TxDOT letting results, March 18, 2026
14 contracts let by Texas DOT on March 18, 2026, $4,324,651 in low bids, a median of 3 bidders per contract. On the 14 with an engineer's estimate, the low bid came in under it 8 times; median low bid -1.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 14
- Low bids, total
- $4,324,651
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00218944 | RAISED PAVEMENT MARKERS, IH0040 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | Amarillo District | 3 | L&L Company | $640,394 | $663,725 | +4.0% | +4.0% | TxDOT |
| A00219505 | CABLE BARRIER REPAIR, IH0030 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | Atlanta District | 2 | H. V. Caver, Inc. | $634,438 | $738,470 | +16% | +4.0% | TxDOT |
| A00219506 | CABLE BARRIER REPAIR, IH0020 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | Atlanta District | 3 | BK Field Operations LLC | $597,215 | $734,625 | +23% | +4.0% | TxDOT |
| A00219575 | THERMOPLASTIC PAVEMENT MARKINGS, US0059 (Various Locations to District Wide) | Lufkin District | 6 | Striping Technology, L.P. | $558,500 | $569,750 | +2.0% | -5.0% | TxDOT |
| A00218067 | REFLECTORIZED PAVEMENT MARKINGS & MARKERS, US0380 (Various Locations In to Wise and Jack Counties) | Fort Worth District | 3 | The Confidence Group, Inc | $369,260 | $377,400 | +2.0% | -9.0% | TxDOT |
| A00218375 | MISCELLANEOUS CONCRETE REPAIR, US0287 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | Amarillo District | 2 | Nortex Concrete Lift & Stabilization, Inc. | $272,385 | $364,356 | +34% | -8.0% | TxDOT |
| A00219212 | MOWING HIGHWAY RIGHT OF WAY, US0059 (SHELBY COUNTY to VARIOUS LOCATIONS) | Lufkin District | 3 | Ace Contractors, Inc. | $269,099 | $278,329 | +3.0% | +5.0% | TxDOT |
| A00218938 | METAL BEAM GUARD FENCE REPAIR, US0059 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | Atlanta District | 2 | Austin Barricade Company, L.L.C. | $232,465 | $306,050 | +32% | +16% | TxDOT |
| A00219097 | MOWING HIGHWAY RIGHT OF WAY, US0096 (SABINE COUNTY to VARIOUS LOCATIONS) | Lufkin District | 3 | Ace Contractors, Inc. | $223,706 | $243,342 | +9.0% | +2.0% | TxDOT |
| A00218937 | METAL BEAM GUARD FENCE REPAIR, US0059 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | Atlanta District | 3 | Catocon, Inc. | $180,035 | $223,170 | +24% | -2.0% | TxDOT |
| A00218939 | METAL BEAM GUARD FENCE REPAIR, US0271 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | Atlanta District | 2 | Catocon, Inc. | $173,785 | $197,590 | +14% | -5.0% | TxDOT |
| A00214342 | EROSION REPAIR, FM3175 (AT W PRONG ATASCOSA RIVER to AT W PRONG ATASCOSA RIVER) | San Antonio District | 7 | Diamond R Contracting, LLC | $72,204 | $89,441 | +24% | -30% | TxDOT |
| A00217696 | LANDSCAPE MAINTENANCE, US0271 (US0271/SH0155 to US0271/SH0155) | Atlanta District | 2 | KJRM General Contractors, LLC | $52,820 | $53,300 | +1.0% | -34% | TxDOT |
| A00218464 | EROSION REPAIR, FM2438 (AT MILL CREEK to AT MILL CREEK) | San Antonio District | 7 | BK Field Operations LLC | $48,346 | $63,916 | +32% | -1.0% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.