TxDOT contract A00209034 bid tabulation
Rehabilitate Existing Roadway, US 281 (Tullos St to N of SH 72 North). Let by Texas DOT on August 6, 2026, Live Oak, Corpus Christi District. 8 bids received; low bid $9,709,793 by STX Civil, -7.7% against the engineer's estimate of $10,519,558.
- Owner
- Texas DOT
- Letting
- 06 AUG 2026
- Pay items
- 70
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | STX Civil | $9,709,793 | Low | -8.0% |
| 2 | Mako Contracting, LLC | $9,867,643 | +2.0% | -6.0% |
| 3 | Hunter Industries, LTD. | $10,057,980 | +4.0% | -4.0% |
| 4 | J. Carroll Weaver, Inc. | $10,124,798 | +4.0% | -4.0% |
| 5 | J E Construction Services, LLC | $10,746,718 | +11% | +2.0% |
| 6 | Salinas Construction Technologies, LTD. | $12,180,547 | +25% | +16% |
| 7 | CK Newberry, LLC | $13,883,134 | +43% | +32% |
| 8 | Acee Construction LLC. | $15,590,772 | +61% | +48% |
Engineer's estimate: $10,519,558.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. STX Civil | 2. Mako Contracting, LLC | 3. Hunter Industries, LTD. | 4. J. Carroll Weaver, Inc. | 5. J E Construction Services, LLC | 6. Salinas Construction Technologies, LTD. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 51 | $2,500.00 | $166.79 | $500.00 | $1,142.65 | $800.00 | $1,410.00 | $675.71 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 3,718 | $16.00 | $14.03 | $20.00 | $19.65 | $4.50 | $16.00 | $17.61 |
| 3 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 2,376 | $9.50 | $9.63 | $20.00 | $19.65 | $8.00 | $17.00 | $15.84 |
| 4 | Removing concrete (curb & gutter) (104-7017) | LF | 4,423 | $9.00 | $7.63 | $8.00 | $13.08 | $5.00 | $7.00 | $5.28 |
| 5 | Excavation (roadway) (110-7001) | CY | 19,258 | $11.00 | $15.07 | $10.00 | $22.89 | $27.00 | $17.00 | $22.42 |
| 6 | Backfill (type B) (134-7002) | STA | 51 | $163.00 | $704.54 | $500.00 | $212.55 | $110.27 | $219.00 | $874.10 |
| 7 | Cem TRT(PLNT MX)(CL L)(tya)(GR1-2)(6") (276-7117) | SY | 35,550 | $20.00 | $34.68 | $30.00 | $22.30 | $28.00 | $25.00 | $34.87 |
| 8 | Prime coat (MC-30) (310-7004) | GAL | 7,057 | $3.00 | $4.72 | $8.00 | $7.60 | $6.96 | $13.00 | $10.34 |
| 9 | D-GR HMA type D sac-B PG64-22 (341-7045) | TON | 3,156 | $110.00 | $152.56 | $250.80 | $118.23 | $145.47 | $241.00 | $119.21 |
| 10 | Tack coat (341-7082) | GAL | 2,992 | $5.80 | $6.26 | $6.00 | $3.89 | $7.14 | $9.00 | $11.82 |
| 11 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 2,600 | $5.00 | $5.79 | $5.92 | $5.35 | $14.89 | $7.00 | $6.09 |
| 12 | Concrete pavement (CRCP) (12") (360-7006) | SY | 31,577 | $145.00 | $135.14 | $140.00 | $145.00 | $149.48 | $143.00 | $158.38 |
| 13 | Concrete pavement (CRCP)(hes) (12") (360-7051) | SY | 2,662 | $210.00 | $149.57 | $155.00 | $155.00 | $149.85 | $146.00 | $245.87 |
| 14 | Struct excavation (pipe) (400-7003) | CY | 49 | $130.00 | $6.16 | $15.00 | $50.00 | $46.44 | $20.00 | $150.92 |
| 15 | Cem stabil BKFL (400-7010) | CY | 41 | $150.00 | $13.93 | $200.00 | $200.00 | $131.44 | $111.00 | $226.47 |
| 16 | Trench excavation protection (402-7001) | LF | 80 | $110.00 | $4.89 | $1.00 | $10.00 | $5.55 | $31.00 | $65.22 |
| 17 | RC pipe (CL III)(18 in) (464-7003) | LF | 40 | $165.00 | $139.98 | $90.00 | $400.00 | $159.77 | $411.00 | $199.76 |
| 18 | RC pipe (CL III)(24 in) (464-7005) | LF | 40 | $210.00 | $178.52 | $120.00 | $600.00 | $191.79 | $422.00 | $206.01 |
| 19 | Inlet (complete)(pco)(5FT)(none) (465-7021) | EACH | 6 | $5,800.00 | $14,057 | $7,500.00 | $8,000.00 | $7,215.00 | $6,400.00 | $15,567 |
| 20 | Removing structure (inlet) (496-7002) | EACH | 6 | $2,800.00 | $984.85 | $5,000.00 | $1,000.00 | $1,656.60 | $1,740.00 | $1,298.64 |
| 21 | Removing structure (pipe) (496-7007) | LF | 48 | $92.00 | $14.90 | $35.00 | $35.00 | $25.89 | $36.00 | $41.23 |
| 22 | Mobilization (500-7001) | LS | 1 | $800,000 | $777,141 | $600,000 | $980,871 | $645,000 | $977,708 | $1,440,423 |
| 23 | Barricades, signs and traffic handling (502-7001) | MO | 30 | $10,000 | $2,934.46 | $2,500.00 | $3,450.68 | $4,440.00 | $2,100.00 | $1,951.38 |
| 24 | Portable changeable message sign (503-7002) | EACH | 13 | $8,000.00 | $5,471.00 | $12,500 | $5,179.07 | $11,100 | $16,710 | $42,189 |
| 25 | Sandbags for erosion control (506-7035) | EACH | 96 | $14.00 | $10.01 | $1.00 | $9.80 | $27.75 | $13.00 | $17.67 |
| 26 | Temporary sediment control fence (install) (506-7039) | LF | 650 | $2.40 | $2.74 | $4.00 | $5.50 | $6.38 | $6.00 | $5.12 |
| 27 | Temporary SDMT cont fence (inlet protection) (506-7040) | LF | 400 | $5.50 | $2.64 | $4.00 | $8.86 | $8.65 | $8.00 | $9.08 |
| 28 | Temporary sediment control fence (remove) (506-7041) | LF | 1,050 | $0.80 | $0.14 | $1.00 | $1.00 | $2.97 | $3.00 | $1.21 |
| 29 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 303 | $8.00 | $6.74 | $5.00 | $7.80 | $8.24 | $15.00 | $11.92 |
| 30 | Biodegradable erosion control logs (remove) (506-7046) | LF | 303 | $2.00 | $0.84 | $1.00 | $1.00 | $2.56 | $4.00 | $3.12 |
| 31 | Constructing detours (508-7001) | SY | 46 | $130.00 | $275.00 | $200.00 | $214.50 | $306.60 | $341.00 | $350.50 |
| 32 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 1,580 | $40.00 | $80.34 | $50.00 | $50.00 | $12.82 | $53.00 | $37.68 |
| 33 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 560 | $60.00 | $80.34 | $50.00 | $50.00 | $12.82 | $54.00 | $52.50 |
| 34 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 3,860 | $12.00 | $13.25 | $5.00 | $18.00 | $9.50 | $14.00 | $7.13 |
| 35 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 1,160 | $15.00 | $9.58 | $5.00 | $20.00 | $9.55 | $15.00 | $7.23 |
| 36 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 1,520 | $13.00 | $15.47 | $20.00 | $15.00 | $12.82 | $17.00 | $19.63 |
| 37 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 440 | $15.00 | $3.39 | $20.00 | $15.00 | $12.82 | $18.00 | $27.53 |
| 38 | Concrete curb (mono) (type II) (529-7007) | LF | 5,961 | $12.00 | $18.40 | $20.00 | $12.00 | $18.87 | $21.00 | $15.33 |
| 39 | Intersections (concrete) (530-7001) | SY | 3,057 | $505.00 | $178.33 | $200.00 | $255.00 | $236.19 | $281.00 | $195.63 |
| 40 | Driveways (concrete) (530-7006) | SY | 2,204 | $89.50 | $125.13 | $100.00 | $120.00 | $119.88 | $134.00 | $110.56 |
| 41 | Concrete sidewalks (5") (531-7002) | SY | 2,771 | $40.00 | $91.16 | $80.00 | $78.00 | $97.68 | $76.00 | $98.43 |
| 42 | Curb ramps - all (531-7041) | EACH | 46 | $3,600.00 | $2,591.62 | $2,500.00 | $2,600.00 | $3,330.00 | $3,190.00 | $2,346.17 |
| 43 | Relocate SM RD SN sup&AM type S80 (644-7067) | EACH | 65 | $92.00 | $862.71 | $825.00 | $750.00 | $832.50 | $1,300.00 | $512.26 |
| 44 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 550 | $0.80 | $2.07 | $1.98 | $1.80 | $2.00 | $2.00 | $2.80 |
| 45 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 8,608 | $0.50 | $0.44 | $0.42 | $0.38 | $0.42 | $1.00 | $0.47 |
| 46 | Work zone pavement marking removing (W)8"(solid) (662-7072) | LF | 105 | $1.00 | $2.88 | $2.75 | $2.50 | $2.78 | $3.00 | $3.82 |
| 47 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 310 | $7.00 | $10.35 | $9.90 | $9.00 | $9.99 | $11.00 | $11.35 |
| 48 | Work zone pavement marking removing (W)18"(yld tri) (662-7093) | EACH | 16 | $105.00 | $28.76 | $27.50 | $25.00 | $27.75 | $31.00 | $55.55 |
| 49 | Work zone pavement marking removing (Y)6"(broken) (662-7098) | LF | 910 | $0.75 | $1.38 | $1.32 | $1.20 | $1.33 | $1.00 | $1.81 |
| 50 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 20,959 | $0.75 | $0.37 | $0.35 | $0.32 | $0.36 | $1.00 | $0.39 |
| 51 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 1,064 | $2.00 | $0.86 | $3.00 | $1.60 | $1.11 | $4.00 | $2.20 |
| 52 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 1,773 | $2.00 | $0.86 | $3.00 | $1.60 | $1.11 | $4.00 | $1.60 |
| 53 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 190 | $3.10 | $2.30 | $2.20 | $2.00 | $2.22 | $2.00 | $2.79 |
| 54 | Reflectorized pavement marking type II (Y) 6" (broken) (666-7211) | LF | 190 | $11.00 | $2.30 | $2.20 | $2.00 | $2.22 | $2.00 | $2.79 |
| 55 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 720 | $10.80 | $2.30 | $2.20 | $2.00 | $2.22 | $2.00 | $2.49 |
| 56 | Reflectorized pavement marking type III (W)(6")(solid) (666-7236) | LF | 2,259 | $4.50 | $2.65 | $2.53 | $2.30 | $2.55 | $2.00 | $2.68 |
| 57 | Reflectorized pavement marking type III (W)(6")(broken) (666-7237) | LF | 1,120 | $5.00 | $2.65 | $2.53 | $2.30 | $2.55 | $2.00 | $2.83 |
| 58 | Reflectorized pavement marking type III (W)(6")(DOT) (666-7238) | LF | 88 | $12.00 | $7.48 | $7.15 | $6.50 | $7.22 | $8.00 | $8.42 |
| 59 | Reflectorized pavement marking type III (W)(8")(solid) (666-7239) | LF | 751 | $10.50 | $4.03 | $3.85 | $3.50 | $3.89 | $4.00 | $4.15 |
| 60 | Reflectorized pavement marking type III (W)(8")(DOT) (666-7241) | LF | 223 | $2.10 | $4.03 | $3.85 | $3.50 | $3.89 | $4.00 | $4.86 |
| 61 | Reflectorized pavement marking type III (Y)(6")(solid) (666-7248) | LF | 13,095 | $1.60 | $1.73 | $1.65 | $1.50 | $1.67 | $2.00 | $1.74 |
| 62 | Reflectorized pavement marking type III (Y)(6")(broken) (666-7249) | LF | 2,320 | $2.50 | $2.65 | $2.65 | $2.30 | $2.55 | $2.00 | $2.72 |
| 63 | Prefabricated PM type B (W)(6")(broken)contrast (668-7012) | LF | 2,090 | $15.00 | $10.93 | $10.93 | $9.50 | $10.55 | $12.00 | $10.66 |
| 64 | Prefabricated PM type C (W)(24")(solid)contrast (668-7090) | LF | 858 | $35.00 | $18.40 | $18.40 | $16.00 | $17.76 | $20.00 | $17.86 |
| 65 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 5 | $260.00 | $230.05 | $230.00 | $200.00 | $222.00 | $256.00 | $242.44 |
| 66 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 5 | $360.00 | $345.08 | $345.00 | $300.00 | $333.00 | $384.00 | $352.44 |
| 67 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 8 | $42.00 | $40.26 | $9.78 | $35.00 | $38.85 | $45.00 | $52.52 |
| 68 | Reflectorized pavement marker type I-C (672-7002) | EACH | 204 | $5.00 | $8.63 | $8.63 | $7.50 | $8.33 | $10.00 | $8.80 |
| 69 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 348 | $5.00 | $8.63 | $8.63 | $7.50 | $8.33 | $9.00 | $8.57 |
| 70 | Temporary traffic signals (681-7001) | EACH | 2 | $24,386 | $14,874 | $55,000 | $12,500 | $1,110.00 | $24,600 | $148,556 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 6, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.