Hunter Industries, LTD.: TxDOT bid record
Hunter Industries, LTD. submitted 467 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 04 NOV 2026, and was the low bidder on 131 of them (28%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $1,435,825,914
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 46 | 16 | 35% |
| 2021 | 77 | 27 | 35% |
| 2022 | 61 | 14 | 23% |
| 2023 | 66 | 16 | 24% |
| 2024 | 49 | 11 | 22% |
| 2025 | 85 | 27 | 32% |
| 2026 | 83 | 20 | 24% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Austin District | 166 | 31 | 19% |
| San Antonio District | 102 | 26 | 25% |
| Yoakum District | 100 | 44 | 44% |
| Corpus Christi District | 60 | 19 | 32% |
| Laredo District | 30 | 11 | 37% |
| San Angelo District | 5 | 0 | 0% |
| Brownwood District | 3 | 0 | 0% |
| El Paso District | 1 | 0 | 0% |
Pay items where it is most often lowest
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Texas Materials Group, Inc. | 227 | 102 of 227 |
| Lone Star Paving Company | 149 | 102 of 149 |
| CK Newberry, LLC | 121 | 39 of 121 |
| Clark Construction of Texas, Inc. | 118 | 57 of 118 |
| Dean Word Company, LTD. | 85 | 28 of 85 |
| Anderson Columbia Co., Inc. | 74 | 30 of 74 |
| Angel Brothers Holdings Corp. | 73 | 25 of 73 |
| Acme Bridge Company, Inc. | 58 | 20 of 58 |
| Allen Keller Company | 57 | 26 of 57 |
| J. Carroll Weaver, Inc. | 49 | 22 of 49 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00188206 | Austin District | Resurface Roadway, IH 35 (0.73 MI N of Posey Rd to 0.19 MI S of SH 123) | 2 of 6 | $3,184,282 | +14% |
| 07 OCT 2026 | A00064192 | San Antonio District | Widen Road - Add Shoulders, US 87 (Bexar/Wilson County Line to FM 1346) | 1 of 8 | $39,881,467 | Low, 9.0% under the second |
| 06 OCT 2026 | A00195149 | Corpus Christi District | Rehabilitate Existing Roadway, FM 791 (FM 1344 to FM 887) | 3 of 7 | $18,493,470 | +4.0% |
| 03 SEP 2026 | A00206794 | San Antonio District | Hazard Elimination & Safety, SL 1604 (Trumbo Rd. to Pleasanton Rd.) | 1 of 6 | $3,445,215 | Low, 4.0% under the second |
| 03 SEP 2026 | A00061184 | Austin District | Widen Road - Add Shoulders, SH 304 (BASTROP COUNTY LINE to 3.2 Mi SOUTH OF BASTROP COUNTY LINE) | 1 of 8 | $5,111,478 | Low, 7.0% under the second |
| 03 SEP 2026 | A00207181 | Yoakum District | Construct Pedestrian Infrastructure, US 87 (TROPICAL DRIVE to BU 59T) | 5 of 7 | $6,244,341 | +17% |
| 02 SEP 2026 | A00197294 | Austin District | Preventive Maintenance, FM 1331 (0.53 MI W of FM 619 to Milam C/L) | 2 of 4 | $2,404,891 | +11% |
| 06 AUG 2026 | A00197439 | Austin District | Highway Improvement, RM 150 (0.476 MI SE of Darden Hill Rd to RM 1826) | 2 of 7 | $3,447,342 | 0.0% |
| 06 AUG 2026 | A00193144 | Austin District | Hazard Elimination & Safety, US 281 (0.8 MI N of PR1 to 0.515 MI S of PR1) | 1 of 7 | $2,419,095 | Low, 3.0% under the second |
| 06 AUG 2026 | A00189724 | Laredo District | Rehabilitate Existing Roadway, US 57 (US 277 to 1.179 MILES SOUTH OF SL 480) | 2 of 3 | $8,991,896 | +2.0% |
| 06 AUG 2026 | A00209034 | Corpus Christi District | Rehabilitate Existing Roadway, US 281 (Tullos St to N of SH 72 North) | 3 of 8 | $10,057,980 | +4.0% |
| 06 AUG 2026 | A00136986 | San Antonio District | Bridge Replacement, IH 10 (At SH 80 to .) | 1 of 8 | $5,753,739 | Low, 4.0% under the second |
| 06 AUG 2026 | A00124182 | Yoakum District | Widen Road - Add Lanes And Shoulders, FM 236 (US 77 to FM 622) | 2 of 3 | $26,432,444 | +6.0% |
| 06 AUG 2026 | A00207005 | Yoakum District | Emissions Reduction, SH 172 (@ SH 111 to .) | 2 of 3 | $6,196,528 | +16% |
| 05 AUG 2026 | A00196471 | Corpus Christi District | Roadway Rehabilitation/Reconstruction With No Added Capacity, FM 81 (US 181 to FM 1144) | 2 of 9 | $8,444,530 | +1.0% |
| 05 AUG 2026 | A00197422 | San Antonio District | Resurface Roadway, US 57 (Zavala/Frio County Line to FM 140) | 2 of 6 | $7,521,170 | +1.0% |
| 05 AUG 2026 | A00212948 | Yoakum District | Surfacing/Roadway Restoration, FM 3131 (0.60 Mi S of FM 1822 to FM 1593) | 2 of 3 | $1,038,607 | +4.0% |
| 05 AUG 2026 | A00136503 | Laredo District | Bridge Replacement, US 83 (1.80 MILES SOUTH OF UVALDE COUNTY LINE to .) | 2 of 10 | $14,520,388 | +5.0% |
| 05 AUG 2026 | A00193149 | Austin District | Hazard Elimination & Safety, SH 29 (SH 71 to 0.110 MI E of Zula Rd) | 3 of 6 | $2,542,785 | +3.0% |
| 05 AUG 2026 | A00193142 | Austin District | Hazard Elimination & Safety, US 290 (0.275 MI W of FM 973 to 0.189 MI E of FM 973) | 3 of 6 | $8,987,526 | +5.0% |
| 02 JUL 2026 | A00216234 | Austin District | Highway Improvement, SH 71 (0.49 miles west of SH 21 to SH 21) | 5 of 5 | $1,451,194 | +32% |
| 02 JUL 2026 | A00206483 | Yoakum District | Hazard Elimination & Safety, SH 71 (7.80 Mi N of Wharton C/L to Wharton C/L) | 7 of 9 | $8,114,943 | +70% |
| 01 JUL 2026 | A00200789 | Austin District | Hazard Elimination & Safety, IH 35 (Inner Loop Entrance to Westinghouse Rd Exit) | 2 of 5 | $3,026,334 | +4.0% |
| 01 JUL 2026 | A00193362 | San Antonio District | Hazard Elimination & Safety, IH 35 (SBFR IH 35 at Loma Vista to SBFR IH 35 at Peach Ave) | 6 of 7 | $14,906,103 | +24% |
| 01 JUL 2026 | A00209381 | San Antonio District | Resurface Roadway, US 87 (Rosillo Creek to FM 1516) | 3 of 8 | $2,658,674 | +15% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.