TxDOT contract A00209034 bid tabulation

Rehabilitate Existing Roadway, US 281 (Tullos St to N of SH 72 North). Let by Texas DOT on August 6, 2026, Live Oak, Corpus Christi District. 8 bids received; low bid $9,709,793 by STX Civil, -7.7% against the engineer's estimate of $10,519,558.

Owner
Texas DOT
Letting
06 AUG 2026
Pay items
70
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1STX Civil$9,709,793Low-8.0%
2Mako Contracting, LLC$9,867,643+2.0%-6.0%
3Hunter Industries, LTD.$10,057,980+4.0%-4.0%
4J. Carroll Weaver, Inc.$10,124,798+4.0%-4.0%
5J E Construction Services, LLC$10,746,718+11%+2.0%
6Salinas Construction Technologies, LTD.$12,180,547+25%+16%
7CK Newberry, LLC$13,883,134+43%+32%
8Acee Construction LLC.$15,590,772+61%+48%
TxDOT contract A00209034: bids by rank

Engineer's estimate: $10,519,558.

Bid tabulation

LinePay itemUnitQuantityEstimate1. STX Civil2. Mako Contracting, LLC3. Hunter Industries, LTD.4. J. Carroll Weaver, Inc.5. J E Construction Services, LLC6. Salinas Construction Technologies, LTD.
1Preparing row (100-7002)STA51$2,500.00$166.79$500.00$1,142.65$800.00$1,410.00$675.71
2Removing concrete (driveways) (104-7011)SY3,718$16.00$14.03$20.00$19.65$4.50$16.00$17.61
3Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY2,376$9.50$9.63$20.00$19.65$8.00$17.00$15.84
4Removing concrete (curb & gutter) (104-7017)LF4,423$9.00$7.63$8.00$13.08$5.00$7.00$5.28
5Excavation (roadway) (110-7001)CY19,258$11.00$15.07$10.00$22.89$27.00$17.00$22.42
6Backfill (type B) (134-7002)STA51$163.00$704.54$500.00$212.55$110.27$219.00$874.10
7Cem TRT(PLNT MX)(CL L)(tya)(GR1-2)(6") (276-7117)SY35,550$20.00$34.68$30.00$22.30$28.00$25.00$34.87
8Prime coat (MC-30) (310-7004)GAL7,057$3.00$4.72$8.00$7.60$6.96$13.00$10.34
9D-GR HMA type D sac-B PG64-22 (341-7045)TON3,156$110.00$152.56$250.80$118.23$145.47$241.00$119.21
10Tack coat (341-7082)GAL2,992$5.80$6.26$6.00$3.89$7.14$9.00$11.82
11Planing asphalt concrete pavement(0" to 2") (354-7032)SY2,600$5.00$5.79$5.92$5.35$14.89$7.00$6.09
12Concrete pavement (CRCP) (12") (360-7006)SY31,577$145.00$135.14$140.00$145.00$149.48$143.00$158.38
13Concrete pavement (CRCP)(hes) (12") (360-7051)SY2,662$210.00$149.57$155.00$155.00$149.85$146.00$245.87
14Struct excavation (pipe) (400-7003)CY49$130.00$6.16$15.00$50.00$46.44$20.00$150.92
15Cem stabil BKFL (400-7010)CY41$150.00$13.93$200.00$200.00$131.44$111.00$226.47
16Trench excavation protection (402-7001)LF80$110.00$4.89$1.00$10.00$5.55$31.00$65.22
17RC pipe (CL III)(18 in) (464-7003)LF40$165.00$139.98$90.00$400.00$159.77$411.00$199.76
18RC pipe (CL III)(24 in) (464-7005)LF40$210.00$178.52$120.00$600.00$191.79$422.00$206.01
19Inlet (complete)(pco)(5FT)(none) (465-7021)EACH6$5,800.00$14,057$7,500.00$8,000.00$7,215.00$6,400.00$15,567
20Removing structure (inlet) (496-7002)EACH6$2,800.00$984.85$5,000.00$1,000.00$1,656.60$1,740.00$1,298.64
21Removing structure (pipe) (496-7007)LF48$92.00$14.90$35.00$35.00$25.89$36.00$41.23
22Mobilization (500-7001)LS1$800,000$777,141$600,000$980,871$645,000$977,708$1,440,423
23Barricades, signs and traffic handling (502-7001)MO30$10,000$2,934.46$2,500.00$3,450.68$4,440.00$2,100.00$1,951.38
24Portable changeable message sign (503-7002)EACH13$8,000.00$5,471.00$12,500$5,179.07$11,100$16,710$42,189
25Sandbags for erosion control (506-7035)EACH96$14.00$10.01$1.00$9.80$27.75$13.00$17.67
26Temporary sediment control fence (install) (506-7039)LF650$2.40$2.74$4.00$5.50$6.38$6.00$5.12
27Temporary SDMT cont fence (inlet protection) (506-7040)LF400$5.50$2.64$4.00$8.86$8.65$8.00$9.08
28Temporary sediment control fence (remove) (506-7041)LF1,050$0.80$0.14$1.00$1.00$2.97$3.00$1.21
29Biodegradable erosion control logs (install) (8") (506-7043)LF303$8.00$6.74$5.00$7.80$8.24$15.00$11.92
30Biodegradable erosion control logs (remove) (506-7046)LF303$2.00$0.84$1.00$1.00$2.56$4.00$3.12
31Constructing detours (508-7001)SY46$130.00$275.00$200.00$214.50$306.60$341.00$350.50
32Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009)LF1,580$40.00$80.34$50.00$50.00$12.82$53.00$37.68
33Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010)LF560$60.00$80.34$50.00$50.00$12.82$54.00$52.50
34Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033)LF3,860$12.00$13.25$5.00$18.00$9.50$14.00$7.13
35Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034)LF1,160$15.00$9.58$5.00$20.00$9.55$15.00$7.23
36Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057)LF1,520$13.00$15.47$20.00$15.00$12.82$17.00$19.63
37Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058)LF440$15.00$3.39$20.00$15.00$12.82$18.00$27.53
38Concrete curb (mono) (type II) (529-7007)LF5,961$12.00$18.40$20.00$12.00$18.87$21.00$15.33
39Intersections (concrete) (530-7001)SY3,057$505.00$178.33$200.00$255.00$236.19$281.00$195.63
40Driveways (concrete) (530-7006)SY2,204$89.50$125.13$100.00$120.00$119.88$134.00$110.56
41Concrete sidewalks (5") (531-7002)SY2,771$40.00$91.16$80.00$78.00$97.68$76.00$98.43
42Curb ramps - all (531-7041)EACH46$3,600.00$2,591.62$2,500.00$2,600.00$3,330.00$3,190.00$2,346.17
43Relocate SM RD SN sup&AM type S80 (644-7067)EACH65$92.00$862.71$825.00$750.00$832.50$1,300.00$512.26
44Work zone pavement marking removing (W)6"(broken) (662-7065)LF550$0.80$2.07$1.98$1.80$2.00$2.00$2.80
45Work zone pavement marking removing (W)6"(solid) (662-7068)LF8,608$0.50$0.44$0.42$0.38$0.42$1.00$0.47
46Work zone pavement marking removing (W)8"(solid) (662-7072)LF105$1.00$2.88$2.75$2.50$2.78$3.00$3.82
47Work zone pavement marking removing (W)24"(solid) (662-7077)LF310$7.00$10.35$9.90$9.00$9.99$11.00$11.35
48Work zone pavement marking removing (W)18"(yld tri) (662-7093)EACH16$105.00$28.76$27.50$25.00$27.75$31.00$55.55
49Work zone pavement marking removing (Y)6"(broken) (662-7098)LF910$0.75$1.38$1.32$1.20$1.33$1.00$1.81
50Work zone pavement marking removing (Y)6"(solid) (662-7100)LF20,959$0.75$0.37$0.35$0.32$0.36$1.00$0.39
51Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH1,064$2.00$0.86$3.00$1.60$1.11$4.00$2.20
52Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH1,773$2.00$0.86$3.00$1.60$1.11$4.00$1.60
53Reflectorized pavement marking type II (W) 6" (broken) (666-7172)LF190$3.10$2.30$2.20$2.00$2.22$2.00$2.79
54Reflectorized pavement marking type II (Y) 6" (broken) (666-7211)LF190$11.00$2.30$2.20$2.00$2.22$2.00$2.79
55Reflectorized pavement marking type II (Y) 6" (solid) (666-7213)LF720$10.80$2.30$2.20$2.00$2.22$2.00$2.49
56Reflectorized pavement marking type III (W)(6")(solid) (666-7236)LF2,259$4.50$2.65$2.53$2.30$2.55$2.00$2.68
57Reflectorized pavement marking type III (W)(6")(broken) (666-7237)LF1,120$5.00$2.65$2.53$2.30$2.55$2.00$2.83
58Reflectorized pavement marking type III (W)(6")(DOT) (666-7238)LF88$12.00$7.48$7.15$6.50$7.22$8.00$8.42
59Reflectorized pavement marking type III (W)(8")(solid) (666-7239)LF751$10.50$4.03$3.85$3.50$3.89$4.00$4.15
60Reflectorized pavement marking type III (W)(8")(DOT) (666-7241)LF223$2.10$4.03$3.85$3.50$3.89$4.00$4.86
61Reflectorized pavement marking type III (Y)(6")(solid) (666-7248)LF13,095$1.60$1.73$1.65$1.50$1.67$2.00$1.74
62Reflectorized pavement marking type III (Y)(6")(broken) (666-7249)LF2,320$2.50$2.65$2.65$2.30$2.55$2.00$2.72
63Prefabricated PM type B (W)(6")(broken)contrast (668-7012)LF2,090$15.00$10.93$10.93$9.50$10.55$12.00$10.66
64Prefabricated PM type C (W)(24")(solid)contrast (668-7090)LF858$35.00$18.40$18.40$16.00$17.76$20.00$17.86
65Prefabricated PM type C (W)(arrow) (668-7091)EACH5$260.00$230.05$230.00$200.00$222.00$256.00$242.44
66Prefabricated PM type C (W)(word) (668-7103)EACH5$360.00$345.08$345.00$300.00$333.00$384.00$352.44
67Prefabricated PM type C (W)(36")(yld tri) (668-7111)EACH8$42.00$40.26$9.78$35.00$38.85$45.00$52.52
68Reflectorized pavement marker type I-C (672-7002)EACH204$5.00$8.63$8.63$7.50$8.33$10.00$8.80
69Reflectorized pavement marker type II-A-A (672-7004)EACH348$5.00$8.63$8.63$7.50$8.33$9.00$8.57
70Temporary traffic signals (681-7001)EACH2$24,386$14,874$55,000$12,500$1,110.00$24,600$148,556
TxDOT contract A00209034: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of August 6, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy