TxDOT letting results, October 7, 2026
28 contracts let by Texas DOT on October 7, 2026, $203,129,506 in low bids, a median of 5.5 bidders per contract. On the 28 with an engineer's estimate, the low bid came in under it 22 times; median low bid -10% against the estimate.
- Owner
- Texas DOT
- Contracts
- 28
- Low bids, total
- $203,129,506
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00064192 | Widen Road - Add Shoulders, US 87 (Bexar/Wilson County Line to FM 1346) | San Antonio District | 8 | Hunter Industries, LTD. | $39,881,467 | $43,638,649 | +9.0% | -21% | TxDOT |
| A00132124 | Intersection Improvements With Right And/Or Left Turn Lanes, US 69 (0.9 mi N of FM 841 to 0.5 mi W of FM 1475) | Lufkin District | 7 | Longview Bridge and Road, LTD. | $31,796,270 | $33,279,215 | +5.0% | -10% | TxDOT |
| A00192619 | Cooperative and Automated Transportation, IH 45 (IH 20 to Ellis County Line) | Dallas District | 6 | Sice, Inc. | $29,876,158 | $31,888,257 | +7.0% | -10% | TxDOT |
| A00196467 | Seal Coat, FM 46 (Falls County Line to SH 14) | Bryan District | 4 | Clark Construction of Texas, Inc. | $19,126,405 | $20,415,569 | +7.0% | +5.0% | TxDOT |
| A00209263 | Rehabilitate Existing Roadway, IH 35W (IH 35E to Johnson Co Line) | Waco District | 5 | Northeastern Pavers, LLC | $10,903,496 | $11,124,726 | +2.0% | -10% | TxDOT |
| A00197148 | Resurface Roadway, SH 132 (Bexar/Atascosa C/L to FM 2790) | San Antonio District | 3 | Ronald R. Wagner & Co., LP | $10,890,777 | $11,432,884 | +5.0% | 0.0% | TxDOT |
| A00187431 | Preventive Maintenance, FM 273 (SH 78 to FM 1396) | Paris District | 6 | A. K. Gillis & Sons, LLC | $9,766,246 | $9,964,787 | +2.0% | -11% | TxDOT |
| A00191892 | Bridge Replacement, US 90 (Sanderson Canyon and Union Pacific RR to .) | Odessa District | 7 | Relmco, Inc. | $6,768,348 | $8,170,341 | +21% | -7.0% | TxDOT |
| A00209515 | Preventive Maintenance, SH 86 (12 Miles West of Hall C/L, East to Hall C/L) | Childress District | 4 | Northeastern Pavers, LLC | $6,256,780 | $6,276,350 | 0.0% | +12% | TxDOT |
| A00224097 | DEBRIS REMOVAL, IH0010 (Districtwide to Districtwide) | Maintenance Division District | 5 | Global Emergency Services, LLC. | $4,412,777 | $4,921,400 | +12% | -10% | TxDOT |
| A00217666 | Rehabilitate Bridge, Various (Various Locations on IH 45, IH 610, to US 290, and FM 1458) | Houston District | 6 | Ragle Construction, Inc. | $4,064,176 | $4,649,883 | +14% | -7.0% | TxDOT |
| A00211436 | Bridge Maintenance, IH 27 (IH 27 NB/SH 217 BRG to .) | Amarillo District | 5 | Gibson & Associates, Inc. | $3,904,923 | $3,975,975 | +2.0% | +3.0% | TxDOT |
| A00196909 | Hazard Elimination & Safety, IH 45 (South of Risinger Rd to Dallas County Line) | Dallas District | 8 | Xit Paving and Construction Inc. | $3,761,164 | $4,069,000 | +8.0% | -17% | TxDOT |
| A00223507 | SEAL COAT, SH0132 (VARIOUS to VARIOUS) | San Antonio District | 3 | Ronald R. Wagner & Co., LP | $2,877,263 | $3,009,690 | +5.0% | +10% | TxDOT |
| A00222861 | FULL DEPTH CONCRETE REPAIR, SL0008 (Various Highways in Southeast Harris Co. to Various Highways in Southeast Harris Co.) | Houston District | 4 | Isi Contracting, Inc. | $2,731,500 | $2,774,400 | +2.0% | -10% | TxDOT |
| A00131942 | Highway Improvement, Various (Various Locations in SJT District to .) | San Angelo District | 7 | Flat Line, Inc. | $2,539,432 | $2,821,484 | +11% | -26% | TxDOT |
| A00222965 | FLEXIBLE PAVEMENT STRUCTURE REPAIR, US0281 (Various locations to Erath County) | Fort Worth District | 3 | Northeastern Pavers, LLC | $2,461,750 | $3,196,523 | +30% | -10% | TxDOT |
| A00223228 | DITCH CLEANING AND RESHAPING, US0096 (Various to Various) | Beaumont District | 2 | Texas Drainage Inc. | $2,396,085 | $3,486,600 | +46% | -12% | TxDOT |
| A00223436 | METAL BEAM GUARD FENCE REPAIR, US0081 (Various Locations Within to Tarrant County) | Fort Worth District | 3 | Short-Line Corporation | $1,895,621 | $1,960,712 | +3.0% | -30% | TxDOT |
| A00135746 | Construct Pedestrian Infrastructure, IH 35E (DART Victory Station to At IH 35E Southbound Frontage Roads) | Dallas District | 9 | Garret Shields Infrastructure | $1,177,500 | $1,183,544 | +1.0% | -8.0% | TxDOT |
| A00222519 | METAL BEAM GUARD FENCE REPAIR, SH0006 (Various locations to In McLennan, Hill, Falls, & Limestone) | Waco District | 4 | T&L Cleaning Services LLC | $1,158,972 | $1,201,397 | +4.0% | -23% | TxDOT |
| A00218294 | BRIDGE PREVENTATIVE MAINTENANCE, SH0114 (VARIOUS LOCATIONS WITHIN to Jack & Wise Counties) | Fort Worth District | 7 | Shalom Services Corporation | $1,040,615 | $1,358,957 | +31% | -26% | TxDOT |
| A00217419 | Install/Replace Signs, Various (DISTRICTWIDE to .) | Odessa District | 6 | HJC Farms, Inc. | $899,871 | $941,372 | +5.0% | -13% | TxDOT |
| A00223523 | BRUSH REMOVAL, SH0349 (VARIOUS to VARIOUS) | Odessa District | 11 | SCR Civil Construction, LLC | $746,150 | $1,048,600 | +41% | -63% | TxDOT |
| A00222466 | BRIDGE PREVENTATIVE MAINTENANCE, FM0581 (VARIOUS to VARIOUS) | Brownwood District | 9 | Taylor Bridge LLC | $719,494 | $889,889 | +24% | -20% | TxDOT |
| A00223762 | DE-ICING SALT, US0084 (RDC to RDC) | Maintenance Division District | 1 | NSG Logistics, LLC | $488,505 | +45% | TxDOT | ||
| A00209154 | Bridge Replacement, BROWN RD (BROWN RD to .) | Laredo District | 6 | Presidio Contracting, LLC | $485,016 | $594,689 | +23% | -27% | TxDOT |
| A00206470 | Hazard Elimination & Safety, SL 499 (0.1 miles NE of Pease St. to 0.1 miles SW of Pease St.) | Pharr District | 4 | Austin Traffic Signal Construction Co., Inc. | $102,744 | $104,922 | +2.0% | -2.0% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.