Salinas Construction Technologies, LTD.: TxDOT bid record
Salinas Construction Technologies, LTD. submitted 118 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 07 OCT 2026, and was the low bidder on 12 of them (10%). When it was not low, its total sat a median +28% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $33,331,058
- Latest bid
- 07 OCT 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 35 | 1 | 3% |
| 2021 | 36 | 5 | 14% |
| 2022 | 7 | 2 | 29% |
| 2023 | 4 | 2 | 50% |
| 2024 | 8 | 1 | 13% |
| 2025 | 14 | 1 | 7% |
| 2026 | 14 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| San Antonio District | 41 | 6 | 15% |
| Corpus Christi District | 33 | 3 | 9% |
| Abilene District | 11 | 1 | 9% |
| Austin District | 10 | 2 | 20% |
| San Angelo District | 7 | 0 | 0% |
| Laredo District | 5 | 0 | 0% |
| Odessa District | 3 | 0 | 0% |
| Bryan District | 3 | 0 | 0% |
| Edwards | 2 | 0 | 0% |
| Brownwood District | 1 | 0 | 0% |
| El Paso District | 1 | 0 | 0% |
| Yoakum District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 118 | 49 (42%) | $2,079.18 | $5,000.00 |
| Preparing row | 100-7002 | STA | 60 | 24 (40%) | $1,071.55 | $2,750.00 |
| Set (type II) (18 in) (RCP) (6: 1) (P) | 467-7308 | EACH | 28 | 12 (43%) | $1,169.62 | $1,300.00 |
| Temporary sediment control fence (install) | 506-7039 | LF | 79 | 11 (14%) | $3.73 | $4.00 |
| Cem stabil BKFL | 400-7010 | CY | 43 | 9 (21%) | $169.72 | $200.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 79 | 8 (10%) | $1.13 | $1.00 |
| Set (type II) (24 in) (RCP) (6: 1) (P) | 467-7328 | EACH | 18 | 7 (39%) | $1,461.45 | $1,900.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 49 | 6 (12%) | $3,013.74 | $3,245.00 |
| Eliminating existing pavement marking & markers (4") | 677-6001 | LF | 38 | 6 (16%) | $0.82 | $0.60 |
| FL BS (compacted in place)(tya GR1-2)(final pos) | 247-7176 | CY | 21 | 6 (29%) | $79.62 | $89.68 |
| TMA (stationary) | 505-7001 | DAY | 92 | 5 (5%) | $294.71 | $230.00 |
| Excavation (roadway) | 110-7001 | CY | 67 | 5 (7%) | $16.93 | $20.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Hunter Industries, LTD. | 35 | 18 of 35 |
| CK Newberry, LLC | 33 | 18 of 33 |
| Acme Bridge Company, Inc. | 28 | 14 of 28 |
| J. Carroll Weaver, Inc. | 25 | 16 of 25 |
| FNH Construction, LLC | 23 | 6 of 23 |
| Tierra Lease Service, LLC | 20 | 15 of 20 |
| Angel Brothers Holdings Corp. | 20 | 8 of 20 |
| Relmco, Inc. | 20 | 12 of 20 |
| Dean Word Company, LTD. | 16 | 9 of 16 |
| J E Construction Services, LLC | 14 | 9 of 14 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 OCT 2026 | A00209154 | Laredo District | Bridge Replacement, BROWN RD (BROWN RD to .) | 4 of 6 | $616,739 | +27% |
| 06 OCT 2026 | A00195149 | Corpus Christi District | Rehabilitate Existing Roadway, FM 791 (FM 1344 to FM 887) | 5 of 7 | $20,728,808 | +16% |
| 06 AUG 2026 | A00209034 | Corpus Christi District | Rehabilitate Existing Roadway, US 281 (Tullos St to N of SH 72 North) | 6 of 8 | $12,180,547 | +25% |
| 05 AUG 2026 | A00196471 | Corpus Christi District | Roadway Rehabilitation/Reconstruction With No Added Capacity, FM 81 (US 181 to FM 1144) | 5 of 9 | $9,964,467 | +19% |
| 17 JUN 2026 | A00220716 | San Antonio District | REHABILITATION OF EXISTING ROADWAY, MR0681 (PARKING LOT NORTH OF N MAIN DR to N COTTAGE RD) | 2 of 3 | $215,692 | +10% |
| 03 JUN 2026 | A00193431 | San Antonio District | Hazard Elimination & Safety, US 281 (SH 97 to FM 1334) | 3 of 10 | $1,093,187 | +6.0% |
| 18 MAR 2026 | A00214342 | San Antonio District | EROSION REPAIR, FM3175 (AT W PRONG ATASCOSA RIVER to AT W PRONG ATASCOSA RIVER) | 6 of 7 | $202,473 | +180% |
| 18 MAR 2026 | A00218464 | San Antonio District | EROSION REPAIR, FM2438 (AT MILL CREEK to AT MILL CREEK) | 6 of 7 | $132,477 | +174% |
| 04 MAR 2026 | A00197420 | San Antonio District | Rehabilitate Existing Roadway, FM 2790 (FM 471 to Medina/Atascosa C/L) | 3 of 9 | $11,999,615 | +2.0% |
| 04 MAR 2026 | A00189338 | San Antonio District | Resurface Roadway, SH 173 (SH 132 to CR 7711) | 11 of 11 | $2,626,076 | +72% |
| 04 MAR 2026 | A00209031 | Corpus Christi District | Rehabilitate Existing Roadway, IH 37 (SH 234 to Cooper Rd (CR54)) | 5 of 7 | $3,265,346 | +45% |
| 05 FEB 2026 | A00186405 | Corpus Christi District | Bridge Replacement, US 181 (0.6 MI S of CR 1206 to 0.9 MI S of CR 1206) | 6 of 12 | $2,156,548 | +19% |
| 07 JAN 2026 | A00211280 | Laredo District | State Park Improvements, Various (CHAPARRAL WMA DR. to .) | 7 of 8 | $941,673 | +32% |
| 06 JAN 2026 | A00218600 | San Antonio District | BASE REPAIR WITH SEAL COAT AND/OR OVERLAY, US0181 (VARIOUS LOCATIONS to VARIOUS LOCATIONS) | 5 of 5 | $3,598,323 | +90% |
| 17 DEC 2025 | A00217857 | San Antonio District | BRIDGE SCOUR REPAIR, FM0775 (UNNAMED DRAW to UNNAMED DRAW) | 8 of 8 | $114,962 | +114% |
| 03 DEC 2025 | A00206784 | San Antonio District | Hazard Elimination & Safety, US 181 (At Shannon Ridge Drive to .) | 4 of 4 | $288,000 | +56% |
| 02 DEC 2025 | A00188143 | San Antonio District | Rehabilitate Existing Roadway, FM 1344 (CR 209 to Wilson/Karnes County Line) | 3 of 8 | $11,800,154 | +22% |
| 05 NOV 2025 | A00209917 | San Antonio District | Hazard Elimination & Safety, SH 16 (1000 ft North of Rockport Rd to Leon Creek) | 12 of 12 | $1,988,387 | +76% |
| 05 SEP 2025 | A00197415 | San Antonio District | Resurface Roadway, FM 1582 (SH 85 to 0.7 Mi. South of Kothman Rd) | 8 of 8 | $3,685,159 | +50% |
| 04 SEP 2025 | A00215070 | Corpus Christi District | REHABILITATION OF EXISTING ROADWAY, IH0037 (West Frontage RD PR 2024 to CR 1726) | 7 of 10 | $1,835,656 | +26% |
| 04 SEP 2025 | A00190970 | Corpus Christi District | Bridge Replacement, COUNTY ROAD 18 (CR 18 Drainage Ditch to 0.55MI E of FM 892) | 6 of 9 | $1,634,908 | +16% |
| 20 AUG 2025 | A00214343 | San Antonio District | EROSION REPAIR, US0090 (AT WEST PRONG OF MILL CREEK to AT WEST PRONG OF MILL CREEK) | 6 of 6 | $146,366 | +140% |
| 20 AUG 2025 | A00214338 | San Antonio District | EROSION REPAIR, FM0306 (AT UPRR to AT UNNAMED DRAW) | 6 of 7 | $140,881 | +71% |
| 16 JAN 2025 | A00155357 | San Antonio District | BRIDGE PREVENTATIVE MAINTENANCE, FM1535 (FM 1535 AT UNNAMED DRAW to AND SH 16 AT COMANCHE CREEK) | 8 of 8 | $498,144 | +128% |
| 16 JAN 2025 | A00206347 | San Antonio District | EROSION REPAIR, FM2200 (FM 2200 to AT PARKER CREEK NO. 3) | 8 of 8 | $388,915 | +159% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.