Mako Contracting, LLC: TxDOT bid record

Mako Contracting, LLC submitted 10 bids on Texas DOT contracts in the data, from 05 AUG 2021 to 06 AUG 2026, and was the low bidder on 2 of them (20%). When it was not low, its total sat a median +41% above the low bid.

Owner
Texas DOT
Low bid volume
$4,860,790
Latest bid
06 AUG 2026
Data through
19 NOV 2026
10Bids
2Low bids
20Win rate, percent
+41%Median gap to the low bid when not low, 8 bids

By year

YearBidsLow bidsWin rate
2021100%
20232150%
20242150%
2025200%
2026300%
Mako Contracting, LLC, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Corpus Christi District8113%
Laredo District2150%
Mako Contracting, LLC, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Temporary sediment control fence (remove)506-7041LF94 (44%)$1.00$1.00
Temporary sediment control fence (install)506-7039LF93 (33%)$4.00$4.00
Driveways (concrete)530-7006SY53 (60%)$90.00$110.00
Barricades, signs and traffic handling502-7001MO102 (20%)$2,500.00$5,000.00
Biodegradable erosion control logs (remove)506-7046LF82 (25%)$2.00$1.40
Remove SM RD SN sup&AM644-7073EACH72 (29%)$88.80$110.00
Portable changeable message sign503-7001DAY52 (40%)$68.75$100.00
Conduit (PVC) (schedule 40) (2")618-7030LF52 (40%)$11.50$15.00
Preparing row100-7002STA51 (20%)$1,000.00$2,750.00
RC pipe (CL III)(18 in)464-7003LF51 (20%)$105.00$82.44
Block sodding162-7002SY51 (20%)$10.00$6.20
Concrete curb & gutter (type II)529-7009LF51 (20%)$40.00$42.58
Mako Contracting, LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Mako Contracting, LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
06 AUG 2026A00209034Corpus Christi DistrictRehabilitate Existing Roadway, US 281 (Tullos St to N of SH 72 North)2 of 8$9,867,643+2.0%
04 MAR 2026A00127306Laredo DistrictRehabilitate Existing Roadway, SH 44 (US 59 to 4 MI EAST OF US 59)5 of 5$27,009,857+48%
07 JAN 2026A00207865Corpus Christi DistrictConstruct Pedestrian Infrastructure, SH 286 (Horne Rd to Baldwin Blvd)3 of 5$996,697+10%
05 SEP 2025A00123610Corpus Christi DistrictWiden Road - Add Lanes And Shoulders, FM 893 (CR 3685 (STARK RD) to .2 MI W OF CR 3567 (GUM HOLLOW))7 of 7$18,948,406+59%
04 SEP 2025A00215070Corpus Christi DistrictREHABILITATION OF EXISTING ROADWAY, IH0037 (West Frontage RD PR 2024 to CR 1726)10 of 10$2,538,691+74%
06 JUN 202406243245Corpus Christi DistrictSH 359 Construct pedestrian infrastructure from 1,000 FEET WEST OF WENDT ST to 600 FEET EAST OF W MENDOZA AVE1 of 6$656,398Low, 3.0% under the second
06 JUN 202406243246Corpus Christi DistrictFM 738 Widen road - add shoulders from ON FM738 FROM .8 MI S OF CR303 to SOYARS AVE.6 of 7$2,974,346+49%
28 JUN 202306233621Laredo DistrictSH 359 Rehabilitate existing roadway from SAN DIEGO CREEK BRIDGE to SH 441 of 5$4,204,392Low, 0.0% under the second
08 MAR 202303233222Corpus Christi DistrictVA Construct pedestrian infrastructure from AT VARIOUS LOCATIONS IN CC DISTRICT2 of 3$3,883,301+24%
05 AUG 202108213240Corpus Christi DistrictSH 358 Construct pedestrian infrastructure from W. CARTER ST. to SH 2022 of 6$3,404,150+34%
Mako Contracting, LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy