffic signal (isolated) (680-7002) | EACH | 3 | $40,000 | $35,000 | $39,600 | $39,600 | $40,153 | $28,150 | $39,600 |
| 184 | Removing traffic signals (680-7004) | EACH | 3 | $6,500.00 | $4,400.00 | $6,700.00 | $6,700.00 | $6,794.00 | $10,000 | $6,700.00 |
| 185 | Temporary traffic signals (681-7001) | EACH | 3 | $60,000 | $112,000 | $71,725 | $71,725 | $72,726 | $175,000 | $71,725 |
| 186 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 33 | $300.00 | $350.00 | $265.00 | $265.00 | $269.00 | $395.00 | $265.00 |
| 187 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 13 | $300.00 | $350.00 | $265.00 | $265.00 | $269.00 | $395.00 | $265.00 |
| 188 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 33 | $300.00 | $350.00 | $265.00 | $265.00 | $269.00 | $395.00 | $265.00 |
| 189 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 7 | $300.00 | $350.00 | $265.00 | $265.00 | $269.00 | $395.00 | $265.00 |
| 190 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 33 | $300.00 | $350.00 | $265.00 | $265.00 | $269.00 | $395.00 | $265.00 |
| 191 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 7 | $300.00 | $350.00 | $265.00 | $265.00 | $269.00 | $395.00 | $265.00 |
| 192 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 30 | $900.00 | $860.00 | $660.00 | $660.00 | $669.00 | $815.00 | $660.00 |
| 193 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 34 | $250.00 | $187.00 | $150.00 | $150.00 | $152.00 | $170.00 | $150.00 |
| 194 | Backplate W/ref border(4 sec)(vent)aluminum (682-7043) | EACH | 6 | $300.00 | $260.00 | $215.00 | $215.00 | $218.00 | $225.00 | $215.00 |
| 195 | Traffic signal CBL (type A)(12 AWG)(4 conductor) (684-7009) | LF | 6,540 | $2.75 | $3.30 | $2.65 | $2.65 | $3.00 | $4.00 | $2.65 |
| 196 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 6,500 | $3.50 | $4.70 | $3.80 | $3.80 | $4.00 | $5.00 | $3.80 |
| 197 | Traffic signal CBL (type C)(14 AWG)(2 conductor) (684-7080) | LF | 6,380 | $2.00 | $1.75 | $1.70 | $1.70 | $2.00 | $2.50 | $1.70 |
| 198 | Remove RDSD flash beacon assembly (685-7003) | EACH | 3 | $700.00 | $340.00 | $756.00 | $583.51 | $335.00 | $900.00 | $310.00 |
| 199 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 1 | $16,000 | $16,700 | $14,400 | $14,400 | $14,601 | $18,000 | $14,400 |
| 200 | Ins traffic signal PL AM(S)1 arm(48')lum (686-7051) | EACH | 7 | $17,000 | $17,300 | $15,100 | $15,100 | $15,311 | $18,000 | $15,100 |
| 201 | Ins traffic signal PL AM(S)1 arm(55')lum (686-7059) | EACH | 3 | $38,000 | $42,000 | $36,900 | $36,900 | $37,415 | $42,750 | $36,900 |
| 202 | Ins traffic signal PL AM(S)1 arm(65')lum (686-7067) | EACH | 1 | $42,000 | $44,000 | $38,500 | $3,800.00 | $39,038 | $45,000 | $38,500 |
| 203 | Pedestrian pole assembly (687-7001) | EACH | 29 | $2,600.00 | $2,700.00 | $2,500.00 | $2,500.00 | $2,535.00 | $45,000 | $2,500.00 |
| 204 | Pedestrian detect push button (APS) (688-7001) | EACH | 30 | $1,100.00 | $990.00 | $1,100.00 | $1,100.00 | $1,115.00 | $2,800.00 | $1,100.00 |
| 205 | Pedestrian detector controller unit (688-7003) | EACH | 3 | $3,150.00 | $3,700.00 | $4,500.00 | $4,500.00 | $4,563.00 | $1,125.00 | $4,500.00 |
| 206 | Removal of pedestrian ramps (690-7057) | EACH | 6 | $600.00 | $950.00 | $1,050.00 | $500.00 | $953.00 | $4,050.00 | $1,500.00 |
| 207 | Install fused disconnect (690-7203) | EACH | 1 | $1,200.00 | $3,600.00 | $665.00 | $698.25 | $675.00 | $1,400.00 | $665.00 |
| 208 | Full - width mowing (730-7019) | CYC | 11 | $6,500.00 | $3,800.00 | $2,250.00 | $6,000.00 | $5,310.00 | $2,000.00 | $4,500.00 |
| 209 | Litter removal (734-7002) | CYC | 66 | $3,000.00 | $1,070.00 | $850.00 | $850.00 | $2,000.00 | $7,325.00 | $500.00 |
| 210 | Debris removing-CNTR med/MN LNS/ramps (735-7002) | CYC | 66 | $1,000.00 | $2,100.00 | $1,000.00 | $850.00 | $2,000.00 | $7,825.00 | $500.00 |
| 211 | Cleaning / sweeping (center median) (738-7004) | CYC | 33 | $185.00 | $3,200.00 | $1,200.00 | $1,000.00 | $4,228.00 | $7,825.00 | $1,500.00 |
| 212 | Tied-concrete block erosion control mat (2005-7001) | SF | 9,328 | $11.00 | $10.00 | $9.20 | $18.23 | $12.00 | $5.00 | $5.00 |
| 213 | Underseal course (3006-7001) | GAL | 40,421 | $2.00 | $1.00 | $1.01 | $3.52 | $2.00 | $5.00 | $1.00 |
| 214 | Bonding course (3007-7001) | GAL | 6,011 | $3.00 | $1.00 | $1.01 | $3.19 | $1.00 | $1.00 | $1.00 |
| 215 | Install bridge identification numbers (4019-7001) | EACH | 5 | $480.00 | $440.00 | $546.17 | $2,000.00 | $500.00 | $1.00 | $500.00 |
| 216 | RVDS (presence detection only) (6008-7001) | EACH | 12 | $9,500.00 | $5,700.00 | $11,405 | $11,405 | $11,564 | $285.00 | $11,405 |
| 217 | RVDS (advance detection only) (6008-7002) | EACH | 9 | $10,000 | $5,700.00 | $8,650.00 | $8,650.00 | $8,771.00 | $12,500 | $8,650.00 |
| 218 | CCTV field equip (digital) (install only) (6018-7001) | EACH | 3 | $1,500.00 | $770.00 | $500.00 | $500.00 | $507.00 | $9,500.00 | $500.00 |
| 219 | ITS com CBL (ethernet) (6018-7004) | LF | 960 | $3.50 | $1.45 | $1.70 | $1.70 | $2.00 | $1,500.00 | $1.70 |
| 220 | Split steel casing (14") (7084-7001) | LF | 204 | $300.00 | $330.00 | $198.00 | $306.00 | $198.00 | $2.50 | $306.00 |
| 221 | Split steel casing (24") (7084-7002) | LF | 38 | $340.00 | $440.00 | $279.50 | $417.00 | $280.00 | $260.00 | $417.00 |
| 222 | Force main (PVC)(16") (7084-7003) | LF | 38 | $120.00 | $600.00 | $608.00 | $559.00 | $608.00 | $310.00 | $559.00 |
| 223 | Tie-in (complete)(16") (7084-7004) | EACH | 2 | $2,944.00 | $9,100.00 | $8,671.00 | $8,542.00 | $8,671.00 | $100.00 | $8,542.00 |
| 224 | San SWR SM diameter byp pumping (forcemain) (7084-7005) | LS | 1 | $40,000 | $485,000 | $36,485 | $455,600 | $72,970 | $5,250.00 | $455,600 |
| 225 | San SWR (jack, bore, or tunnel)(30") (7084-7006) | LF | 211 | $400.00 | $750.00 | $727.50 | $701.00 | $728.00 | $6,000.00 | $701.00 |
| 226 | San SWR removal of 8" sewer line (7084-7007) | LF | 154 | $26.00 | $32.00 | $37.50 | $30.00 | $38.00 | $1,150.00 | $30.00 |
| 227 | San SWR removal of 16" sewer line (7084-7008) | LF | 225 | $30.00 | $32.00 | $39.50 | $30.00 | $40.00 | $25.00 | $30.00 |
| 228 | San SWR removal of 8" force main line (7084-7009) | LF | 306 | $26.00 | $32.00 | $40.50 | $30.00 | $41.00 | $30.00 | $30.00 |
| 229 | San SWR removal of steel 24" casing (7084-7010) | LF | 70 | $30.00 | $55.00 | $59.00 | $52.00 | $59.00 | $25.00 | $52.00 |
| 230 | Trench excavation protection (7084-7011) | LF | 360 | $20.00 | $11.50 | $13.00 | $11.00 | $13.00 | $25.00 | $11.00 |
| 231 | Existing manhole adjustment (7084-7012) | EACH | 3 | $1,500.00 | $3,000.00 | $2,544.00 | $2,851.00 | $2,544.00 | $5.00 | $2,851.00 |
| 232 | Reconstruction of existing manhole (7084-7013) | EACH | 3 | $14,000 | $4,300.00 | $12,702 | $4,075.00 | $12,702 | $500.00 | $4,075.00 |
| 233 | Hydrostatic pressure test (7084-7014) | EACH | 1 | $1,643.00 | $1,590.00 | $4,117.00 | $1,490.00 | $4,117.00 | $4,000.00 | $1,490.00 |
| 234 | Steel casing (open cut) (7084-7015) | LF | 80 | $300.00 | $250.00 | $292.00 | $235.00 | $292.00 | $2,500.00 | $235.00 |
| 235 | Steel casing (jack and bore) (7084-7016) | LF | 131 | $100.00 | $199.00 | $223.50 | $187.00 | $224.00 | $300.00 | $187.00 |
| 236 | Frce MN (PVC)(16")(carrier)(open cut) (7084-7017) | LF | 80 | $200.00 | $192.00 | $205.00 | $180.00 | $205.00 | $1,115.00 | $180.00 |
| 237 | Frce MN (PVC)(16")(carrier)(jack&bore) (7084-7018) | LF | 131 | $300.00 | $177.00 | $205.00 | $166.00 | $205.00 | $115.00 | $166.00 |
| 238 | Water main pipe (PVC)(C900)(4") (7087-7001) | LF | 128 | $60.00 | $61.00 | $85.50 | $57.00 | $86.00 | $125.00 | $57.00 |
| 239 | Water main pipe (PVC)(C900)(6") (7087-7002) | LF | 61 | $75.00 | $71.00 | $95.50 | $67.00 | $96.00 | $45.00 | $67.00 |
| 240 | Water main pipe (PVC)(C900)(8") (7087-7003) | LF | 121 | $80.00 | $98.00 | $107.00 | $92.00 | $107.00 | $65.00 | $92.00 |
| 241 | Water main pipe (PVC)(C900)(12") (7087-7004) | LF | 7,289 | $130.00 | $100.00 | $143.00 | $94.00 | $129.00 | $70.00 | $94.00 |
| 242 | Casing steel (24") install by jack & bore (7087-7005) | LF | 1,113 | $500.00 | $149.00 | $171.50 | $140.00 | $172.00 | $85.00 | $140.00 |
| 243 | Casing steel (24") install by open cut (7087-7006) | LF | 150 | $300.00 | $200.00 | $231.50 | $190.00 | $232.00 | $865.00 | $190.00 |
| 244 | Carrier pipe (12") install by open cut (7087-7007) | LF | 150 | $130.00 | $114.00 | $108.50 | $107.00 | $109.00 | $195.00 | $107.00 |
| 245 | Carrier pipe (6") bore or tunnel (7087-7008) | LF | 38 | $150.00 | $83.00 | $97.00 | $78.00 | $97.00 | $85.00 | $78.00 |
| 246 | Carrier pipe (12") bore or tunnel (7087-7009) | LF | 1,075 | $140.00 | $95.00 | $108.50 | $89.00 | $109.00 | $35.00 | $89.00 |
| 247 | Gate valve W box (4") (7087-7010) | EACH | 1 | $1,250.00 | $1,630.00 | $2,772.00 | $1,525.00 | $2,772.00 | $65.00 | $1,525.00 |
| 248 | Gate valve W box (6") (7087-7011) | EACH | 1 | $1,500.00 | $1,740.00 | $2,850.00 | $1,630.00 | $2,850.00 | $2,150.00 | $1,630.00 |
| 249 | Gate valve W box (8") (7087-7012) | EACH | 4 | $2,000.00 | $2,400.00 | $3,884.50 | $2,242.00 | $3,885.00 | $2,500.00 | $2,242.00 |
| 250 | Gate valve W box (12") (7087-7013) | EACH | 12 | $3,500.00 | $4,200.00 | $5,624.00 | $3,973.00 | $5,624.00 | $3,250.00 | $3,973.00 |
| 251 | Gate valve W box (16") (7087-7014) | EACH | 1 | $8,000.00 | $9,700.00 | $11,355 | $9,110.00 | $11,354 | $5,000.00 | $9,110.00 |
| 252 | Grout abandonment water main (4") (7087-7015) | LF | 127 | $50.00 | $37.00 | $114.50 | $35.00 | $115.00 | $40.00 | $35.00 |
| 253 | Grout abandonment water main (12") (7087-7016) | LF | 36 | $61.00 | $45.00 | $138.00 | $42.00 | $138.00 | $40.00 | $42.00 |
| 254 | Remove existing water line (4") (7087-7017) | LF | 486 | $5.00 | $21.00 | $19.50 | $20.00 | $20.00 | $60.00 | $20.00 |
| 255 | Remove existing water line (6") (7087-7018) | LF | 255 | $5.00 | $21.00 | $19.50 | $20.00 | $20.00 | $30.00 | $20.00 |
| 256 | Remove existing water line (8") (7087-7019) | LF | 2,162 | $5.00 | $21.00 | $15.00 | $20.00 | $21.00 | $40.00 | $20.00 |
| 257 | Remove existing water line (12") (7087-7020) | LF | 3,613 | $5.00 | $22.00 | $15.50 | $21.00 | $16.00 | $35.00 | $21.00 |
| 258 | Ductile iron fittings W/ restrain (7087-7021) | TON | 9.66 | $10,000 | $13,600 | $651.50 | $12,770 | $652.00 | $40.00 | $12,770 |
| 259 | Cut-in tee (complete)(6"X6") (7087-7022) | EACH | 1 | $10,000 | $7,500.00 | $8,282.50 | $6,996.00 | $8,282.00 | $18,750 | $6,996.00 |
| 260 | Cut-in tee (complete)(8"X8") (7087-7023) | EACH | 1 | $12,000 | $8,000.00 | $8,892.00 | $7,540.00 | $8,892.00 | $4,500.00 | $7,540.00 |
| 261 | Water (tie-in)(complete) (4") (7087-7024) | EACH | 1 | $1,000.00 | $4,100.00 | $7,336.50 | $3,822.00 | $7,337.00 | $5,000.00 | $3,822.00 |
| 262 | Water (tie-in)(complete) (6") (7087-7025) | EACH | 1 | $1,000.00 | $4,700.00 | $7,460.00 | $4,390.00 | $7,460.00 | $2,000.00 | $4,390.00 |
| 263 | Water (tie-in)(complete) (8") (7087-7026) | EACH | 4 | $1,100.00 | $6,800.00 | $7,526.50 | $6,376.00 | $7,526.00 | $3,000.00 | $6,376.00 |
| 264 | Water (tie-in)(complete) (12") (7087-7027) | EACH | 9 | $1,640.00 | $7,200.00 | $7,891.50 | $6,724.00 | $7,892.00 | $4,150.00 | $6,724.00 |
| 265 | Water (tie-in)(complete) (16") (7087-7028) | EACH | 1 | $3,500.00 | $7,900.00 | $8,730.50 | $7,403.00 | $8,730.00 | $4,750.00 | $7,403.00 |
| 266 | Trench excavation protection (7087-7029) | LF | 7,609 | $5.00 | $4.90 | $2.60 | $4.60 | $3.00 | $5.00 | $4.60 |
| 267 | Hydrostatic pressure test (7087-7030) | EACH | 9 | $1,643.00 | $3,000.00 | $2,382.50 | $2,800.00 | $2,383.00 | $5.00 | $2,800.00 |
| 268 | Relay short service (3/4") (7087-7031) | EACH | 21 | $1,535.00 | $2,200.00 | $4,089.00 | $2,105.00 | $4,089.00 | $250.00 | $2,105.00 |
| 269 | Relay short service (1") (7087-7032) | EACH | 1 | $2,000.00 | $2,500.00 | $4,340.50 | $2,344.00 | $4,340.00 | $3,500.00 | $2,344.00 |
| 270 | 2" blow off valve (7087-7033) | EACH | 4 | $1,080.00 | $3,600.00 | $3,021.50 | $3,358.00 | $3,021.00 | $3,750.00 | $3,358.00 |
| 271 | Water (jacking, boring, or tunneling) (7087-7034) | LF | 989 | $500.00 | $640.00 | $668.50 | $596.00 | $568.00 | $700.00 | $596.00 |
| 272 | Fire hydrant assembly (7087-7035) | EACH | 13 | $5,480.00 | $8,600.00 | $8,320.00 | $8,078.00 | $8,320.00 | $700.00 | $8,078.00 |
| 273 | Structural excavation (AC pipe RMVL) (7087-7036) | CY | 1,369 | $75.00 | $68.00 | $16.50 | $64.00 | $17.00 | $45.00 | $64.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 3, 2026. Compiled by Mirage Metrics.