Diamond R Contracting, LLC: TxDOT bid record
Diamond R Contracting, LLC submitted 28 bids on Texas DOT contracts in the data, from 27 JUN 2023 to 22 JUL 2026, and was the low bidder on 7 of them (25%). When it was not low, its total sat a median +24% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $1,260,531
- Latest bid
- 22 JUL 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2023 | 3 | 0 | 0% |
| 2024 | 3 | 1 | 33% |
| 2025 | 17 | 5 | 29% |
| 2026 | 5 | 1 | 20% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Construction exits (remove) | 506-7024 | SY | 19 | 19 (100%) | $1.00 | $10.00 |
| Soil ret BLKT(SL_mod_clay_short) | 169-7001 | SY | 17 | 16 (94%) | $1.00 | $2.21 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 21 | 14 (67%) | $1.00 | $1.40 |
| Biodegradable erosion control logs (install) (12") | 506-7044 | LF | 21 | 14 (67%) | $1.00 | $6.00 |
| Gabion mattresses (galvanized)(12 in) | 459-7007 | SY | 16 | 13 (81%) | $100.00 | $135.00 |
| Compost manuf topsoil (4") | 161-7002 | SY | 18 | 11 (61%) | $1.00 | $2.30 |
| Flowable backfill | 401-7001 | CY | 12 | 8 (67%) | $200.00 | $350.00 |
| Broadcast seed (permanent_rural_clay) | 164-7002 | SY | 11 | 8 (73%) | $1.00 | $1.00 |
| Riprap (stone common)(dry)(6 in) | 432-7029 | CY | 13 | 4 (31%) | $150.00 | $246.22 |
| Broadcast seed (permanent_urban_clay) | 164-7004 | SY | 7 | 4 (57%) | $1.00 | $1.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 25 | 2 (8%) | $3,000.00 | $5,000.00 |
| Tree trimming / brush removal(channels) | 752-7003 | ACRE | 14 | 2 (14%) | $37,500 | $2,500.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| BK Field Operations LLC | 18 | 11 of 18 |
| Texas Road Construction, LLC | 10 | 2 of 10 |
| Salinas Construction Technologies, LTD. | 8 | 0 of 8 |
| Icos Management, LLC | 8 | 1 of 8 |
| Garret Shields Infrastructure | 8 | 3 of 8 |
| Beck-Reit & Sons, LTD. | 8 | 3 of 8 |
| Rhino Equity, LLC | 7 | 0 of 7 |
| Taylor Contracting LLC | 7 | 2 of 7 |
| Aad Contracting Inc. | 7 | 1 of 7 |
| Taylor Bridge LLC | 7 | 5 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 22 JUL 2026 | A00220027 | San Antonio District | EROSION REPAIR, FM2673 (FM 2673 to AT DRAW) | 2 of 4 | $71,266 | +22% |
| 22 JUL 2026 | A00219576 | San Antonio District | EROSION REPAIR, UA0090 (US90A to at Darst Creek) | 4 of 4 | $230,198 | +31% |
| 22 JUL 2026 | A00219780 | San Antonio District | BRIDGE SCOUR REPAIR, US0181 (AT KICASTER CREEK to AT KICASTER CREEK) | 2 of 2 | $57,623 | +12% |
| 18 MAR 2026 | A00214342 | San Antonio District | EROSION REPAIR, FM3175 (AT W PRONG ATASCOSA RIVER to AT W PRONG ATASCOSA RIVER) | 1 of 7 | $72,204 | Low, 24% under the second |
| 18 MAR 2026 | A00218464 | San Antonio District | EROSION REPAIR, FM2438 (AT MILL CREEK to AT MILL CREEK) | 3 of 7 | $70,503 | +46% |
| 17 DEC 2025 | A00217857 | San Antonio District | BRIDGE SCOUR REPAIR, FM0775 (UNNAMED DRAW to UNNAMED DRAW) | 2 of 8 | $68,936 | +28% |
| 17 DEC 2025 | A00214344 | San Antonio District | EROSION REPAIR, FM0775 (AT ELM CREEK to AT ELM CREEK) | 4 of 5 | $45,484 | +36% |
| 17 DEC 2025 | A00214340 | San Antonio District | EROSION REPAIR, FM2439 (AT UNNAMED DRAW to AT UNNAMED DRAW) | 3 of 6 | $39,583 | +40% |
| 12 NOV 2025 | A00214337 | San Antonio District | EROSION REPAIR, FM2252 (FM 2252 to AT DRAIN) | 1 of 7 | $50,807 | Low, 10% under the second |
| 12 NOV 2025 | A00216189 | San Antonio District | EROSION REPAIR, US0087 (AT GUNN BRANCH to AT GUNN BRANCH) | 1 of 6 | $90,862 | Low, 6.0% under the second |
| 12 NOV 2025 | A00214345 | San Antonio District | EROSION REPAIR, FM2505 (AT UNNAMED DRAW to AT UNNAMED DRAW) | 1 of 5 | $53,230 | Low, 21% under the second |
| 17 SEP 2025 | A00217164 | San Antonio District | EROSION REPAIR, SH0016 (SH 16 to AT NORTH PRONG MEDINA RIVER) | 2 of 3 | $93,942 | +2.0% |
| 17 SEP 2025 | A00217528 | San Antonio District | DEBRIS REMOVAL, IH0035 (VARIOUS LOCATIONS IN to SAN ANTONIO DISTRICT) | 4 of 11 | $667,472 | +13% |
| 20 AUG 2025 | A00215649 | San Antonio District | PICNIC AREA MAINTENANCE, SH0046 (VARIOUS LOCATIONS to IN COMAL AND GUADALUPE COUNTIES) | 4 of 6 | $216,054 | +19% |
| 20 AUG 2025 | A00214343 | San Antonio District | EROSION REPAIR, US0090 (AT WEST PRONG OF MILL CREEK to AT WEST PRONG OF MILL CREEK) | 3 of 6 | $80,052 | +31% |
| 20 AUG 2025 | A00214338 | San Antonio District | EROSION REPAIR, FM0306 (AT UPRR to AT UNNAMED DRAW) | 4 of 7 | $130,489 | +58% |
| 20 FEB 2025 | A00189581 | San Antonio District | EROSION REPAIR, FM0306 (AT SUCHE CREEK to AND AT POTTER CREEK) | 3 of 13 | $190,223 | +41% |
| 20 FEB 2025 | A00210463 | San Antonio District | EROSION REPAIR, SH0041 (SH 41 AT UNNAMED DRAW to AND SH 16 AT DREAN CREEK) | 5 of 11 | $84,674 | +22% |
| 20 FEB 2025 | A00185435 | San Antonio District | EROSION REPAIR, IH0035 (IH 35 AT YORK CRK BRANCH, FM 3009 AT BRA to AND US90A AT UNNAMED DRAW) | 2 of 12 | $142,580 | +42% |
| 20 FEB 2025 | A00212920 | San Antonio District | BRIDGE PREVENTATIVE MAINTENANCE, US0281 (US 281, etc to IH 37, etc) | 5 of 14 | $105,060 | +56% |
| 16 JAN 2025 | A00155357 | San Antonio District | BRIDGE PREVENTATIVE MAINTENANCE, FM1535 (FM 1535 AT UNNAMED DRAW to AND SH 16 AT COMANCHE CREEK) | 1 of 8 | $218,588 | Low, 5.0% under the second |
| 16 JAN 2025 | A00206347 | San Antonio District | EROSION REPAIR, FM2200 (FM 2200 to AT PARKER CREEK NO. 3) | 1 of 8 | $149,921 | Low, 16% under the second |
| 09 JUL 2024 | 07243026 | San Antonio District | SH 218 Construct pedestrian infrastructure from 0.11 MILES WEST OF SL 1604 to 0.11 MILES EAST OF SL 1604 | 5 of 10 | $532,331 | +24% |
| 03 MAY 2024 | 05243241 | San Antonio District | US 90 Landscape development from 0.27 MILES EAST OF 36TH ST to 1.66 MILES WEST OF 36TH ST | 4 of 5 | $544,001 | +12% |
| 02 MAY 2024 | 05243039 | San Antonio District | CS Construct pedestrian infrastructure from D L VEST STREET to TO FM 1346 SIDEWALKS | 1 of 9 | $624,919 | Low, 10% under the second |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.