Shalom Services Corporation: TxDOT bid record
Shalom Services Corporation submitted 113 bids on Texas DOT contracts in the data, from 19 FEB 2020 to 28 OCT 2026, and was the low bidder on 30 of them (27%). When it was not low, its total sat a median +29% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $11,662,152
- Latest bid
- 28 OCT 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 5 | 2 | 40% |
| 2021 | 21 | 6 | 29% |
| 2022 | 22 | 7 | 32% |
| 2023 | 10 | 2 | 20% |
| 2024 | 4 | 1 | 25% |
| 2025 | 25 | 4 | 16% |
| 2026 | 26 | 8 | 31% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Dallas District | 37 | 17 | 46% |
| Austin District | 9 | 0 | 0% |
| Tyler District | 9 | 0 | 0% |
| Yoakum District | 8 | 2 | 25% |
| Paris District | 6 | 1 | 17% |
| Fort Worth District | 6 | 2 | 33% |
| Waco District | 6 | 2 | 33% |
| Houston District | 5 | 2 | 40% |
| Bryan District | 5 | 1 | 20% |
| Lufkin District | 4 | 2 | 50% |
| Abilene District | 3 | 0 | 0% |
| Beaumont District | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sediment control fence (remove) | 506-7041 | LF | 40 | 28 (70%) | $1.00 | $1.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 56 | 25 (45%) | $3,000.00 | $5,000.00 |
| Temporary sediment control fence (install) | 506-7039 | LF | 40 | 17 (43%) | $2.50 | $4.00 |
| TMA (stationary) | 505-7001 | DAY | 53 | 14 (26%) | $300.00 | $230.00 |
| Tree removal (4" - 12" diameter) | 752-7005 | EACH | 29 | 14 (48%) | $82.50 | $150.00 |
| Mobilization (callout) | 500-7002 | EACH | 26 | 12 (46%) | $2,000.00 | $688.00 |
| Portable changeable message sign | 503-7001 | DAY | 17 | 11 (65%) | $90.00 | $100.00 |
| Excavation (channel) | 110-7002 | CY | 23 | 10 (43%) | $34.00 | $27.00 |
| Tree removal (12" - 18" diameter) | 752-7006 | EACH | 23 | 10 (43%) | $110.50 | $193.43 |
| Tree removal (18" - 24" diameter) | 752-7007 | EACH | 21 | 9 (43%) | $175.00 | $250.00 |
| Removing concrete (riprap) | 104-7006 | SY | 23 | 8 (35%) | $35.00 | $25.00 |
| Rock filter dams (remove) | 506-7011 | LF | 18 | 8 (44%) | $5.00 | $12.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Cross Plus Construction, LLC | 34 | 14 of 34 |
| Garret Shields Infrastructure | 31 | 12 of 31 |
| Icos Management, LLC | 27 | 8 of 27 |
| Pathfield Investments LLC | 22 | 11 of 22 |
| Beck-Reit & Sons, LTD. | 21 | 7 of 21 |
| BK Field Operations LLC | 17 | 14 of 17 |
| Rhino Equity, LLC | 16 | 10 of 16 |
| FNH Construction, LLC | 14 | 0 of 14 |
| Boen Landscaping & Irrigation, LLC | 14 | 13 of 14 |
| Structural Integrity Group LLC | 13 | 0 of 13 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | A00223651 | Lufkin District | BRIDGE PREVENTATIVE MAINTENANCE, US0059 (Various Locations to Various Locations) | 4 of 8 | $959,894 | +41% |
| 07 OCT 2026 | A00218294 | Fort Worth District | BRIDGE PREVENTATIVE MAINTENANCE, SH0114 (VARIOUS LOCATIONS WITHIN to Jack & Wise Counties) | 1 of 7 | $1,040,615 | Low, 31% under the second |
| 06 AUG 2026 | A00217764 | Austin District | Landscape Development, Various (Various locations Bastrop County to SL 109; SH 21; US 290; FM 1704) | 6 of 8 | $608,790 | +172% |
| 05 AUG 2026 | A00217911 | Dallas District | Bridge Maintenance, US 80 (at Big Brushy Creek to .) | 1 of 10 | $799,617 | Low, 4.0% under the second |
| 23 JUL 2026 | A00220543 | Lufkin District | BRIDGE PREVENTATIVE MAINTENANCE, US0096 (Various Locations to Various Locations) | 3 of 5 | $972,418 | +20% |
| 21 JUL 2026 | A00220735 | Tyler District | BRIDGE PREVENTATIVE MAINTENANCE, IH0020 (Various Bridges in Gregg and Rusk Co to in the Tyler District) | 3 of 3 | $799,491 | +69% |
| 21 JUL 2026 | A00220736 | Tyler District | BRIDGE PREVENTATIVE MAINTENANCE, US0287 (Various Bridges in Anderson and to Henderson Co in the Tyler District) | 4 of 4 | $548,827 | +33% |
| 21 JUL 2026 | A00222462 | Tyler District | BRIDGE PREVENTATIVE MAINTENANCE, IH0020 (Various Bridges in to Smith, Cherokee, and Wood Counties) | 3 of 5 | $724,299 | +31% |
| 08 JUL 2026 | A00218501 | Yoakum District | DEBRIS REMOVAL, BU0059R (Wharton, Calhoun, Colorado, Gonzales, to Jackson, and Lavaca Counties) | 1 of 9 | $152,900 | Low, 20% under the second |
| 11 JUN 2026 | A00220257 | Bryan District | BRIDGE RAIL RETROFIT, FM1155 (Various to Various) | 2 of 6 | $574,809 | +5.0% |
| 10 JUN 2026 | A00221424 | Bryan District | TREE REMOVAL, US 79 (FM 1940 to Leon C/L) | 3 of 7 | $791,738 | +13% |
| 10 JUN 2026 | A00220544 | Lufkin District | BRIDGE PREVENTATIVE MAINTENANCE, US0059 (Various Locations to Various Locations) | 1 of 7 | $464,740 | Low, 11% under the second |
| 10 JUN 2026 | A00219815 | Dallas District | CULVERT REPLACEMENT, FM 455 (AT FM0455 to 0.30 MILES WEST OF FM 2478) | 1 of 5 | $109,861 | Low, 4.0% under the second |
| 10 JUN 2026 | A00218499 | Yoakum District | CONCRETE SPALL REPAIR, US0059 (District Wide to .) | 3 of 7 | $193,942 | +6.0% |
| 03 JUN 2026 | A00220390 | Atlanta District | BRIDGE PREVENTATIVE MAINTENANCE, SH0008 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | 3 of 11 | $1,248,898 | +38% |
| 13 MAY 2026 | A00214602 | Abilene District | DRAINAGE IMPROVEMENT AND/OR REPAIRS, FM2320 (SH208 to FM1228) | 2 of 7 | $611,851 | +7.0% |
| 13 MAY 2026 | A00220151 | Austin District | METAL BEAM GUARD FENCE REPAIR, US0290 (VARIOUS LOCATIONS IN BASTROP to CALDWELL AND LEE COUNTIES) | 5 of 5 | $1,335,956 | +76% |
| 29 APR 2026 | A00218306 | Waco District | TREE TRIMMING, FM2114 (Various locations to In Hill County) | 1 of 6 | $486,600 | Low, 1.0% under the second |
| 16 APR 2026 | A00220064 | Paris District | CULVERT REPAIR, SH0037 (Spur 423 to SH 37) | 6 of 8 | $182,500 | +50% |
| 08 APR 2026 | A00219520 | Waco District | MISCELLANEOUS CONCRETE REPAIR, US0084 (VARIOUS LOCATIONS to Across the Waco District) | 1 of 8 | $755,540 | Low, 19% under the second |
| 08 APR 2026 | A00209284 | Paris District | Bridge Maintenance, Various (Various Locations to .) | 10 of 12 | $1,198,550 | +63% |
| 18 MAR 2026 | A00214342 | San Antonio District | EROSION REPAIR, FM3175 (AT W PRONG ATASCOSA RIVER to AT W PRONG ATASCOSA RIVER) | 7 of 7 | $337,055 | +367% |
| 18 MAR 2026 | A00218464 | San Antonio District | EROSION REPAIR, FM2438 (AT MILL CREEK to AT MILL CREEK) | 7 of 7 | $155,957 | +223% |
| 11 MAR 2026 | A00218809 | Dallas District | BRIDGE PREVENTATIVE MAINTENANCE, IH0045 (Various Roadways in the to Ellis County Maintenance Section) | 4 of 12 | $399,380 | +8.0% |
| 05 FEB 2026 | A00189583 | Yoakum District | Removal And/Or Replacement And/Or Disposal, DUPONT RD (VICTORIA BARGE CANAL to STR #AA02-82-001 (DUPONT RD)) | 1 of 3 | $497,178 | Low, 68% under the second |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.