TxDOT contract A00209031 bid tabulation

Rehabilitate Existing Roadway, IH 37 (SH 234 to Cooper Rd (CR54)). Let by Texas DOT on March 4, 2026, San Patricio, Corpus Christi District. 7 bids received; low bid $2,258,368 by Anderson Columbia Co., Inc., -4.6% against the engineer's estimate of $2,366,695.

Owner
Texas DOT
Letting
04 MAR 2026
Pay items
64
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Anderson Columbia Co., Inc.$2,258,368Low-5.0%
2Hunter Industries, LTD.$2,624,511+16%+11%
3J. Carroll Weaver, Inc.$2,639,651+17%+12%
4J E Construction Services, LLC$3,028,072+34%+28%
5Salinas Construction Technologies, LTD.$3,265,346+45%+38%
6CK Newberry, LLC$3,270,231+45%+38%
7Matagorda Construction & Materials$3,586,046+59%+52%
TxDOT contract A00209031: bids by rank

Engineer's estimate: $2,366,695.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Anderson Columbia Co., Inc.2. Hunter Industries, LTD.3. J. Carroll Weaver, Inc.4. J E Construction Services, LLC5. Salinas Construction Technologies, LTD.6. CK Newberry, LLC
1Preparing row (100-7002)STA118.36$250.00$100.00$303.05$110.00$650.00$265.46$500.00
2Removing concrete (riprap) (104-7006)SY91$36.00$20.00$22.89$26.63$25.00$23.62$50.00
3Excavation (roadway) (110-7001)CY6,533$15.00$18.00$17.39$11.68$15.00$15.76$15.00
4Subgr widen (DC) (112-7002)STA84$350.00$180.00$244.20$127.99$310.00$460.63$350.00
5Backfill (type A or B) (134-7004)STA101$175.00$160.00$103.75$103.71$250.00$301.00$275.00
6Geogrid base reinforcement (type 2) (250-7002)SY39,856$1.15$0.90$1.03$0.78$1.00$1.62$1.00
7Lime (com or QK)(slurry) (260-7005)TON604$300.00$260.00$363.80$375.12$395.00$384.62$350.00
8Lime TRT(subgrade)(6") (260-7024)SY40,512$3.50$3.25$2.75$2.43$3.00$2.46$2.00
9Cem TRT(PLNT MX)(CL L)(tya)(GR1-2)(6") (276-7117)SY2,244$17.00$19.00$23.11$33.83$28.00$35.28$35.00
10Cem TRT(PLNT MX)(CL L)(tya)(GR1-2)(8") (276-7121)SY28,726$22.00$22.00$31.01$32.13$34.00$33.01$40.00
11Cem TRT(PLNT MX)(CL L)(tya)(GR1-2)(15") (276-7420)SY5,289$42.00$50.00$58.97$62.72$71.00$66.66$65.00
12Prime coat (MC-30) (310-7004)GAL7,311$5.50$5.00$4.40$3.86$4.00$6.20$5.00
13Aggregate (type-PB, GR-3 or 3S)(sac-B) (316-7209)CY1,191$129.00$95.00$88.47$149.03$88.00$196.13$120.00
14Aggregate (type-PB, GR-4S or 4)(sac-B) (316-7212)CY420$160.00$225.00$124.34$197.42$90.00$196.13$150.00
15Asphalt (multi option) (316-7263)GAL25,012$4.00$2.75$3.18$3.20$4.00$3.97$4.00
16Cem stabil BKFL (400-7010)CY1.50$200.00$325.00$274.84$132.99$94.00$1,580.52$2,000.00
17Riprap (mow strip)(4 in) (432-7013)CY50$630.00$585.00$834.43$583.00$650.00$714.49$7.25
18RC pipe (CL III)(18 in) (464-7003)LF90$110.00$145.00$77.59$73.51$130.00$146.85$115.00
19Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH6$1,900.00$2,260.00$2,355.72$1,815.00$3,000.00$1,170.97$4,000.00
20Clean existing culverts (480-7001)EACH6$1,700.00$707.00$1,687.68$1,320.00$1,700.00$2,451.97$3,000.00
21Removing structure (pipe) (496-7007)LF78$30.00$21.00$21.25$16.70$22.00$25.95$50.00
22Mobilization (500-7001)LS1$210,000$124,500$202,544$111,406$243,000$260,726$300,000
23Barricades, signs and traffic handling (502-7001)MO6$5,000.00$5,040.00$2,018.58$2,420.00$5,000.00$1,139.52$5,000.00
24Portable changeable message sign (503-7002)EACH5$10,000$10,000$541.25$3,850.00$5,000.00$11,281$7,500.00
25TMA (mobile operation) (505-7003)DAY4$250.00$547.00$108.25$220.00$670.00$975.04$100.00
26Excavation (erosion & sediment control, in place) (506-7025)CY10$100.00$55.00$77.00$8.39$18.00$67.50$100.00
27Temporary sediment control fence (install) (506-7039)LF620$5.00$6.10$9.00$2.86$6.00$4.56$10.00
28Temporary sediment control fence (remove) (506-7041)LF620$2.00$1.95$2.50$2.86$3.00$1.26$3.00
29Biodegradable erosion control logs (install) (12") (506-7044)LF120$8.00$11.00$9.00$49.50$11.00$13.41$10.00
30Biodegradable erosion control logs (remove) (506-7046)LF120$3.00$2.08$2.50$2.20$3.00$3.96$3.00
31Concrete curb (type II) (529-7002)LF494$29.00$20.00$17.96$25.30$14.00$34.21$35.00
32Intersections (ACP) (530-7002)SY1,796$33.00$29.00$43.40$33.40$70.00$74.80$50.00
33Concrete directional island (536-7004)SY91$130.00$117.00$141.20$148.50$130.00$138.73$150.00
34Metal W-beam guard fence (timber post) (540-7001)LF675$26.00$28.00$24.64$27.10$39.00$26.02$25.00
35Metal beam guard fence trans (thrie-beam) (540-7005)EACH2$2,900.00$1,990.00$2,271.00$1,948.10$2,000.00$1,908.18$1,800.00
36Metal beam guard fence trans (anchor plate) (540-7029)EACH2$1,100.00$1,440.00$1,283.00$1,411.30$900.00$1,395.78$1,300.00
37Remove metal beam guard fence (542-7001)LF600$2.90$4.50$4.00$4.40$3.00$4.36$4.00
38Guardrail end treatment (move & reset) (544-7002)EACH2$650.00$1,730.00$1,546.25$1,701.70$1,300.00$1,672.19$1,600.00
39Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH25$750.00$897.00$800.00$880.00$900.00$849.73$800.00
40Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH7$800.00$1,090.00$975.00$1,072.50$1,100.00$1,033.48$975.00
41Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH2$975.00$1,430.00$1,275.00$1,402.50$1,400.00$1,348.48$1,275.00
42Remove SM RD SN sup&AM (644-7073)EACH29$110.00$95.00$85.00$93.50$430.00$98.98$85.00
43Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH17$45.00$67.00$60.00$66.00$70.00$72.73$60.00
44Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059)EACH20$100.00$107.00$95.00$104.50$110.00$109.48$95.00
45Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF1,790$0.50$0.64$0.58$0.64$1.00$0.66$0.60
46Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF21,662$0.50$0.55$0.48$0.53$1.00$0.52$0.50
47Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF52$25.00$18.00$16.00$17.60$18.00$18.67$16.00
48Work zone pavement marking non-removing(W)36"(yld tri) (662-7032)EACH12$21.00$28.00$25.00$27.50$29.00$34.36$25.00
49Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF10,784$0.55$0.55$0.48$0.53$1.00$0.52$0.50
50Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH213$2.00$1.24$1.06$1.11$4.00$1.40$1.25
51Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH1,090$1.80$1.24$1.06$1.11$4.00$1.25$1.25
52Reflectorized profile pavement marking type I(W)6"(solid)(090MIL) (666-7265)LF20,614$0.50$1.00$0.88$0.97$1.00$0.93$0.90
53Reflectorized profile pavement marking type I(Y)6"(solid)(090MIL) (666-7269)LF10,725$0.55$1.10$0.96$1.06$1.00$1.03$1.00
54Reflectorized profile pavement marking type I(Y)6"(broken)(090MIL) (666-7273)LF2,870$0.55$1.25$1.10$1.21$1.00$1.19$1.10
55Prefabricated PM type C (W)(24")(solid) (668-7089)LF48$15.00$18.00$16.00$17.60$18.00$18.83$16.00
56Prefabricated PM type C (W)(36")(yld tri) (668-7111)EACH12$35.00$39.00$35.00$38.50$41.00$52.96$35.00
57Reflectorized pavement marker type II-A-A (672-7004)EACH208$4.50$8.40$7.50$8.25$8.00$8.34$7.50
58Reflectorized pavement marker type II-C-R (672-7006)EACH26$5.00$8.40$7.50$8.25$8.00$11.62$7.50
59Tree removal (4" - 12" diameter) (752-7005)EACH2$300.00$224.00$642.00$605.96$295.00$3,132.20$2,500.00
60Tree removal (12" - 18" diameter) (752-7006)EACH1$400.00$280.00$802.50$727.14$590.00$3,288.45$3,100.00
61Drain inlet cleaning (764-7001)EACH6$100.00$561.00$520.97$2,305.97$320.00$1,507.62$5,000.00
62Storm sewer cleaning (pipe)(19"-24"diameter) (764-7008)LF178$6.50$15.00$20.84$16.50$13.00$50.82$50.00
63Storm sewer cleaning (pipe)(31"-36"diameter) (764-7010)LF97$7.50$17.50$20.84$16.50$20.00$55.95$60.00
64Storm sewer cleaning (pipe)(37"-42"diameter) (764-7011)LF1,492$8.00$20.00$10.42$16.50$10.00$60.63$50.00
TxDOT contract A00209031: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of March 4, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy