TxDOT contract A00209031 bid tabulation
Rehabilitate Existing Roadway, IH 37 (SH 234 to Cooper Rd (CR54)). Let by Texas DOT on March 4, 2026, San Patricio, Corpus Christi District. 7 bids received; low bid $2,258,368 by Anderson Columbia Co., Inc., -4.6% against the engineer's estimate of $2,366,695.
- Owner
- Texas DOT
- Letting
- 04 MAR 2026
- Pay items
- 64
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Anderson Columbia Co., Inc. | $2,258,368 | Low | -5.0% |
| 2 | Hunter Industries, LTD. | $2,624,511 | +16% | +11% |
| 3 | J. Carroll Weaver, Inc. | $2,639,651 | +17% | +12% |
| 4 | J E Construction Services, LLC | $3,028,072 | +34% | +28% |
| 5 | Salinas Construction Technologies, LTD. | $3,265,346 | +45% | +38% |
| 6 | CK Newberry, LLC | $3,270,231 | +45% | +38% |
| 7 | Matagorda Construction & Materials | $3,586,046 | +59% | +52% |
Engineer's estimate: $2,366,695.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Anderson Columbia Co., Inc. | 2. Hunter Industries, LTD. | 3. J. Carroll Weaver, Inc. | 4. J E Construction Services, LLC | 5. Salinas Construction Technologies, LTD. | 6. CK Newberry, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 118.36 | $250.00 | $100.00 | $303.05 | $110.00 | $650.00 | $265.46 | $500.00 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 91 | $36.00 | $20.00 | $22.89 | $26.63 | $25.00 | $23.62 | $50.00 |
| 3 | Excavation (roadway) (110-7001) | CY | 6,533 | $15.00 | $18.00 | $17.39 | $11.68 | $15.00 | $15.76 | $15.00 |
| 4 | Subgr widen (DC) (112-7002) | STA | 84 | $350.00 | $180.00 | $244.20 | $127.99 | $310.00 | $460.63 | $350.00 |
| 5 | Backfill (type A or B) (134-7004) | STA | 101 | $175.00 | $160.00 | $103.75 | $103.71 | $250.00 | $301.00 | $275.00 |
| 6 | Geogrid base reinforcement (type 2) (250-7002) | SY | 39,856 | $1.15 | $0.90 | $1.03 | $0.78 | $1.00 | $1.62 | $1.00 |
| 7 | Lime (com or QK)(slurry) (260-7005) | TON | 604 | $300.00 | $260.00 | $363.80 | $375.12 | $395.00 | $384.62 | $350.00 |
| 8 | Lime TRT(subgrade)(6") (260-7024) | SY | 40,512 | $3.50 | $3.25 | $2.75 | $2.43 | $3.00 | $2.46 | $2.00 |
| 9 | Cem TRT(PLNT MX)(CL L)(tya)(GR1-2)(6") (276-7117) | SY | 2,244 | $17.00 | $19.00 | $23.11 | $33.83 | $28.00 | $35.28 | $35.00 |
| 10 | Cem TRT(PLNT MX)(CL L)(tya)(GR1-2)(8") (276-7121) | SY | 28,726 | $22.00 | $22.00 | $31.01 | $32.13 | $34.00 | $33.01 | $40.00 |
| 11 | Cem TRT(PLNT MX)(CL L)(tya)(GR1-2)(15") (276-7420) | SY | 5,289 | $42.00 | $50.00 | $58.97 | $62.72 | $71.00 | $66.66 | $65.00 |
| 12 | Prime coat (MC-30) (310-7004) | GAL | 7,311 | $5.50 | $5.00 | $4.40 | $3.86 | $4.00 | $6.20 | $5.00 |
| 13 | Aggregate (type-PB, GR-3 or 3S)(sac-B) (316-7209) | CY | 1,191 | $129.00 | $95.00 | $88.47 | $149.03 | $88.00 | $196.13 | $120.00 |
| 14 | Aggregate (type-PB, GR-4S or 4)(sac-B) (316-7212) | CY | 420 | $160.00 | $225.00 | $124.34 | $197.42 | $90.00 | $196.13 | $150.00 |
| 15 | Asphalt (multi option) (316-7263) | GAL | 25,012 | $4.00 | $2.75 | $3.18 | $3.20 | $4.00 | $3.97 | $4.00 |
| 16 | Cem stabil BKFL (400-7010) | CY | 1.50 | $200.00 | $325.00 | $274.84 | $132.99 | $94.00 | $1,580.52 | $2,000.00 |
| 17 | Riprap (mow strip)(4 in) (432-7013) | CY | 50 | $630.00 | $585.00 | $834.43 | $583.00 | $650.00 | $714.49 | $7.25 |
| 18 | RC pipe (CL III)(18 in) (464-7003) | LF | 90 | $110.00 | $145.00 | $77.59 | $73.51 | $130.00 | $146.85 | $115.00 |
| 19 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 6 | $1,900.00 | $2,260.00 | $2,355.72 | $1,815.00 | $3,000.00 | $1,170.97 | $4,000.00 |
| 20 | Clean existing culverts (480-7001) | EACH | 6 | $1,700.00 | $707.00 | $1,687.68 | $1,320.00 | $1,700.00 | $2,451.97 | $3,000.00 |
| 21 | Removing structure (pipe) (496-7007) | LF | 78 | $30.00 | $21.00 | $21.25 | $16.70 | $22.00 | $25.95 | $50.00 |
| 22 | Mobilization (500-7001) | LS | 1 | $210,000 | $124,500 | $202,544 | $111,406 | $243,000 | $260,726 | $300,000 |
| 23 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $5,000.00 | $5,040.00 | $2,018.58 | $2,420.00 | $5,000.00 | $1,139.52 | $5,000.00 |
| 24 | Portable changeable message sign (503-7002) | EACH | 5 | $10,000 | $10,000 | $541.25 | $3,850.00 | $5,000.00 | $11,281 | $7,500.00 |
| 25 | TMA (mobile operation) (505-7003) | DAY | 4 | $250.00 | $547.00 | $108.25 | $220.00 | $670.00 | $975.04 | $100.00 |
| 26 | Excavation (erosion & sediment control, in place) (506-7025) | CY | 10 | $100.00 | $55.00 | $77.00 | $8.39 | $18.00 | $67.50 | $100.00 |
| 27 | Temporary sediment control fence (install) (506-7039) | LF | 620 | $5.00 | $6.10 | $9.00 | $2.86 | $6.00 | $4.56 | $10.00 |
| 28 | Temporary sediment control fence (remove) (506-7041) | LF | 620 | $2.00 | $1.95 | $2.50 | $2.86 | $3.00 | $1.26 | $3.00 |
| 29 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 120 | $8.00 | $11.00 | $9.00 | $49.50 | $11.00 | $13.41 | $10.00 |
| 30 | Biodegradable erosion control logs (remove) (506-7046) | LF | 120 | $3.00 | $2.08 | $2.50 | $2.20 | $3.00 | $3.96 | $3.00 |
| 31 | Concrete curb (type II) (529-7002) | LF | 494 | $29.00 | $20.00 | $17.96 | $25.30 | $14.00 | $34.21 | $35.00 |
| 32 | Intersections (ACP) (530-7002) | SY | 1,796 | $33.00 | $29.00 | $43.40 | $33.40 | $70.00 | $74.80 | $50.00 |
| 33 | Concrete directional island (536-7004) | SY | 91 | $130.00 | $117.00 | $141.20 | $148.50 | $130.00 | $138.73 | $150.00 |
| 34 | Metal W-beam guard fence (timber post) (540-7001) | LF | 675 | $26.00 | $28.00 | $24.64 | $27.10 | $39.00 | $26.02 | $25.00 |
| 35 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 2 | $2,900.00 | $1,990.00 | $2,271.00 | $1,948.10 | $2,000.00 | $1,908.18 | $1,800.00 |
| 36 | Metal beam guard fence trans (anchor plate) (540-7029) | EACH | 2 | $1,100.00 | $1,440.00 | $1,283.00 | $1,411.30 | $900.00 | $1,395.78 | $1,300.00 |
| 37 | Remove metal beam guard fence (542-7001) | LF | 600 | $2.90 | $4.50 | $4.00 | $4.40 | $3.00 | $4.36 | $4.00 |
| 38 | Guardrail end treatment (move & reset) (544-7002) | EACH | 2 | $650.00 | $1,730.00 | $1,546.25 | $1,701.70 | $1,300.00 | $1,672.19 | $1,600.00 |
| 39 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 25 | $750.00 | $897.00 | $800.00 | $880.00 | $900.00 | $849.73 | $800.00 |
| 40 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 7 | $800.00 | $1,090.00 | $975.00 | $1,072.50 | $1,100.00 | $1,033.48 | $975.00 |
| 41 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 2 | $975.00 | $1,430.00 | $1,275.00 | $1,402.50 | $1,400.00 | $1,348.48 | $1,275.00 |
| 42 | Remove SM RD SN sup&AM (644-7073) | EACH | 29 | $110.00 | $95.00 | $85.00 | $93.50 | $430.00 | $98.98 | $85.00 |
| 43 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 17 | $45.00 | $67.00 | $60.00 | $66.00 | $70.00 | $72.73 | $60.00 |
| 44 | Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059) | EACH | 20 | $100.00 | $107.00 | $95.00 | $104.50 | $110.00 | $109.48 | $95.00 |
| 45 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 1,790 | $0.50 | $0.64 | $0.58 | $0.64 | $1.00 | $0.66 | $0.60 |
| 46 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 21,662 | $0.50 | $0.55 | $0.48 | $0.53 | $1.00 | $0.52 | $0.50 |
| 47 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 52 | $25.00 | $18.00 | $16.00 | $17.60 | $18.00 | $18.67 | $16.00 |
| 48 | Work zone pavement marking non-removing(W)36"(yld tri) (662-7032) | EACH | 12 | $21.00 | $28.00 | $25.00 | $27.50 | $29.00 | $34.36 | $25.00 |
| 49 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 10,784 | $0.55 | $0.55 | $0.48 | $0.53 | $1.00 | $0.52 | $0.50 |
| 50 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 213 | $2.00 | $1.24 | $1.06 | $1.11 | $4.00 | $1.40 | $1.25 |
| 51 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 1,090 | $1.80 | $1.24 | $1.06 | $1.11 | $4.00 | $1.25 | $1.25 |
| 52 | Reflectorized profile pavement marking type I(W)6"(solid)(090MIL) (666-7265) | LF | 20,614 | $0.50 | $1.00 | $0.88 | $0.97 | $1.00 | $0.93 | $0.90 |
| 53 | Reflectorized profile pavement marking type I(Y)6"(solid)(090MIL) (666-7269) | LF | 10,725 | $0.55 | $1.10 | $0.96 | $1.06 | $1.00 | $1.03 | $1.00 |
| 54 | Reflectorized profile pavement marking type I(Y)6"(broken)(090MIL) (666-7273) | LF | 2,870 | $0.55 | $1.25 | $1.10 | $1.21 | $1.00 | $1.19 | $1.10 |
| 55 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 48 | $15.00 | $18.00 | $16.00 | $17.60 | $18.00 | $18.83 | $16.00 |
| 56 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 12 | $35.00 | $39.00 | $35.00 | $38.50 | $41.00 | $52.96 | $35.00 |
| 57 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 208 | $4.50 | $8.40 | $7.50 | $8.25 | $8.00 | $8.34 | $7.50 |
| 58 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 26 | $5.00 | $8.40 | $7.50 | $8.25 | $8.00 | $11.62 | $7.50 |
| 59 | Tree removal (4" - 12" diameter) (752-7005) | EACH | 2 | $300.00 | $224.00 | $642.00 | $605.96 | $295.00 | $3,132.20 | $2,500.00 |
| 60 | Tree removal (12" - 18" diameter) (752-7006) | EACH | 1 | $400.00 | $280.00 | $802.50 | $727.14 | $590.00 | $3,288.45 | $3,100.00 |
| 61 | Drain inlet cleaning (764-7001) | EACH | 6 | $100.00 | $561.00 | $520.97 | $2,305.97 | $320.00 | $1,507.62 | $5,000.00 |
| 62 | Storm sewer cleaning (pipe)(19"-24"diameter) (764-7008) | LF | 178 | $6.50 | $15.00 | $20.84 | $16.50 | $13.00 | $50.82 | $50.00 |
| 63 | Storm sewer cleaning (pipe)(31"-36"diameter) (764-7010) | LF | 97 | $7.50 | $17.50 | $20.84 | $16.50 | $20.00 | $55.95 | $60.00 |
| 64 | Storm sewer cleaning (pipe)(37"-42"diameter) (764-7011) | LF | 1,492 | $8.00 | $20.00 | $10.42 | $16.50 | $10.00 | $60.63 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.