TxDOT contract A00206483 bid tabulation
Hazard Elimination & Safety, SH 71 (7.80 Mi N of Wharton C/L to Wharton C/L). Let by Texas DOT on July 2, 2026, Colorado, Yoakum District. 9 bids received; low bid $4,778,226 by 3LW Civil LLC, -8.2% against the engineer's estimate of $5,202,387.
- Owner
- Texas DOT
- Letting
- 02 JUL 2026
- Pay items
- 149
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | 3LW Civil LLC | $4,778,226 | Low | -8.0% |
| 2 | E-Z Bel Construction, LLC | $5,182,277 | +8.0% | 0.0% |
| 3 | Texas Steel Industrial Placing, LLC | $5,488,592 | +15% | +6.0% |
| 4 | STX Civil | $5,635,247 | +18% | +8.0% |
| 5 | Rucoba & Maya Construction, LLC | $6,413,924 | +34% | +23% |
| 6 | Joe Bland Construction LLC | $6,630,969 | +39% | +27% |
| 7 | Hunter Industries, LTD. | $8,114,943 | +70% | +56% |
| 8 | Environmental Allies, Inc. | $8,285,292 | +73% | +59% |
| 9 | MB Western Construction Co. | $8,353,988 | +75% | +61% |
Engineer's estimate: $5,202,387.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. 3LW Civil LLC | 2. E-Z Bel Construction, LLC | 3. Texas Steel Industrial Placing, LLC | 4. STX Civil | 5. Rucoba & Maya Construction, LLC | 6. Joe Bland Construction LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 37 | $1,500.00 | $3,634.04 | $3,475.00 | $1,000.00 | $1,569.32 | $1,790.00 | $2,500.00 |
| 2 | Preparation row (tree remove) (12"-24" diameter) (100-7004) | EACH | 3 | $900.00 | $2,937.50 | $2,700.00 | $1,200.00 | $2,884.83 | $816.00 | $1,500.00 |
| 3 | Preparation row (tree remove) (24"-36" diameter) (100-7005) | EACH | 1 | $1,500.00 | $4,250.00 | $3,600.00 | $3,500.00 | $4,173.80 | $1,800.00 | $1,750.00 |
| 4 | Preparation row (tree remove) (36"-48" diameter) (100-7006) | EACH | 1 | $2,500.00 | $500.00 | $4,300.00 | $4,000.00 | $4,910.36 | $2,600.00 | $2,000.00 |
| 5 | Excavation (roadway) (110-7001) | CY | 200 | $18.82 | $22.00 | $30.00 | $18.80 | $40.00 | $40.00 | |
| 6 | Embankment (final)(OC)(type C) (132-7005) | CY | 150 | $14.71 | $17.50 | $25.00 | $44.62 | $60.00 | $100.00 | |
| 7 | Embankment (vehicle)(OC)(type C) (132-7017) | CY | 833 | $35.00 | $67.32 | $28.00 | $22.00 | $42.93 | $75.00 | $125.00 |
| 8 | Blading (150-7001) | STA | 20 | $200.00 | $137.89 | $200.00 | $125.00 | $58.22 | $1,200.00 | $2,000.00 |
| 9 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 12,260 | $0.35 | $0.31 | $0.50 | $0.25 | $0.31 | $0.26 | $0.25 |
| 10 | Broadcast seed (temporary_warm) (164-7005) | SY | 3,072 | $0.25 | $0.28 | $0.25 | $0.22 | $0.27 | $0.23 | $0.25 |
| 11 | Broadcast seed (temporary_cool) (164-7006) | SY | 3,072 | $0.25 | $0.28 | $0.25 | $0.22 | $0.27 | $0.23 | $0.25 |
| 12 | Vegetative watering (168-7001) | TGL | 116 | $50.00 | $45.94 | $65.00 | $1.00 | $36.83 | $31.50 | $50.00 |
| 13 | FL BS (compacted in place)(type E GR 5)(final pos) (247-7196) | CY | 213 | $145.60 | $175.00 | $100.00 | $121.51 | $85.00 | $125.00 | |
| 14 | D-GR HMA type-B PG64-22 (341-7001) | TON | 530 | $192.38 | $175.00 | $220.00 | $145.67 | $215.00 | $105.00 | |
| 15 | D-GR HMA type D sac-B PG70-22 (341-7050) | TON | 133 | $331.25 | $175.00 | $260.00 | $164.42 | $215.00 | $195.00 | |
| 16 | Tack coat (341-7082) | GAL | 121 | $6.88 | $8.00 | $15.00 | $20.00 | $5.00 | $5.00 | |
| 17 | Cut & restore concrete paving (400-7007) | SY | 44 | $150.00 | $158.59 | $100.00 | $250.00 | $163.32 | $150.00 | $190.00 |
| 18 | Cut & restore asphalt paving (400-7008) | SY | 216 | $120.00 | $128.09 | $250.00 | $165.00 | $87.95 | $150.00 | $120.00 |
| 19 | Cem stabil BKFL (400-7010) | CY | 366 | $150.00 | $131.79 | $300.00 | $160.00 | $158.68 | $200.00 | $170.00 |
| 20 | Temporary special shoring (403-7001) | SF | 7,865 | $30.00 | $6.78 | $5.00 | $18.00 | $1.00 | $15.00 | $28.00 |
| 21 | Class C concrete (wingwalls) (420-7146) | CY | 59 | $1,000.00 | $1,476.71 | $1,400.00 | $1,300.00 | $847.70 | $1,200.00 | $850.00 |
| 22 | Riprap (concrete)(5 in) (432-7002) | CY | 78 | $600.00 | $548.65 | $525.00 | $550.00 | $528.81 | $630.00 | $735.00 |
| 23 | Riprap (stone protection)(12 in) (432-7041) | CY | 444 | $215.00 | $282.48 | $250.00 | $180.00 | $159.66 | $180.00 | $260.00 |
| 24 | Riprap (stone protection)(18 in) (432-7043) | CY | 417 | $285.40 | $260.00 | $160.00 | $160.14 | $185.00 | $250.00 | |
| 25 | Retrofit rail (type SSTR) (451-7024) | LF | 684 | $133.57 | $275.00 | $202.00 | $177.03 | $250.00 | $225.00 | |
| 26 | Retrofit rail (type T131RC) (451-7049) | LF | 100 | $273.89 | $300.00 | $228.75 | $234.10 | $282.70 | $260.00 | |
| 27 | CMP (gal steel 15 in) (460-7002) | LF | 12 | $89.10 | $72.00 | $100.00 | $69.30 | $200.00 | $210.00 | |
| 28 | CMP (gal steel 18 in) (460-7003) | LF | 150 | $125.00 | $96.17 | $90.00 | $60.00 | $91.87 | $130.00 | $310.00 |
| 29 | CMP (gal steel 24 in) (460-7005) | LF | 56 | $114.20 | $98.00 | $145.00 | $107.41 | $170.00 | $330.00 | |
| 30 | CMP (gal steel 30 in) (460-7007) | LF | 16 | $118.22 | $118.00 | $165.00 | $135.62 | $189.00 | $340.00 | |
| 31 | CMP (gal steel 48 in) (460-7011) | LF | 24 | $300.00 | $258.69 | $215.00 | $280.00 | $286.32 | $200.00 | $410.00 |
| 32 | Concrete box culvert (3 FT X 2 FT)(extend) (462-7056) | LF | 80 | $450.00 | $408.71 | $350.00 | $500.00 | $446.86 | $850.00 | $450.00 |
| 33 | Concrete box culvert (3 FT X 3 FT)(extend) (462-7057) | LF | 80 | $750.00 | $614.85 | $350.00 | $500.00 | $575.91 | $208.00 | $470.00 |
| 34 | Concrete box culvert (4 FT X 2 FT)(extend) (462-7058) | LF | 75 | $800.00 | $539.51 | $380.00 | $500.00 | $141.30 | $273.00 | $500.00 |
| 35 | Concrete box culvert (4 FT X 3 FT)(extend) (462-7059) | LF | 50 | $603.69 | $440.00 | $500.00 | $578.42 | $312.00 | $560.00 | |
| 36 | Concrete box culvert (5 FT X 2 FT)(extend) (462-7061) | LF | 326 | $800.00 | $394.38 | $450.00 | $500.00 | $612.55 | $390.00 | $605.00 |
| 37 | Concrete box culvert (5 FT X 5 FT)(extend) (462-7064) | LF | 57 | $900.00 | $708.50 | $450.00 | $1,000.00 | $685.04 | $533.00 | $925.00 |
| 38 | Concrete box culvert (6 FT X 2 FT)(extend) (462-7065) | LF | 19 | $935.50 | $460.00 | $900.00 | $535.49 | $520.00 | $750.00 | |
| 39 | Concrete box culvert (6 FT X 3 FT)(extend) (462-7066) | LF | 114 | $1,000.00 | $646.01 | $470.00 | $800.00 | $116.94 | $572.00 | $800.00 |
| 40 | Concrete box culvert (6 FT X 4 FT)(extend) (462-7067) | LF | 44 | $650.00 | $549.62 | $480.00 | $900.00 | $427.89 | $624.00 | $1,725.00 |
| 41 | Concrete box culvert (7 FT X 3 FT)(extend) (462-7070) | LF | 47 | $758.36 | $500.00 | $1,000.00 | $469.79 | $728.00 | $925.00 | |
| 42 | Concrete box culvert (8 FT X 3 FT)(extend) (462-7075) | LF | 40 | $1,300.00 | $951.79 | $525.00 | $1,000.00 | $734.74 | $793.00 | $1,225.00 |
| 43 | Concrete box culvert (10 FT X 10 FT)(extend) (462-7093) | LF | 88 | $501.73 | $750.00 | $1,400.00 | $2,197.64 | $1,742.00 | $2,300.00 | |
| 44 | RC pipe (CL III)(12 in) (464-7001) | LF | 12 | $85.40 | $80.00 | $120.00 | $69.62 | $91.25 | $200.00 | |
| 45 | RC pipe (CL III)(15 in) (464-7002) | LF | 24 | $105.00 | $73.46 | $104.00 | $120.00 | $74.65 | $93.85 | $210.00 |
| 46 | RC pipe (CL III)(18 in) (464-7003) | LF | 348 | $100.00 | $36.17 | $85.00 | $90.00 | $90.05 | $98.45 | $110.00 |
| 47 | RC pipe (CL III)(24 in) (464-7005) | LF | 839 | $115.00 | $86.34 | $108.00 | $100.00 | $111.75 | $151.00 | $130.00 |
| 48 | RC pipe (CL III)(30 in) (464-7007) | LF | 20 | $180.00 | $125.76 | $330.00 | $200.00 | $149.52 | $217.65 | $245.00 |
| 49 | RC pipe (CL III)(36 in) (464-7009) | LF | 16 | $240.00 | $191.26 | $290.00 | $240.00 | $187.71 | $306.25 | $325.00 |
| 50 | RC pipe (CL III)(42 in) (464-7010) | LF | 16 | $300.00 | $214.44 | $325.00 | $260.00 | $247.62 | $402.50 | $385.00 |
| 51 | RC pipe (ellip)(CL III)(des 4) (464-7061) | LF | 12 | $309.31 | $425.00 | $375.00 | $284.45 | $550.00 | $390.00 | |
| 52 | RC pipe (ellip)(CL III)(des 5) (464-7062) | LF | 104 | $329.84 | $425.00 | $400.00 | $356.27 | $690.00 | $395.00 | |
| 53 | Headwall (CH - FW - 30) (diameter= 24 in) (466-7035) | EACH | 2 | $2,462.72 | $4,500.00 | $13,000 | $8,733.41 | $12,350 | $4,000.00 | |
| 54 | Wingwall (FW - 0) (HW=3 FT) (466-7145) | EACH | 6 | $10,000 | $6,542.48 | $3,000.00 | $13,000 | $11,066 | $11,165 | $3,000.00 |
| 55 | Wingwall (FW - 0) (HW=4 FT) (466-7146) | EACH | 7 | $11,000 | $7,187.64 | $4,100.00 | $13,000 | $12,232 | $13,086 | $4,750.00 |
| 56 | Wingwall (FW - 0) (HW=5 FT) (466-7147) | EACH | 1 | $12,000 | $7,514.83 | $4,500.00 | $19,000 | $15,521 | $15,418 | $7,500.00 |
| 57 | Wingwall (FW - 0) (HW=6 FT) (466-7148) | EACH | 2 | $15,000 | $7,053.86 | $8,000.00 | $20,000 | $15,795 | $18,271 | $9,000.00 |
| 58 | Wingwall (PW - 1) (HW=3 FT) (466-7173) | EACH | 4 | $7,188.31 | $8,000.00 | $15,500 | $9,543.93 | $13,058 | $3,500.00 | |
| 59 | Wingwall (PW - 1) (HW=4 FT) (466-7174) | EACH | 4 | $13,459 | $9,500.00 | $15,500 | $15,546 | $20,945 | $5,500.00 | |
| 60 | Wingwall (PW - 1) (HW=12 FT) (466-7182) | EACH | 2 | $33,564 | $65,000 | $65,000 | $73,929 | $65,919 | $52,500 | |
| 61 | Set (type I)(S= 3 FT)(HW= 2 FT)(6:1)(P) (467-7039) | EACH | 4 | $4,689.79 | $5,200.00 | $5,000.00 | $4,955.75 | $15,008 | $9,500.00 | |
| 62 | Set (type I)(S= 3 FT)(HW= 3 FT)(3:1)(C) (467-7040) | EACH | 2 | $4,363.00 | $5,000.00 | $5,000.00 | $7,376.14 | $15,432 | $5,000.00 | |
| 63 | Set (type I)(S= 3 FT)(HW= 4 FT)(6:1)(P) (467-7047) | EACH | 2 | $7,308.15 | $7,500.00 | $6,500.00 | $11,374 | $17,712 | $11,000 | |
| 64 | Set (type I)(S= 4 FT)(HW= 3 FT)(3:1)(C) (467-7067) | EACH | 2 | $5,860.72 | $4,800.00 | $7,500.00 | $7,614.20 | $16,504 | $5,000.00 | |
| 65 | Set (type I)(S= 4 FT)(HW= 3 FT)(6:1)(P) (467-7070) | EACH | 2 | $7,809.84 | $6,800.00 | $14,500 | $10,928 | $17,970 | $10,500 | |
| 66 | Set (type I)(S= 4 FT)(HW= 4 FT)(3:1)(C) (467-7071) | EACH | 2 | $7,030.52 | $6,000.00 | $13,000 | $9,064.58 | $16,908 | $10,500 | |
| 67 | Set (type I)(S= 5 FT)(HW= 3 FT)(4:1)(C) (467-7096) | EACH | 6 | $5,176.60 | $4,400.00 | $10,000 | $5,714.87 | $14,450 | $8,000.00 | |
| 68 | Set (type I)(S= 5 FT)(HW= 3 FT)(6:1)(P) (467-7098) | EACH | 2 | $8,095.81 | $16,900 | $12,000 | $12,732 | $16,670 | $10,750 | |
| 69 | Set (type I)(S= 6 FT)(HW= 4 FT)(6:1)(P) (467-7131) | EACH | 12 | $8,506.01 | $8,000.00 | $12,000 | $12,236 | $19,297 | $10,000 | |
| 70 | Set (type I)(S= 6 FT)(HW= 5 FT)(3:1)(C) (467-7132) | EACH | 6 | $7,167.13 | $5,800.00 | $13,000 | $9,184.08 | $16,848 | $9,250.00 | |
| 71 | Set (type I)(S= 8 FT)(HW= 4 FT)(6:1)(P) (467-7182) | EACH | 2 | $10,424 | $11,000 | $18,000 | $19,802 | $21,788 | $13,500 | |
| 72 | Set (type II) (12 in) (RCP) (6: 1) (P) (467-7292) | EACH | 2 | $1,403.21 | $850.00 | $1,500.00 | $1,638.10 | $1,550.00 | $2,250.00 | |
| 73 | Set (type II) (15 in) (CMP) (6: 1) (P) (467-7296) | EACH | 4 | $1,698.48 | $850.00 | $1,500.00 | $1,632.73 | $3,500.00 | $2,375.00 | |
| 74 | Set (type II) (15 in) (RCP) (6: 1) (P) (467-7300) | EACH | 14 | $1,300.00 | $1,635.94 | $950.00 | $1,000.00 | $1,684.18 | $1,850.00 | $2,400.00 |
| 75 | Set (type II) (18 in) (CMP) (6: 1) (P) (467-7304) | EACH | 44 | $1,300.00 | $1,339.56 | $950.00 | $1,100.00 | $1,843.30 | $1,600.00 | $2,500.00 |
| 76 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 155 | $1,500.00 | $1,355.67 | $1,050.00 | $1,400.00 | $2,140.75 | $2,200.00 | $2,250.00 |
| 77 | Set (type II) (18 in) (TP) (6: 1) (P) (467-7312) | EACH | 18 | $1,300.00 | $1,381.16 | $1,000.00 | $1,300.00 | $2,071.04 | $2,100.00 | $2,500.00 |
| 78 | Set (type II) (21 in) (CMP) (6: 1) (P) (467-7316) | EACH | 2 | $6,724.96 | $1,000.00 | $1,300.00 | $2,249.61 | $2,200.00 | $3,250.00 | |
| 79 | Set (type II) (21 in) (RCP) (6: 1) (P) (467-7320) | EACH | 2 | $1,800.00 | $1,483.40 | $1,300.00 | $2,000.00 | $1,946.14 | $2,200.00 | $3,250.00 |
| 80 | Set (type II) (24 in) (CMP) (6: 1) (P) (467-7324) | EACH | 27 | $1,900.00 | $1,275.30 | $1,100.00 | $1,000.00 | $2,295.30 | $2,300.00 | $3,500.00 |
| 81 | Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325) | EACH | 2 | $1,419.10 | $1,100.00 | $1,850.00 | $2,271.41 | $1,800.00 | $3,000.00 | |
| 82 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 286 | $2,000.00 | $1,333.24 | $1,350.00 | $1,500.00 | $2,590.94 | $2,200.00 | $3,225.00 |
| 83 | Set (type II) (24 in) (TP) (6: 1) (P) (467-7332) | EACH | 18 | $2,000.00 | $1,485.33 | $1,100.00 | $2,000.00 | $2,585.17 | $2,600.00 | $3,500.00 |
| 84 | Set (type II) (30 in) (CMP) (6: 1) (P) (467-7344) | EACH | 8 | $2,500.00 | $2,836.72 | $2,500.00 | $2,500.00 | $3,799.94 | $3,145.00 | $7,000.00 |
| 85 | Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348) | EACH | 6 | $2,900.00 | $2,829.93 | $2,100.00 | $3,500.00 | $3,244.00 | $3,400.00 | $5,150.00 |
| 86 | Set (type II) (48 in) (CMP) (6: 1) (P) (467-7388) | EACH | 6 | $3,000.00 | $7,246.69 | $5,400.00 | $10,000 | $8,102.13 | $5,169.00 | $16,750 |
| 87 | Set (type II) (des 4) (CMP) (6: 1) (P) (467-7438) | EACH | 2 | $3,434.05 | $3,500.00 | $4,000.00 | $4,639.81 | $3,760.00 | $8,000.00 | |
| 88 | Set (type II) (des 5) (CMP) (6: 1) (P) (467-7446) | EACH | 8 | $3,686.96 | $4,200.00 | $5,000.00 | $6,094.51 | $5,671.00 | $8,000.00 | |
| 89 | Thermoplastic pipe (PP) (18") (468-7001) | LF | 80 | $50.00 | $98.79 | $800.00 | $75.00 | $99.33 | $105.00 | $135.00 |
| 90 | Thermoplastic pipe (PP) (24") (468-7002) | LF | 80 | $85.00 | $11.35 | $800.00 | $75.00 | $127.56 | $115.00 | $150.00 |
| 91 | Clean existing culverts (480-7001) | EACH | 3 | $3,000.00 | $20,572 | $3,500.00 | $2,500.00 | $980.27 | $1,400.00 | $3,500.00 |
| 92 | Removing structure (small) (496-7036) | EACH | 13 | $500.00 | $651.16 | $1,500.00 | $1,000.00 | $499.64 | $850.00 | $750.00 |
| 93 | Mobilization (500-7001) | LS | 1 | $200,000 | $463,646 | $510,000 | $555,000 | $415,945 | $390,000 | $150,000 |
| 94 | Barricades, signs and traffic handling (502-7001) | MO | 18 | $3,000.00 | $2,263.96 | $2,500.00 | $2,250.00 | $2,578.85 | $1,350.00 | $1,250.00 |
| 95 | Portable changeable message sign (503-7002) | EACH | 4 | $9,000.00 | $56.25 | $35,000 | $30,000 | $7,155.03 | $20,000 | $11,500 |
| 96 | TMA (stationary) (505-7001) | DAY | 385 | $190.00 | $169.03 | $540.00 | $175.00 | $149.98 | $180.00 | $500.00 |
| 97 | TMA (mobile operation) (505-7003) | DAY | 54 | $180.00 | $443.75 | $800.00 | $1.00 | $114.93 | $1,200.00 | $1,150.00 |
| 98 | Rock filter dams (install) (type 1) (506-7001) | LF | 400 | $40.00 | $56.25 | $42.00 | $40.00 | $55.24 | $46.20 | $50.00 |
| 99 | Rock filter dams (remove) (506-7011) | LF | 400 | $12.00 | $25.00 | $10.00 | $10.00 | $24.55 | $13.65 | $20.00 |
| 100 | Temporary sediment control fence (install) (506-7039) | LF | 2,670 | $4.00 | $4.69 | $3.75 | $4.00 | $4.60 | $5.25 | $6.00 |
| 101 | Temporary sediment control fence (remove) (506-7041) | LF | 2,670 | $1.50 | $1.25 | $1.00 | $1.00 | $1.23 | $1.05 | $1.00 |
| 102 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 2,460 | $17.35 | $23.00 | $30.00 | $29.13 | $65.00 | $100.00 | |
| 103 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 3,480 | $11.12 | $7.00 | $15.00 | $12.42 | $15.00 | $15.00 | |
| 104 | Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049) | LF | 2,460 | $18.62 | $13.75 | $15.00 | $28.27 | $26.00 | $15.00 | |
| 105 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 5,860 | $0.48 | $1.50 | $2.14 | $0.20 | $1.00 | $0.50 | |
| 106 | Fill milled asphalt rumble strips (shoulder) (533-7005) | LF | 5,860 | $3.49 | $2.75 | $4.50 | $2.26 | $11.80 | $3.00 | |
| 107 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,600 | $28.10 | $26.00 | $24.00 | $29.46 | $15.10 | $28.00 | |
| 108 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 12 | $3,212.85 | $2,159.00 | $1,850.00 | $2,271.04 | $1,358.45 | $2,125.00 | |
| 109 | Metal W - beam guard fence (low fill culvert) (540-7018) | LF | 50 | $76.14 | $111.00 | $93.00 | $114.17 | $92.92 | $105.00 | |
| 110 | Remove metal beam guard fence (542-7001) | LF | 1,700 | $4.43 | $3.75 | $1.50 | $1.84 | $3.03 | $2.00 | |
| 111 | Remove terminal anchor section (542-7002) | EACH | 8 | $644.82 | $325.00 | $150.00 | $184.14 | $227.25 | $175.00 | |
| 112 | Guardrail end treatment (install) (544-7001) | EACH | 16 | $3,828.45 | $3,607.00 | $3,450.00 | $4,235.18 | $2,333.10 | $3,950.00 | |
| 113 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $429.88 | $1,100.00 | $150.00 | $184.14 | $303.00 | $175.00 | |
| 114 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 14 | $655.33 | $953.00 | $600.00 | $3,702.65 | $2,979.50 | $690.00 | |
| 115 | Crash cushion attenuator (remove) (545-7004) | EACH | 8 | $470.47 | $953.00 | $450.00 | $1,151.44 | $1,212.00 | $515.00 | |
| 116 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 8 | $8,003.45 | $12,585 | $6,750.00 | $8,989.59 | $6,411.64 | $7,750.00 | |
| 117 | Mailbox install-S (WC-post) type 3 (560-7004) | EACH | 1 | $937.50 | $350.00 | $400.00 | $346.54 | $150.00 | $350.00 | |
| 118 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 9,135 | $4.42 | $7.25 | $13.00 | $15.96 | $24.49 | $14.50 | |
| 119 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 813 | $43.17 | $40.00 | $30.00 | $36.83 | $41.41 | $35.00 | |
| 120 | Conduit (RM) (2") (618-7078) | LF | 339 | $30.87 | $56.25 | $35.00 | $42.97 | $78.07 | $40.00 | |
| 121 | Electrical conductor (no.8) bare (620-7007) | LF | 8,425 | $1.88 | $2.00 | $1.55 | $1.90 | $2.12 | $2.00 | |
| 122 | Electrical conductor (no.8) insulated (620-7008) | LF | 4,180 | $3.14 | $2.25 | $1.65 | $2.03 | $2.27 | $2.00 | |
| 123 | Electrical conductor (no.6) bare (620-7009) | LF | 1,711 | $4.55 | $2.50 | $1.75 | $2.15 | $2.37 | $2.00 | |
| 124 | Electrical conductor (no.6) insulated (620-7010) | LF | 3,422 | $3.12 | $3.00 | $1.95 | $2.39 | $2.72 | $2.25 | |
| 125 | Ground box type A (122311)W/apron (624-7002) | EACH | 16 | $1,057.25 | $1,218.00 | $1,085.00 | $1,331.93 | $1,321.08 | $1,250.00 | |
| 126 | Elc SRV type T 120/240 000(NS)GS(N)SP(O) (628-7326) | EACH | 1 | $7,753.78 | $7,257.00 | $5,500.00 | $6,751.74 | $7,350.78 | $6,250.00 | |
| 127 | Aluminum signs (type A) (636-7001) | SF | 380 | $37.50 | $56.75 | $25.00 | $30.69 | $30.30 | $30.00 | |
| 128 | Remove SM RD SN sup&AM (644-7073) | EACH | 1 | $250.00 | $192.00 | $200.00 | $155.02 | $20.20 | $350.00 | |
| 129 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 43 | $50.00 | $25.00 | $32.00 | $39.28 | $40.40 | $36.00 | |
| 130 | Install object marker assembly (OM-2Y)(WC)GND (658-7056) | EACH | 8 | $250.00 | $100.00 | $75.00 | $82.50 | $202.00 | $85.00 | |
| 131 | Install object marker assembly (OM-2Y)(WC)GNDLL(BI) (658-7247) | EACH | 4 | $250.00 | $100.00 | $75.00 | $99.88 | $202.00 | $85.00 | |
| 132 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 93 | $12.50 | $10.00 | $10.00 | $12.28 | $10.10 | $12.00 | |
| 133 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 12,251 | $1.25 | $1.25 | $1.00 | $1.23 | $1.01 | $1.50 | |
| 134 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 12,981 | $1.25 | $1.25 | $1.00 | $1.23 | $1.01 | $1.50 | |
| 135 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 9,240 | $1.25 | $1.75 | $1.00 | $1.23 | $1.01 | $2.00 | |
| 136 | Type I high perf PM (Y)6"(broken)(100MIL) (666-7302) | LF | 1,060 | $1.25 | $1.75 | $1.00 | $1.23 | $1.01 | $2.00 | |
| 137 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 4,782 | $1.25 | $1.75 | $1.00 | $1.23 | $1.01 | $2.00 | |
| 138 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 93 | $12.50 | $10.00 | $10.00 | $12.28 | $10.10 | $12.00 | |
| 139 | Eliminating existing PM & markers (4") (677-7001) | LF | 14,550 | $0.63 | $1.25 | $0.50 | $0.61 | $0.51 | $1.50 | |
| 140 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 22 | $336.39 | $170.00 | $150.00 | $184.14 | $245.43 | $175.00 | |
| 141 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 8 | $440.50 | $170.00 | $150.00 | $184.14 | $245.43 | $175.00 | |
| 142 | Traffic signal CBL (type A)(10 AWG)(3 conductor) (684-7002) | LF | 5,011 | $4.48 | $4.75 | $5.65 | $6.94 | $4.45 | $7.00 | |
| 143 | Traffic signal CBL (type A)(12 AWG)(3 conductor) (684-7008) | LF | 1,583 | $6.76 | $7.75 | $3.50 | $4.30 | $7.17 | $4.00 | |
| 144 | Traffic signal CBL (type A)(14 AWG)(3 conductor) (684-7029) | LF | 84 | $21.95 | $2.00 | $1.85 | $2.27 | $2.22 | $2.00 | |
| 145 | Install RDSD flash beacon assembly (685-7001) | EACH | 14 | $4,364.16 | $7,000.00 | $7,500.00 | $9,206.92 | $6,920.52 | $8,600.00 | |
| 146 | Removing RDSD FLSH BCN AM (solar PWRD) (685-7006) | EACH | 13 | $689.21 | $226.00 | $560.00 | $687.45 | $1,261.49 | $650.00 | |
| 147 | Amphibian/reptile exclusion fence inst (5003-7001) | LF | 1,920 | $10.00 | $4.25 | $5.00 | $4.55 | $4.74 | $6.00 | |
| 148 | Amphibian/reptile exclusion fence rem (5003-7002) | LF | 1,920 | $10.00 | $1.00 | $1.00 | $0.97 | $1.00 | $1.25 | |
| 149 | TMSP radar speed control monitor (6025-7001) | EACH | 4 | $7,000.00 | $12,777 | $8,483.00 | $8,000.00 | $8,002.64 | $8,100.00 | $11,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 2, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.