TxDOT contract A00127306 bid tabulation
Rehabilitate Existing Roadway, SH 44 (US 59 to 4 MI EAST OF US 59). Let by Texas DOT on March 4, 2026, Duval, Laredo District. 5 bids received; low bid $18,216,991 by Hunter Industries, LTD., -17% against the engineer's estimate of $21,994,703.
- Owner
- Texas DOT
- Letting
- 04 MAR 2026
- Pay items
- 126
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Hunter Industries, LTD. | $18,216,991 | Low | -17% |
| 2 | Anderson Columbia Co., Inc. | $18,582,416 | +2.0% | -16% |
| 3 | CK Newberry, LLC | $19,019,467 | +4.0% | -14% |
| 4 | Texas Materials Group, Inc. | $23,806,134 | +31% | +8.0% |
| 5 | Mako Contracting, LLC | $27,009,857 | +48% | +23% |
Engineer's estimate: $21,994,703.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Hunter Industries, LTD. | 2. Anderson Columbia Co., Inc. | 3. CK Newberry, LLC | 4. Texas Materials Group, Inc. | 5. Mako Contracting, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 230 | $3,000.00 | $673.51 | $500.00 | $500.00 | $268.00 | $1,100.00 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 1,622 | $8.00 | $14.18 | $25.00 | $20.00 | $19.00 | $55.00 |
| 3 | Remove (10") TRT/untrt base & asphalt pavement (105-7030) | SY | 120,504 | $10.00 | $4.77 | $2.40 | $4.75 | $10.00 | $7.00 |
| 4 | Excavation (roadway) (110-7001) | CY | 13,707 | $14.00 | $16.35 | $10.00 | $15.00 | $19.00 | $14.00 |
| 5 | Subgr widen (DC) (112-7002) | STA | 230 | $1,000.00 | $488.40 | $2,200.00 | $350.00 | $940.00 | $3,750.00 |
| 6 | Embankment (final)(DC)(type D) (132-7012) | CY | 2,195 | $6.50 | $14.21 | $10.00 | $20.00 | $14.20 | $7.00 |
| 7 | Drill seed (permanent_rural_clay) (164-7042) | ACRE | 42.20 | $800.00 | $1,250.00 | $1,350.00 | $1,250.00 | $1,250.00 | $5,500.00 |
| 8 | Drill seed (temporary_warm) (164-7045) | ACRE | 42.20 | $500.00 | $500.00 | $540.00 | $500.00 | $500.00 | $2,500.00 |
| 9 | Proof rolling (216-7001) | HR | 42 | $80.00 | $88.00 | $140.00 | $70.00 | $182.00 | $125.00 |
| 10 | FL BS (compacted in place)(tya GR1-2)(final pos) (247-7176) | CY | 40,261 | $85.00 | $88.73 | $88.00 | $85.00 | $114.50 | $110.00 |
| 11 | Lime (quicklime (slurry)) (260-7003) | TON | 1,938 | $350.00 | $326.35 | $375.00 | $315.00 | $398.00 | $492.49 |
| 12 | Lime TRT (existing material)(6") (260-7006) | SY | 130,461 | $3.50 | $3.02 | $3.50 | $1.65 | $4.22 | $3.22 |
| 13 | Prime coat (RC-250) (310-7006) | GAL | 25,133 | $5.00 | $4.41 | $5.00 | $4.50 | $4.60 | $6.13 |
| 14 | D-GR HMA type-B sac-B PG70-22 (341-7007) | TON | 31,404 | $105.00 | $95.31 | $98.00 | $96.50 | $107.50 | $159.85 |
| 15 | D-GR HMA type-C sac-A PG76-22 (341-7031) | TON | 14,972 | $120.00 | $116.22 | $108.00 | $112.50 | $138.00 | $204.70 |
| 16 | D-GR HMA type D sac-B PG64-22 (341-7045) | TON | 2,293 | $140.00 | $98.56 | $110.00 | $105.00 | $128.00 | $194.35 |
| 17 | Planing asphalt concrete pavement(4") (354-7053) | SY | 107,026 | $2.60 | $2.81 | $1.00 | $1.50 | $3.14 | $4.26 |
| 18 | Struct excavation (box) (400-7002) | CY | 2,549 | $50.00 | $9.43 | $10.00 | $10.00 | $9.50 | $104.50 |
| 19 | Cem stabil BKFL (400-7010) | CY | 641 | $250.00 | $90.57 | $150.00 | $140.00 | $138.00 | $280.00 |
| 20 | Trench excavation protection (402-7001) | LF | 644 | $20.00 | $9.08 | $12.00 | $12.00 | $11.85 | $60.00 |
| 21 | Temporary special shoring (403-7001) | SF | 27,002 | $25.00 | $0.95 | $12.00 | $10.75 | $31.00 | $14.00 |
| 22 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 72 | $350.00 | $383.24 | $210.00 | $300.00 | $250.00 | $224.25 |
| 23 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 27 | $380.00 | $540.74 | $320.00 | $400.00 | $350.00 | $339.25 |
| 24 | Riprap (concrete)(5 in) (432-7002) | CY | 11 | $600.00 | $783.23 | $600.00 | $575.00 | $550.00 | $750.00 |
| 25 | Riprap (concrete) (CL B) (4 in) (432-7007) | CY | 203 | $550.00 | $726.06 | $550.00 | $525.00 | $505.00 | $700.00 |
| 26 | Riprap (concrete)(dissipater) (432-7011) | CY | 7 | $1,200.00 | $1,301.55 | $700.00 | $650.00 | $632.00 | $5,000.00 |
| 27 | Riprap (mow strip)(4 in) (432-7013) | CY | 182 | $825.00 | $743.21 | $550.00 | $550.00 | $510.00 | $600.00 |
| 28 | Concrete box culvert (3 FT X 2 FT) (462-7001) | LF | 108 | $410.00 | $292.72 | $380.00 | $375.00 | $350.00 | $467.50 |
| 29 | Concrete box culvert (4 FT X 3 FT) (462-7004) | LF | 60 | $450.00 | $346.90 | $460.00 | $450.00 | $426.00 | $555.50 |
| 30 | Concrete box culvert (5 FT X 2 FT) (462-7006) | LF | 224 | $530.00 | $400.56 | $540.00 | $525.00 | $501.00 | $641.30 |
| 31 | Concrete box culvert (5 FT X 4 FT) (462-7008) | LF | 152 | $550.00 | $453.15 | $620.00 | $625.00 | $575.00 | $716.10 |
| 32 | Concrete box culvert (6 FT X 2 FT) (462-7010) | LF | 53 | $650.00 | $453.15 | $640.00 | $625.00 | $577.00 | $807.40 |
| 33 | Concrete box culvert (6 FT X 3 FT) (462-7011) | LF | 249 | $785.00 | $504.15 | $700.00 | $675.00 | $652.00 | $880.00 |
| 34 | Concrete box culvert (6 FT X 5 FT) (462-7013) | LF | 69 | $950.00 | $583.31 | $840.00 | $800.00 | $771.00 | $935.00 |
| 35 | Concrete box culvert (9 FT X 8 FT) (462-7030) | LF | 92 | $1,550.00 | $1,027.96 | $1,700.00 | $1,600.00 | $1,575.00 | $3,600.00 |
| 36 | Wingwall (PW - 1) (HW=4 FT) (466-7174) | EACH | 1 | $15,000 | $22,790 | $11,000 | $10,000 | $9,461.00 | $18,000 |
| 37 | Wingwall (PW - 1) (HW=5 FT) (466-7175) | EACH | 2 | $17,780 | $28,204 | $20,000 | $20,000 | $18,405 | $25,000 |
| 38 | Wingwall (PW - 1) (HW=7 FT) (466-7177) | EACH | 2 | $33,000 | $39,912 | $24,000 | $22,000 | $21,891 | $30,000 |
| 39 | Wingwall (PW - 1) (HW=9 FT) (466-7179) | EACH | 2 | $45,000 | $50,952 | $38,000 | $36,000 | $35,000 | $40,000 |
| 40 | Wingwall (PW - 1) (HW=10 FT) (466-7180) | EACH | 1 | $50,000 | $55,648 | $45,000 | $42,000 | $41,250 | $50,000 |
| 41 | Set (type I)(S= 3 FT)(HW= 3 FT)(4:1)(C) (467-7041) | EACH | 6 | $8,000.00 | $2,217.74 | $7,000.00 | $7,000.00 | $6,550.00 | $12,000 |
| 42 | Set (type I)(S= 4 FT)(HW= 4 FT)(3:1)(C) (467-7071) | EACH | 2 | $14,000 | $16,431 | $9,000.00 | $9,000.00 | $8,339.00 | $15,000 |
| 43 | Set (type I)(S= 5 FT)(HW= 3 FT)(4:1)(C) (467-7096) | EACH | 4 | $14,000 | $2,806.04 | $11,000 | $10,000 | $9,739.00 | $15,000 |
| 44 | Set (type I)(S= 6 FT)(HW= 3 FT)(4:1)(C) (467-7125) | EACH | 2 | $15,000 | $3,478.38 | $10,000 | $9,500.00 | $8,750.00 | $15,000 |
| 45 | Removing structure (box culvert) (496-7001) | EACH | 14 | $9,000.00 | $132.81 | $1,800.00 | $2,500.00 | $1,609.00 | $32,450 |
| 46 | Removing structure (set) (496-7004) | EACH | 16 | $800.00 | $531.25 | $1,500.00 | $1,500.00 | $1,375.00 | $3,850.00 |
| 47 | Removing structure (wingwall) (496-7005) | EACH | 4 | $2,300.00 | $1,301.55 | $1,400.00 | $1,500.00 | $1,250.00 | $4,800.00 |
| 48 | Mobilization (500-7001) | LS | 1 | $1,434,613 | $1,440,059 | $1,640,000 | $1,800,000 | $1,699,450 | $665,000 |
| 49 | Barricades, signs and traffic handling (502-7001) | MO | 18 | $5,000.00 | $8,288.30 | $3,500.00 | $5,000.00 | $3,275.00 | $4,350.00 |
| 50 | Portable changeable message sign (503-7002) | EACH | 4 | $12,000 | $2,500.00 | $20,000 | $20,000 | $15,000 | $5,000.00 |
| 51 | TMA (stationary) (505-7001) | DAY | 698 | $250.00 | $150.00 | $300.00 | $200.00 | $175.00 | $200.00 |
| 52 | TMA (mobile operation) (505-7003) | DAY | 500 | $250.00 | $250.00 | $20.00 | $25.00 | $400.00 | $250.00 |
| 53 | Rock filter dams (install) (type 3) (506-7003) | LF | 273 | $73.00 | $90.00 | $100.00 | $90.00 | $90.00 | $25.00 |
| 54 | Rock filter dams (remove) (506-7011) | LF | 273 | $14.50 | $18.00 | $20.00 | $18.00 | $18.00 | $5.00 |
| 55 | Construction exits (install) (type 1) (506-7020) | SY | 56 | $40.00 | $55.00 | $60.00 | $25.00 | $55.00 | $40.00 |
| 56 | Construction exits (remove) (506-7024) | SY | 56 | $10.00 | $20.00 | $22.00 | $20.00 | $20.00 | $18.00 |
| 57 | Backhoe work (erosion & sediment control) (506-7030) | HR | 20 | $150.00 | $150.00 | $100.00 | $85.00 | $140.00 | $125.00 |
| 58 | Temporary sediment control fence (install) (506-7039) | LF | 800 | $6.00 | $6.00 | $6.50 | $6.00 | $6.00 | $5.00 |
| 59 | Temporary sediment control fence (remove) (506-7041) | LF | 800 | $1.00 | $2.00 | $2.10 | $2.00 | $2.00 | $1.00 |
| 60 | Constructing detours (508-7001) | SY | 27,022 | $44.00 | $45.36 | $51.00 | $50.00 | $66.00 | $74.00 |
| 61 | One-way traffic control (flagger cont) (510-7001) | HR | 200 | $75.00 | $82.50 | $80.00 | $50.00 | $75.00 | $30.00 |
| 62 | One-way traffic control (pilot car) (510-7002) | HR | 1,000 | $40.00 | $93.50 | $185.00 | $110.00 | $150.00 | $125.00 |
| 63 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 19,500 | $50.00 | $30.15 | $22.00 | $60.00 | $56.00 | $80.00 |
| 64 | Portable concrete traffic barrier (des source)(low prof)(type 1) (512-7021) | LF | 4,040 | $20.00 | $17.42 | $16.00 | $12.00 | $30.00 | $20.00 |
| 65 | Portable concrete traffic barrier (des source)(low prof)(type 2) (512-7022) | LF | 340 | $20.00 | $25.66 | $16.00 | $22.00 | $35.00 | $30.00 |
| 66 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 19,500 | $10.00 | $6.34 | $1.70 | $8.00 | $7.00 | $7.00 |
| 67 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 5,820 | $15.00 | $15.88 | $4.00 | $5.00 | $7.00 | $7.00 |
| 68 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 500 | $16.00 | $26.64 | $4.00 | $15.00 | $7.00 | $7.00 |
| 69 | Portable concrete traffic barrier (stockpile)(low prof)(type 1) (512-7045) | LF | 3,880 | $12.00 | $16.01 | $12.00 | $10.00 | $24.00 | $50.00 |
| 70 | Portable concrete traffic barrier (stockpile)(low prof)(type 2) (512-7046) | LF | 340 | $20.00 | $22.24 | $12.00 | $22.00 | $24.00 | $50.00 |
| 71 | Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049) | LF | 19,500 | $20.00 | $15.20 | $12.00 | $15.00 | $32.00 | $7.00 |
| 72 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 42,240 | $0.27 | $0.18 | $0.17 | $0.15 | $0.18 | $0.16 |
| 73 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 21,120 | $0.27 | $0.20 | $0.17 | $0.20 | $0.20 | $0.30 |
| 74 | Metal W-beam guard fence (timber post) (540-7001) | LF | 2,975 | $25.00 | $27.25 | $36.00 | $28.00 | $30.00 | $38.53 |
| 75 | Metal beam guard fence (long span system) (540-7027) | EACH | 4 | $1,130.00 | $1,455.00 | $1,820.00 | $1,925.00 | $1,160.00 | $1,941.20 |
| 76 | Remove metal beam guard fence (542-7001) | LF | 1,975 | $3.00 | $5.00 | $2.40 | $3.00 | $3.00 | $2.59 |
| 77 | Remove terminal anchor section (542-7002) | EACH | 4 | $265.00 | $355.00 | $215.00 | $325.00 | $220.00 | $230.00 |
| 78 | Guardrail end treatment (install) (544-7001) | EACH | 14 | $3,000.00 | $2,985.00 | $3,800.00 | $4,500.00 | $3,300.00 | $4,054.90 |
| 79 | Guardrail end treatment (remove) (544-7003) | EACH | 8 | $1,415.00 | $455.00 | $215.00 | $325.00 | $330.00 | $230.00 |
| 80 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 70 | $1,300.00 | $1,250.00 | $975.00 | $650.00 | $1,180.00 | $948.75 |
| 81 | Crash cushion attenuator (remove) (545-7004) | EACH | 70 | $1,000.00 | $555.00 | $740.00 | $650.00 | $825.00 | $948.75 |
| 82 | Cca (install)(N)(TL3)(work zone) (545-7018) | EACH | 70 | $10,000 | $6,825.00 | $6,250.00 | $6,500.00 | $8,000.00 | $948.75 |
| 83 | Mailbox install-M (TWG-post) type 1 (560-7001) | EACH | 8 | $250.00 | $656.27 | $600.00 | $550.00 | $550.00 | $660.00 |
| 84 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 1 | $500.00 | $880.63 | $645.00 | $600.00 | $600.00 | $900.00 |
| 85 | Relocate existing mailbox (560-7012) | EACH | 9 | $250.00 | $544.08 | $270.00 | $250.00 | $250.00 | $660.00 |
| 86 | In RD IL (type SA) 40T-8 (250W EQ) LED (610-7124) | EACH | 9 | $11,914 | $4,674.00 | $5,270.00 | $5,250.00 | $4,500.00 | $5,629.25 |
| 87 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 2,075 | $15.34 | $13.30 | $11.00 | $20.00 | $12.00 | $11.50 |
| 88 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 93 | $28.71 | $35.75 | $40.00 | $51.00 | $30.00 | $42.55 |
| 89 | Electrical conductor (no.8) bare (620-7007) | LF | 2,213 | $2.24 | $2.05 | $1.60 | $2.50 | $1.50 | $1.73 |
| 90 | Electrical conductor (no.8) insulated (620-7008) | LF | 4,371 | $2.55 | $2.30 | $1.70 | $2.75 | $1.55 | $1.84 |
| 91 | Electrical conductor (no.6) bare (620-7009) | LF | 10 | $3.62 | $2.23 | $3.40 | $3.75 | $1.75 | $3.68 |
| 92 | Electrical conductor (no.6) insulated (620-7010) | LF | 10 | $2,015.59 | $2.55 | $3.70 | $4.25 | $1.95 | $3.68 |
| 93 | Tray cable (3 conductor) (12 AWG) (621-7002) | LF | 286 | $3.62 | $3.35 | $3.00 | $2.75 | $3.00 | $3.22 |
| 94 | Ground box type C (162911)W/apron (624-7006) | EACH | 2 | $2,015.59 | $1,241.00 | $1,360.00 | $2,000.00 | $1,000.00 | $1,449.00 |
| 95 | Zinc-coat steel wire strand (3/8") (625-7004) | LF | 165 | $3.12 | $4.90 | $3.00 | $3.25 | $3.05 | $3.22 |
| 96 | Remove electrical services (628-7002) | EACH | 1 | $812.94 | $1,890.00 | $400.00 | $4,000.00 | $365.00 | $419.75 |
| 97 | Elc SRV type T 120/240 000(NS)GS(L)SP(O) (628-7319) | EACH | 1 | $4,000.00 | $7,227.00 | $6,330.00 | $5,500.00 | $5,500.00 | $6,762.00 |
| 98 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 39 | $1,000.00 | $768.45 | $740.00 | $700.00 | $690.00 | $930.00 |
| 99 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 7 | $1,100.00 | $824.54 | $1,030.00 | $800.00 | $790.00 | $1,380.00 |
| 100 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 11 | $1,700.00 | $992.81 | $1,034.92 | $1,000.00 | $960.00 | $1,680.00 |
| 101 | Remove SM RD SN sup&AM (644-7073) | EACH | 57 | $135.00 | $95.35 | $107.00 | $100.00 | $100.00 | $102.00 |
| 102 | Install delineator assembly (D-SW)SZ 1(WFLX)GF2 (658-7001) | EACH | 27 | $31.00 | $68.65 | $48.00 | $100.00 | $45.00 | $62.40 |
| 103 | Install delineator assembly (D-SW)SZ 1(WFLX)GF2(BI) (658-7002) | EACH | 12 | $35.00 | $75.00 | $54.00 | $100.00 | $45.00 | $62.40 |
| 104 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 580 | $1.00 | $7.50 | $8.00 | $8.00 | $7.50 | $9.00 |
| 105 | Work zone pavement marking removing (traffic BTN) type W (662-7057) | EACH | 18,957 | $1.00 | $1.10 | $1.20 | $1.25 | $1.10 | $1.32 |
| 106 | Work zone pavement marking removing (traffic BTN) type Y (662-7059) | EACH | 18,957 | $1.00 | $1.10 | $1.20 | $1.25 | $1.10 | $1.32 |
| 107 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 8 | $250.00 | $275.00 | $300.00 | $300.00 | $275.00 | $330.00 |
| 108 | Pavement sler 6" (666-7347) | LF | 87,601 | $0.30 | $0.28 | $0.30 | $0.30 | $0.28 | $0.34 |
| 109 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 3,501 | $1.00 | $0.78 | $0.85 | $0.80 | $0.78 | $0.94 |
| 110 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 42,050 | $1.00 | $0.62 | $0.65 | $0.65 | $0.62 | $0.74 |
| 111 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 42,050 | $0.75 | $0.62 | $0.65 | $0.65 | $0.62 | $0.74 |
| 112 | Reflectorized pavement marker type I-C (672-7002) | EACH | 176 | $5.50 | $7.50 | $8.00 | $8.00 | $7.50 | $9.00 |
| 113 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 528 | $5.00 | $7.50 | $8.00 | $8.00 | $7.50 | $9.00 |
| 114 | Eliminating existing PM & markers (4") (677-7001) | LF | 68,814 | $1.00 | $0.25 | $0.30 | $0.50 | $0.25 | $0.30 |
| 115 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 6 | $110.00 | $70.00 | $75.00 | $75.00 | $70.00 | $84.00 |
| 116 | Eliminating existing PM & markers (word) (677-7015) | EACH | 6 | $110.00 | $70.00 | $75.00 | $75.00 | $70.00 | $84.00 |
| 117 | Install highway traffic signal (flash beacon) (680-7001) | EACH | 1 | $3,559.79 | $20,758 | $3,500.00 | $10,000 | $3,600.00 | $3,737.50 |
| 118 | Temporary traffic signals (681-7001) | EACH | 3 | $5,000.00 | $12,459 | $7,000.00 | $10,000 | $7,000.00 | $7,475.00 |
| 119 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 4 | $316.37 | $105.00 | $485.00 | $375.00 | $345.00 | $517.50 |
| 120 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 2 | $317.87 | $105.00 | $485.00 | $375.00 | $345.00 | $517.50 |
| 121 | Traffic signal CBL (type A)(12 AWG)(3 conductor) (684-7008) | LF | 221 | $2.69 | $2.40 | $3.00 | $2.75 | $2.45 | $3.22 |
| 122 | Removal of conduit (690-7001) | LF | 10 | $4.56 | $6.35 | $35.00 | $4.50 | $2.00 | $36.80 |
| 123 | Remove traffic signal (690-7100) | EACH | 1 | $7,285.71 | $6,458.00 | $3,450.00 | $7,000.00 | $2,500.00 | $3,680.00 |
| 124 | Bonding course (3007-7001) | GAL | 23,679 | $5.00 | $2.79 | $1.00 | $3.25 | $3.56 | $4.03 |
| 125 | Bird exclusion method (5029-7001) | SF | 1,324 | $10.00 | $1.50 | $23.00 | $25.00 | $7.60 | $10.00 |
| 126 | Trail MNT sol PRD rad speed CNT monitor (6025-7002) | EACH | 4 | $10,000 | $5,000.00 | $13,400 | $10,000 | $11,850 | $10,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.