J. Carroll Weaver, Inc. submitted 87 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 07 OCT 2026, and was the low bidder on 12 of them (14%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $43,074,690
- Latest bid
- 07 OCT 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 19 | 2 | 11% |
| 2021 | 10 | 1 | 10% |
| 2022 | 3 | 1 | 33% |
| 2023 | 6 | 1 | 17% |
| 2024 | 15 | 4 | 27% |
| 2025 | 17 | 2 | 12% |
| 2026 | 17 | 1 | 6% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Corpus Christi District | 48 | 7 | 15% |
| Laredo District | 21 | 5 | 24% |
| Yoakum District | 7 | 0 | 0% |
| San Antonio District | 7 | 0 | 0% |
| Pharr District | 3 | 0 | 0% |
| Brownwood District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Excavation (roadway) | 110-7001 | CY | 66 | 23 (35%) | $13.66 | $20.00 |
| TMA (stationary) | 505-7001 | DAY | 68 | 22 (32%) | $203.45 | $230.00 |
| Prime coat (MC-30) | 310-7004 | GAL | 46 | 18 (39%) | $5.45 | $6.42 |
| Preparing row | 100-7002 | STA | 51 | 16 (31%) | $504.00 | $2,750.00 |
| Portable changeable message sign | 503-7002 | EACH | 49 | 13 (27%) | $8,325.00 | $10,000 |
| Driveways (surface treat) | 530-7016 | SY | 23 | 13 (57%) | $20.96 | $40.00 |
| Rock filter dams (remove) | 506-7011 | LF | 41 | 11 (27%) | $16.80 | $12.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 85 | 10 (12%) | $3,920.00 | $5,000.00 |
| Cem stabil BKFL | 400-7010 | CY | 42 | 10 (24%) | $154.43 | $200.00 |
| Work zone pavement marking SHT terminal (tab)type Y-2 | 662-7114 | EACH | 42 | 10 (24%) | $1.11 | $1.41 |
| FL BS (compacted in place)(tya GR1-2)(final pos) | 247-7176 | CY | 35 | 10 (29%) | $104.97 | $89.68 |
| Removing structure (pipe) | 496-7007 | LF | 29 | 10 (34%) | $19.15 | $24.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| CK Newberry, LLC | 57 | 29 of 57 |
| Hunter Industries, LTD. | 49 | 27 of 49 |
| Anderson Columbia Co., Inc. | 35 | 20 of 35 |
| Salinas Construction Technologies, LTD. | 25 | 9 of 25 |
| J E Construction Services, LLC | 21 | 9 of 21 |
| Tierra Lease Service, LLC | 18 | 12 of 18 |
| LCR Total Transport LLC | 18 | 5 of 18 |
| STX Civil | 18 | 11 of 18 |
| Acme Bridge Company, Inc. | 17 | 8 of 17 |
| Angel Brothers Holdings Corp. | 16 | 5 of 16 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 OCT 2026 | A00209154 | Laredo District | Bridge Replacement, BROWN RD (BROWN RD to .) | 5 of 6 | $639,345 | +32% |
| 02 SEP 2026 | A00121174 | Pharr District | New Arterial, SL 195 (NEW LOCATION, FM 649 to FM 3167) | 4 of 7 | $62,241,160 | +21% |
| 06 AUG 2026 | A00209034 | Corpus Christi District | Rehabilitate Existing Roadway, US 281 (Tullos St to N of SH 72 North) | 4 of 8 | $10,124,798 | +4.0% |
| 05 AUG 2026 | A00196471 | Corpus Christi District | Roadway Rehabilitation/Reconstruction With No Added Capacity, FM 81 (US 181 to FM 1144) | 7 of 9 | $10,746,061 | +29% |
| 03 JUN 2026 | A00190949 | Corpus Christi District | Bridge Replacement, LAZY F (0.1 Mi S of FM 883 to FM 883) | 1 of 10 | $825,295 | Low, 17% under the second |
| 03 JUN 2026 | A00190176 | Corpus Christi District | Bridge Replacement, COUNTY ROAD 308 (AA03-08 Agua Dulce Creek to 1.10 MI S of FM 624) | 4 of 8 | $935,814 | +7.0% |
| 02 JUN 2026 | A00133020 | Laredo District | Rehabilitate Existing Roadway, FM 1472 (TRADE CENTER BLVD to 0.4 MILES NORTH OF TRADE CENTER BLVD) | 2 of 7 | $3,107,871 | +5.0% |
| 02 JUN 2026 | A00215276 | Brownwood District | Widen Road - Add Shoulders, US 183 (MILLS COUNTY LINE to CITY OF LOMETA) | 2 of 9 | $4,555,075 | +1.0% |
| 02 JUN 2026 | A00190177 | Corpus Christi District | Bridge Replacement, COUNTY ROAD 230 (AA02-30 Draw to 0.5 MI SE of CR 237) | 10 of 10 | $1,037,493 | +27% |
| 07 MAY 2026 | A00207502 | San Antonio District | Bridge Replacement, FM 1107 (At Ecleto Creek to .) | 14 of 17 | $1,388,823 | +46% |
| 06 MAY 2026 | A00136586 | Corpus Christi District | Bridge Replacement, POST OAK RD (STR. (AA0145001) Post Oak Rd to Approx. .30 MI E of FM 1726) | 9 of 13 | $1,450,415 | +28% |
| 06 MAY 2026 | A00214597 | San Antonio District | Widen Road - Add Shoulders, RM 473 (FM 1376 to FM 474) | 4 of 7 | $4,427,015 | +8.0% |
| 07 APR 2026 | A00186521 | Laredo District | Bridge Replacement, LA PALOMA (LA PALOMA AT GALLINA SLOUGH CREEK to .) | 3 of 5 | $1,824,936 | +20% |
| 04 MAR 2026 | A00209031 | Corpus Christi District | Rehabilitate Existing Roadway, IH 37 (SH 234 to Cooper Rd (CR54)) | 3 of 7 | $2,639,651 | +17% |
| 05 FEB 2026 | A00186405 | Corpus Christi District | Bridge Replacement, US 181 (0.6 MI S of CR 1206 to 0.9 MI S of CR 1206) | 10 of 12 | $2,349,103 | +30% |
| 07 JAN 2026 | A00211280 | Laredo District | State Park Improvements, Various (CHAPARRAL WMA DR. to .) | 6 of 8 | $935,517 | +31% |
| 06 JAN 2026 | A00128788 | Corpus Christi District | Construct New Roadway Lanes, FM 624 (CR 73 to Wildcat Dr.) | 4 of 4 | $38,126,365 | +24% |
| 05 NOV 2025 | A00119667 | Corpus Christi District | Widen Road - Add Lanes, SH 359 (3,800 FT S of FM 624 to FM 70) | 5 of 7 | $17,433,210 | +17% |
| 08 OCT 2025 | A00214421 | Corpus Christi District | SEAL COAT, FM1540 (Various to Locations) | 4 of 7 | $2,031,625 | +9.0% |
| 05 SEP 2025 | A00123610 | Corpus Christi District | Widen Road - Add Lanes And Shoulders, FM 893 (CR 3685 (STARK RD) to .2 MI W OF CR 3567 (GUM HOLLOW)) | 4 of 7 | $14,246,616 | +19% |
| 04 SEP 2025 | A00215070 | Corpus Christi District | REHABILITATION OF EXISTING ROADWAY, IH0037 (West Frontage RD PR 2024 to CR 1726) | 2 of 10 | $1,663,170 | +14% |
| 04 SEP 2025 | A00190970 | Corpus Christi District | Bridge Replacement, COUNTY ROAD 18 (CR 18 Drainage Ditch to 0.55MI E of FM 892) | 7 of 9 | $1,712,655 | +21% |
| 10 JUL 2025 | A00216138 | Laredo District | TURN LANE, IH0035 (EXIT 5 RAMP ALONG IH 35 NB FRONTAGE ROAD to 0.177 MILES NORTH ON NB FRONTAGE ROAD) | 1 of 1 | $1,340,905 | Low |
| 01 JUL 2025 | A00193383 | Yoakum District | Hazard Elimination & Safety, FM 3084 (FM 1090 to 0.722 Mi N OF SH 35) | 5 of 7 | $5,092,932 | +16% |
| 05 JUN 2025 | A00196512 | Corpus Christi District | Widen Road - Add Shoulders, IH 37 (SS 459 to 0.45 mi south of SS 459) | 1 of 6 | $8,068,785 | Low, 21% under the second |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.