TxDOT contract A00218304 bid tabulation
Advanced Traffic Management System, IH 10 (US 87/Roland to IH 410). Let by Texas DOT on August 6, 2026, Bexar, San Antonio District. 7 bids received; low bid $7,903,389 by Sice, Inc., -24% against the engineer's estimate of $10,408,179.
- Owner
- Texas DOT
- Letting
- 06 AUG 2026
- Pay items
- 75
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Sice, Inc. | $7,903,389 | Low | -24% |
| 2 | Mica Corporation | $8,364,058 | +6.0% | -20% |
| 3 | E-Z Bel Construction, LLC | $8,661,967 | +10% | -17% |
| 4 | Florida Traffic Control Devices, Inc. | $8,841,841 | +12% | -15% |
| 5 | The Levy Company, Inc. | $8,865,315 | +12% | -15% |
| 6 | Lumin8 Transportation Technologies, LLC | $9,493,084 | +20% | -9.0% |
| 7 | Elecnor Belco Electric, Inc. | $10,335,421 | +31% | -1.0% |
Engineer's estimate: $10,408,179.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Sice, Inc. | 2. Mica Corporation | 3. E-Z Bel Construction, LLC | 4. Florida Traffic Control Devices, Inc. | 5. The Levy Company, Inc. | 6. Lumin8 Transportation Technologies, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Block sodding (162-7002) | SY | 162 | $6.00 | $14.48 | $30.15 | $12.00 | $16.75 | $31.07 | $16.00 |
| 2 | Vegetative watering (168-7001) | TGL | 13 | $15.56 | $96.53 | $226.00 | $250.00 | $134.00 | $593.08 | $106.00 |
| 3 | Drilled shaft (36 in) (416-7006) | LF | 132 | $270.00 | $437.26 | $495.00 | $460.00 | $810.00 | $419.62 | $432.00 |
| 4 | Drilled shaft (48 in) (416-7008) | LF | 189 | $245.00 | $553.64 | $484.00 | $580.00 | $1,000.00 | $508.33 | $681.00 |
| 5 | Drilled shaft (sign mounts) (54 in) (416-7033) | LF | 186 | $660.00 | $717.08 | $498.00 | $600.00 | $945.00 | $630.38 | $1,154.00 |
| 6 | Drilled shaft (high mast pole) (60 in) (416-7037) | LF | 30 | $1,300.00 | $754.71 | $735.00 | $1,200.00 | $1,250.00 | $711.64 | $1,182.00 |
| 7 | Riprap (concrete)(4 in) (432-7001) | CY | 24.50 | $575.00 | $1,079.89 | $940.00 | $1,500.00 | $1,000.00 | $1,112.34 | $665.00 |
| 8 | Riprap (mow strip)(4 in) (432-7013) | CY | 168.50 | $518.48 | $633.46 | $551.25 | $600.00 | $585.00 | $652.49 | $698.00 |
| 9 | Jack bor or tun pipe(16 in)(steel casing) (476-7004) | LF | 270 | $1,809.88 | $1,120.00 | $630.00 | $1,132.00 | $242.66 | $1,388.00 | |
| 10 | Mobilization (500-7001) | LS | 1 | $736,608 | $759,848 | $696,310 | $700,000 | $350,000 | $595,905 | $949,250 |
| 11 | Barricades, signs and traffic handling (502-7001) | MO | 24 | $18,500 | $2,202.04 | $28,300 | $7,200.00 | $11,650 | $7,460.85 | $4,134.00 |
| 12 | TMA (stationary) (505-7001) | DAY | 120 | $145.29 | $472.82 | $1,091.00 | $550.00 | $135.00 | $54.27 | $253.00 |
| 13 | TMA (mobile operation) (505-7003) | DAY | 6 | $422.80 | $566.57 | $567.00 | $860.00 | $165.00 | $54.27 | $1,137.00 |
| 14 | Metal W-beam guard fence (timber post) (540-7001) | LF | 2,800 | $20.46 | $26.55 | $23.10 | $25.00 | $27.00 | $27.34 | $38.00 |
| 15 | Downstream anchor terminal section (540-7015) | EACH | 11 | $1,124.86 | $1,802.64 | $1,570.00 | $1,350.00 | $1,450.00 | $1,856.79 | $2,461.00 |
| 16 | Connector plate for thrie beam (540-7030) | EACH | 3 | $412.68 | $1,205.38 | $1,050.00 | $1.00 | $725.00 | $1,241.59 | $67.00 |
| 17 | Guardrail end treatment (install) (544-7001) | EACH | 14 | $2,812.50 | $4,303.88 | $3,746.00 | $3,550.00 | $2,540.00 | $4,433.19 | $4,190.00 |
| 18 | Guardrail end treatment (remove) (544-7003) | EACH | 3 | $265.00 | $361.98 | $315.00 | $150.00 | $450.00 | $372.85 | $333.00 |
| 19 | HI MST IL pole (125 FT)(100 MPH) (613-7004) | EACH | 1 | $101,300 | $61,580 | $46,000 | $65,000 | $178,460 | $55,810 | $53,872 |
| 20 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 14,510 | $7.50 | $13.62 | $8.20 | $8.60 | $10.60 | $10.46 | $16.50 |
| 21 | Conduit (PVC) (schedule 40) (3") (concrete encse) (618-7038) | LF | 103,825 | $29.00 | $14.01 | $13.25 | $15.50 | $15.35 | $21.83 | $20.25 |
| 22 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 9,950 | $18.50 | $11.95 | $21.55 | $16.20 | $12.40 | $25.47 | $29.00 |
| 23 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 28,095 | $25.50 | $11.30 | $17.27 | $18.20 | $14.30 | $30.31 | $30.50 |
| 24 | Conduit (RM) (3") (618-7082) | LF | 1,800 | $41.00 | $99.81 | $64.85 | $110.00 | $90.15 | $78.66 | $69.00 |
| 25 | Conduit (RM) (4") (618-7086) | LF | 730 | $68.00 | $99.49 | $70.85 | $125.00 | $141.80 | $86.05 | $136.50 |
| 26 | Conduit (prepare) (618-7090) | LF | 3,770 | $1.97 | $1.01 | $1.80 | $1.00 | $2.15 | $1.38 | $1.00 |
| 27 | Fiber optic cable road marker (619-7014) | EACH | 68 | $155.07 | $150.82 | $103.10 | $70.00 | $134.00 | $114.61 | $123.00 |
| 28 | Electrical conductor (no.14) insulated (620-7002) | LF | 40,085 | $1.06 | $0.67 | $1.02 | $1.00 | $1.50 | $0.84 | $0.75 |
| 29 | Electrical conductor (no.8) insulated (620-7008) | LF | 640 | $2.06 | $1.78 | $2.10 | $1.95 | $2.30 | $1.72 | $1.00 |
| 30 | Electrical conductor (no.6) insulated (620-7010) | LF | 60,955 | $2.35 | $1.99 | $2.64 | $2.50 | $2.60 | $2.10 | $1.75 |
| 31 | Tray cable (4 conductor) (14 AWG) (621-7005) | LF | 3,175 | $3.20 | $2.93 | $3.45 | $2.30 | $2.85 | $1.99 | $3.00 |
| 32 | ITS GND box(pcast) type 1 (243636)W/aprn (623-7002) | EACH | 75 | $3,800.00 | $3,812.93 | $3,737.00 | $5,500.00 | $5,600.00 | $4,785.50 | $4,605.00 |
| 33 | ITS GND box(pcast) type 2 (366048)W/aprn (623-7010) | EACH | 24 | $4,600.00 | $6,598.85 | $5,881.00 | $9,500.00 | $8,590.00 | $7,734.53 | $4,785.00 |
| 34 | Ground box type A (122311)W/apron (624-7002) | EACH | 101 | $1,200.00 | $1,771.06 | $2,020.00 | $1,500.00 | $1,440.00 | $1,868.24 | $1,165.00 |
| 35 | Ground box type D (162922)W/apron (624-7008) | EACH | 5 | $1,806.25 | $2,502.95 | $2,184.00 | $2,300.00 | $1,775.00 | $2,317.63 | $640.00 |
| 36 | Remove electrical services (628-7002) | EACH | 2 | $629.23 | $840.58 | $380.00 | $300.00 | $319.00 | $329.60 | $1,112.00 |
| 37 | Elc SRV type D 120/240 100(NS)SS(N)SP(O) (628-7259) | EACH | 24 | $6,045.61 | $6,513.77 | $6,912.00 | $7,700.00 | $6,720.00 | $6,352.79 | $6,787.00 |
| 38 | Elc SRV type D 120/240 200(NS)SS(N)SP(O) (628-7310) | EACH | 1 | $5,700.00 | $7,767.74 | $7,667.00 | $10,000 | $7,170.00 | $7,260.05 | $7,270.00 |
| 39 | Remove SM RD SN sup&AM (644-7073) | EACH | 9 | $119.72 | $1,736.70 | $380.00 | $200.00 | $203.00 | $214.36 | $169.00 |
| 40 | Install overhead sign support(30 FT bal tee) (650-7028) | EACH | 6 | $49,600 | $43,943 | $47,330 | $50,000 | $39,260 | $37,800 | $49,580 |
| 41 | Pedestrian pole assembly (687-7001) | EACH | 22 | $2,500.00 | $2,647.75 | $2,788.00 | $2,200.00 | $4,125.00 | $2,773.87 | $2,118.00 |
| 42 | Install DMS (pole MTD cabinet) (6004-7001) | EACH | 6 | $10,400 | $14,255 | $17,265 | $9,000.00 | $11,840 | $7,974.22 | $1,130.00 |
| 43 | Install DMS (foundation MTD cabinet) (6004-7002) | EACH | 1 | $10,401 | $17,904 | $22,695 | $17,500 | $14,100 | $4,204.30 | $2,194.00 |
| 44 | System integration (6009-7001) | LS | 1 | $15,000 | $9,757.86 | $69,185 | $45,000 | $74,230 | $80,687 | $11,979 |
| 45 | ITS RVSD system (data collection only) (6010-7002) | EACH | 9 | $12,328 | $11,092 | $16,525 | $9,845.00 | $12,610 | $11,820 | $12,110 |
| 46 | Remove ITS RSVD (DC only) (6010-7003) | EACH | 1 | $500.00 | $749.84 | $1,831.00 | $500.00 | $400.00 | $330.62 | $226.00 |
| 47 | ITS pole MNT cab (type 2)(conf 2) (6011-7002) | EACH | 1 | $7,237.80 | $6,371.08 | $5,330.00 | $6,200.00 | $7,270.00 | $5,768.44 | $7,316.00 |
| 48 | ITS pole (60 FT)(90 MPH) (6011-7003) | EACH | 9 | $31,000 | $30,281 | $22,205 | $35,000 | $25,960 | $26,076 | $28,795 |
| 49 | ITS pole MNT cab (type 3)(conf 1) (6011-7031) | EACH | 9 | $13,000 | $5,158.47 | $6,240.00 | $5,050.00 | $7,390.00 | $4,519.38 | $7,482.00 |
| 50 | ITS pole (20 FT) (90 MPH) (6011-7045) | EACH | 13 | $12,000 | $9,017.98 | $7,555.00 | $10,000 | $8,125.00 | $8,013.51 | $8,393.00 |
| 51 | Ground box (prepare) (6013-7006) | EACH | 15 | $216.00 | $180.99 | $495.00 | $350.00 | $310.00 | $337.10 | $226.00 |
| 52 | CCTV field equipment (digital) (6018-7002) | EACH | 12 | $7,800.00 | $10,015 | $9,600.00 | $8,415.00 | $9,855.00 | $9,857.71 | $9,955.00 |
| 53 | CCTV mount (pole) (6018-7006) | EACH | 11 | $360.00 | $881.09 | $1,042.00 | $300.00 | $380.00 | $186.42 | $326.00 |
| 54 | Remove CCTV field equipment (6018-7008) | EACH | 6 | $2,000.00 | $5,788.99 | $1,311.00 | $500.00 | $400.00 | $400.26 | $283.00 |
| 55 | Ethernet switch (install only) (6023-7001) | EACH | 24 | $513.04 | $627.51 | $1,853.00 | $500.00 | $1,080.00 | $336.93 | $377.00 |
| 56 | Fiber optic CBL (single-mode)(12 fiber) (6027-7001) | LF | 107,170 | $3.60 | $1.89 | $2.62 | $2.35 | $4.40 | $2.34 | $1.50 |
| 57 | Fiber optic fusion splice (6027-7004) | EACH | 1,406 | $90.00 | $24.13 | $54.30 | $65.00 | $75.00 | $61.17 | $50.00 |
| 58 | Fiber optic patch panel (12 position) (6027-7005) | EACH | 50 | $1,200.00 | $595.67 | $1,351.00 | $1,200.00 | $2,290.00 | $1,210.22 | $552.00 |
| 59 | Fiber optic CBL(single-mode)(144 fiber) (6027-7006) | LF | 57,260 | $4.20 | $3.14 | $5.10 | $4.50 | $7.80 | $3.54 | $4.75 |
| 60 | Fiber optic patch panel (144 positions) (6027-7008) | EACH | 8 | $8,600.00 | $1,866.78 | $5,295.00 | $2,150.00 | $1,850.00 | $3,051.78 | $7,447.00 |
| 61 | FO splice enclosure (type 1) (6027-7009) | EACH | 8 | $1,314.75 | $809.62 | $2,047.00 | $1,500.00 | $2,558.00 | $1,669.50 | $666.00 |
| 62 | Install wrong way driver detection sys (6038-7001) | EACH | 12 | $58,100 | $39,268 | $9,507.00 | $52,250 | $43,765 | $39,614 | $40,079 |
| 63 | Remove wrong way driver detection sys (6038-7003) | EACH | 4 | $10,000 | $4,483.11 | $2,486.00 | $1,900.00 | $2,817.00 | $1,134.03 | $1,679.00 |
| 64 | ITS GRND MNT cab (type 4) (conf 2) (6050-7004) | EACH | 1 | $11,600 | $9,584.32 | $12,493 | $13,200 | $9,525.00 | $9,864.69 | $10,142 |
| 65 | ITS GRND MNT cab (type 6)(conf 2) (6050-7009) | EACH | 1 | $19,400 | $19,309 | $16,516 | $18,200 | $14,140 | $16,330 | $14,732 |
| 66 | Remove and replace DMS (6054-7001) | EACH | 2 | $27,361 | $23,229 | $25,460 | $23,000 | $25,700 | $10,276 | $8,777.00 |
| 67 | Furnish and install rwis (6058-7001) | EACH | 2 | $70,000 | $66,224 | $67,152 | $65,350 | $66,980 | $60,222 | $59,500 |
| 68 | All-in-one atmospheric sensor (6058-7002) | EACH | 1 | $40,000 | $8,869.10 | $11,051 | $7,590.00 | $9,825.00 | $6,999.03 | $6,870.00 |
| 69 | Non-intrusive pave condi & temporary sensor (6058-7007) | EACH | 2 | $35,000 | $26,365 | $21,352 | $12,870 | $27,000 | $25,190 | $23,299 |
| 70 | Non-intrusive water level flood sensor (6058-7011) | EACH | 1 | $45,000 | $12,187 | $11,381 | $11,150 | $13,385 | $9,931.60 | $9,976.00 |
| 71 | Bluetooth detection system (6061-7001) | EACH | 10 | $5,900.00 | $1,568.76 | $9,655.00 | $1,000.00 | $2,040.00 | $577.10 | $6,953.00 |
| 72 | Remove existing cables (power) (6072-7001) | LF | 2,530 | $5.00 | $1.05 | $0.71 | $1.10 | $1.00 | $0.52 | $0.75 |
| 73 | Remove existing cables (communication) (6072-7002) | LF | 1,540 | $5.00 | $1.05 | $3.70 | $1.10 | $1.10 | $0.51 | $0.75 |
| 74 | Remove existing fiber hub (6080-7002) | EACH | 1 | $4,825.00 | $3,666.65 | $5,970.00 | $5,000.00 | $2,695.00 | $4,194.58 | $16,281 |
| 75 | CCTV on high mast illumin. assem. (6094-7001) | EACH | 1 | $10,800 | $112,535 | $41,200 | $208,873 | $16,000 | $128,704 | $135,291 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 6, 2026. Compiled by Mirage Metrics.