E-Z Bel Construction, LLC: TxDOT bid record

E-Z Bel Construction, LLC submitted 240 bids on Texas DOT contracts in the data, from 10 JAN 2020 to 04 NOV 2026, and was the low bidder on 59 of them (25%). When it was not low, its total sat a median +16% above the low bid.

Owner
Texas DOT
Low bid volume
$112,592,638
Latest bid
04 NOV 2026
Data through
19 NOV 2026
240Bids
59Low bids
25Win rate, percent
+16%Median gap to the low bid when not low, 181 bids

By year

YearBidsLow bidsWin rate
20208225%
202116425%
202212542%
2023361233%
202429931%
2025651422%
2026741318%
E-Z Bel Construction, LLC, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
San Antonio District833137%
Yoakum District53713%
Austin District381026%
Corpus Christi District2514%
Waco District19526%
Laredo District9111%
San Angelo District7457%
Bryan District400%
Abilene District100%
Brownwood District100%
E-Z Bel Construction, LLC, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Barricades, signs and traffic handling502-7001MO22370 (31%)$3,000.00$5,000.00
Temporary sediment control fence (remove)506-7041LF12454 (44%)$1.00$1.00
Reflectorized pavement marking type I (W)24"(solid)(100MIL)666-7036LF8752 (60%)$9.00$8.00
Reflectorized pavement marker type II-A-A672-7004EACH10647 (44%)$7.50$5.00
Temporary sediment control fence (install)506-7039LF12643 (34%)$4.00$4.00
Reflectorized pavement marking type I (W)8"(solid)(100MIL)666-7024LF7443 (58%)$2.00$1.10
Remove SM RD SN sup&AM644-7073EACH13142 (32%)$133.00$110.00
Biodegradable erosion control logs (remove)506-7046LF8342 (51%)$1.00$1.40
Pedestrian pole assembly687-7001EACH8036 (45%)$2,400.00$2,645.95
Reflectorized pavement marker type I-C672-7002EACH6835 (51%)$7.10$5.00
Reflectorized pavement marking type I (W)(arrow)(100MIL)666-7042EACH6134 (56%)$200.00$165.00
Reflectorized pavement marking type I (W)(word)(100MIL)666-7066EACH5831 (53%)$200.00$193.00
E-Z Bel Construction, LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

E-Z Bel Construction, LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
04 NOV 2026A00206976Austin DistrictConstruct Pedestrian Infrastructure, RM 12 (Old Kyle Road to FM 3237)8 of 9$1,272,000+34%
04 NOV 2026A00209149Laredo DistrictBridge Replacement, MANGANA-HEIN RD (MANGANA HEIN RD to .)5 of 7$3,270,969+14%
03 NOV 2026A00206952Waco DistrictInstall Traffic Signal, FM 3223 (@ Jewell Dr to @ Jewell Dr)5 of 9$359,709+23%
03 NOV 2026A00204003Bryan DistrictBridge Replacement, COUNTY ROAD 244 (ON CR 244 (FCR 344) to AT DEEP CREEK)4 of 15$749,950+4.0%
07 OCT 2026A00209154Laredo DistrictBridge Replacement, BROWN RD (BROWN RD to .)6 of 6$653,352+35%
07 OCT 2026A00064192San Antonio DistrictWiden Road - Add Shoulders, US 87 (Bexar/Wilson County Line to FM 1346)5 of 8$48,723,770+22%
09 SEP 2026A00219945Austin DistrictILLUMINATION MAINTENANCE, SH0045 (VARIOUS LOCATIONS IN to TRAVIS AND WILLIAMSON COUNTIES)4 of 4$1,515,230+127%
09 SEP 2026A00220213Austin DistrictILLUMINATION MAINTENANCE, SH0130 (VARIOUS LOCATIONS IN to WILLIAMSON AND TRAVIS COUNTIES)5 of 5$1,589,920+141%
03 SEP 2026A00206794San Antonio DistrictHazard Elimination & Safety, SL 1604 (Trumbo Rd. to Pleasanton Rd.)5 of 6$3,977,546+15%
02 SEP 2026A00184856San Antonio DistrictBridge Replacement, CR 33 (On Waring-Welfare Road to at Joshua Creek)4 of 8$765,423+16%
02 SEP 2026A00207409Yoakum DistrictBridge Replacement, COUNTY ROAD 125 (at Draw to STR # AA02-49-001)4 of 12$2,914,243+9.0%
06 AUG 2026A00193144Austin DistrictHazard Elimination & Safety, US 281 (0.8 MI N of PR1 to 0.515 MI S of PR1)7 of 7$3,442,394+42%
06 AUG 2026A00216599Austin DistrictTRAFFIC SIGNAL MAINTENANCE, US0290 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT)4 of 5$2,221,119+12%
06 AUG 2026A00218356Austin DistrictInfrastructure Improvements, Various (SH 130 at IH 35 to SH 130 @ Caldwell/Guadalupe CL)4 of 4$409,889+33%
06 AUG 2026A00218304San Antonio DistrictAdvanced Traffic Management System, IH 10 (US 87/Roland to IH 410)3 of 7$8,661,967+10%
06 AUG 2026A00136986San Antonio DistrictBridge Replacement, IH 10 (At SH 80 to .)6 of 8$6,896,186+20%
06 AUG 2026A00207005Yoakum DistrictEmissions Reduction, SH 172 (@ SH 111 to .)3 of 3$7,866,267+47%
05 AUG 2026A00217697Waco DistrictIntersection Improvement, SL 363 (@ FM 438/Young Ave to @FM 438/Young Ave)4 of 7$571,431+9.0%
05 AUG 2026A00136503Laredo DistrictBridge Replacement, US 83 (1.80 MILES SOUTH OF UVALDE COUNTY LINE to .)4 of 10$16,122,618+17%
05 AUG 2026A00210758San Angelo DistrictInstall Traffic Signal, AVE N (At Ben Flicklin Rd to -)1 of 3$589,192Low, 15% under the second
05 AUG 2026A00218301San Antonio DistrictInstall Illumination, Various (Various Locations in San Antonio to .)9 of 12$1,068,068+41%
05 AUG 2026A00194399Waco DistrictHazard Elimination & Safety, BOSQUE (0.1 Mi S of Wooded Acres to 0.1 mi N of 34th St.)2 of 4$1,934,459+27%
05 AUG 2026A00206283Yoakum DistrictBridge Replacement, FREYBURG ENGLE RD (@ ROCKY CREEK to STR# AA02-75-002 (FREYBURG-ENGLE RD))6 of 9$1,989,874+23%
08 JUL 2026A00218468Waco DistrictINSTALLATION OF TRAFFIC SIGNALS, US0190 (Various locations to in the Waco District)2 of 4$674,685+5.0%
02 JUL 2026A00206732Austin DistrictHazard Elimination & Safety, FM 734 (SH 45 to 0.66 MI S of SH45)4 of 7$398,342+16%
E-Z Bel Construction, LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy