TxDOT letting results, March 4, 2026
33 contracts let by Texas DOT on March 4, 2026, $296,182,300 in low bids, a median of 6 bidders per contract. On the 33 with an engineer's estimate, the low bid came in under it 27 times; median low bid -15% against the estimate.
- Owner
- Texas DOT
- Contracts
- 33
- Low bids, total
- $296,182,300
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00020688 | Interchange Improvement, US 67 (AT LAKE RIDGE PKWY to .) | Dallas District | 9 | Highway 19 Construction LLC | $63,703,074 | $64,759,007 | +2.0% | 0.0% | TxDOT |
| A00062293 | Widen Road - Add Lanes And Shoulders, US 82 (Red River C/L to 0.1 Mi W of US 259) | Atlanta District | 7 | Highway 19 Construction LLC | $54,806,522 | $55,995,702 | +2.0% | -9.0% | TxDOT |
| A00212869 | FERRY RAMP REPAIR, SH0087 (Galveston Landing to Port Aransas Landing) | Houston District | 1 | Texas Gulf Construction Company, Inc. | $40,819,142 | +19% | TxDOT | ||
| A00127306 | Rehabilitate Existing Roadway, SH 44 (US 59 to 4 MI EAST OF US 59) | Laredo District | 5 | Hunter Industries, LTD. | $18,216,991 | $18,582,416 | +2.0% | -17% | TxDOT |
| A00132533 | Bridge Replacement, SS 348 (LP 12 NB to IH 35E NB DIRECT CONNECTORS) | Dallas District | 9 | Highway 19 Construction LLC | $16,606,597 | $16,856,015 | +2.0% | +3.0% | TxDOT |
| A00002148 | Bridge Replacement, FM 219 (@ CHILDRESS CRK to (STR #014)) | Waco District | 4 | Knife River Corporation - South | $14,455,829 | $15,106,911 | +5.0% | -16% | TxDOT |
| A00197420 | Rehabilitate Existing Roadway, FM 2790 (FM 471 to Medina/Atascosa C/L) | San Antonio District | 9 | Dean Word Company, LTD. | $11,778,114 | $11,904,134 | +1.0% | -27% | TxDOT |
| A00211390 | Preventive Maintenance, US 67 (US 83 to Elm Creek) | San Angelo District | 3 | RK Hall, LLC | $10,981,878 | $13,002,580 | +18% | -22% | TxDOT |
| A00193354 | Widen Road - Add Lanes And Shoulders, FM 89 (1.219 MILES SOUTH OF ELM CREEK to ELM CREEK) | Abilene District | 5 | J. H. Strain & Sons, Inc. | $6,284,525 | $6,362,078 | +1.0% | +1.0% | TxDOT |
| A00197433 | Resurface Roadway, US 281 (Bulverde Crossing to Bexar/Comal County Line) | San Antonio District | 6 | Texas Materials Group, Inc. | $5,825,981 | $6,264,913 | +8.0% | -37% | TxDOT |
| A00209030 | Surfacing/Roadway Restoration, US 59 (FM 1359 to McMullen County Line) | Corpus Christi District | 5 | Hunter Industries, LTD. | $5,311,274 | $5,551,533 | +5.0% | -5.0% | TxDOT |
| A00188550 | Rehabilitate Bridge, N HUGHES (N HUGHES ST @ BNSF RR to .) | Amarillo District | 6 | Altus Construction LLC | $4,519,471 | $6,120,788 | +35% | -22% | TxDOT |
| A00183875 | Preventive Maintenance, US 90 (18.1 MI S OF JEFF DAVIS COUNTY LINE to SH 17) | El Paso District | 3 | Elite Kings Construction, LLC | $4,176,256 | $4,249,827 | +2.0% | -13% | TxDOT |
| A00129761 | Surfacing/Roadway Restoration, SH 171 (N Second St., Hubbard to Limestone CL) | Waco District | 3 | Big Creek Construction, LTD. | $3,387,033 | $3,518,101 | +4.0% | -18% | TxDOT |
| A00188698 | Surfacing/Roadway Restoration, FM 517 (SH 146 to FM 646) | Houston District | 7 | Elite Kings Construction, LLC | $3,316,075 | $3,362,976 | +1.0% | -15% | TxDOT |
| A00215071 | Construct Pedestrian Infrastructure, US 87 (.1 MILES NORTH OF RUSSELL LONG BLVD to US 60 / US 87 SPLIT) | Amarillo District | 1 of 5 | STX Civil | $3,206,580 | -7.0% | TxDOT | ||
| A00215737 | Install/Replace Signs, IH 45 (Various Locations Districtwide to .) | Houston District | 12 | Elite Kings Construction, LLC | $2,725,853 | $2,910,019 | +7.0% | -26% | TxDOT |
| A00219788 | SWEEPING AND DEBRIS REMOVAL, IH0037 (Various In Nueces, Aransas, & to San Patricio Counties) | Corpus Christi District | 2 | Sweeping Corporation of America, LLC | $2,369,854 | $4,111,384 | +73% | -16% | TxDOT |
| A00209031 | Rehabilitate Existing Roadway, IH 37 (SH 234 to Cooper Rd (CR54)) | Corpus Christi District | 7 | Anderson Columbia Co., Inc. | $2,258,368 | $2,624,511 | +16% | -5.0% | TxDOT |
| A00207039 | Construct Pedestrian Infrastructure, FM 1306 (FM 51 to Gainesville High School) | Wichita Falls District | 12 | Texas Steel Industrial Placing, LLC | $2,192,972 | $2,231,704 | +2.0% | -23% | TxDOT |
| A00213451 | Landscape Development, Various (Various Locations Districtwide to .) | San Antonio District | 5 | Central North Construction, LLC | $2,101,093 | $2,935,021 | +40% | -20% | TxDOT |
| A00139359 | Bicycle And Pedestrian Improvements, SL 8 (Briar Forest Drive to Briar Hill Drive) | Houston District | 9 | Forde Construction Company, Inc. | $2,049,391 | $2,051,247 | 0.0% | -46% | TxDOT |
| A00210233 | Surfacing/Roadway Restoration, IH 45 (SL 8(S) to Galveston County Line) | Houston District | 4 | Professional Traffic Control LLC | $1,953,428 | $2,049,082 | +5.0% | +33% | TxDOT |
| A00197378 | Preventive Maintenance, FM 2001 (SH 21 to 0.37 MI N of Satterwhite Rd) | Austin District | 7 | Lone Star Paving Company | $1,788,338 | $1,855,948 | +4.0% | -23% | TxDOT |
| A00193516 | Hazard Elimination & Safety, US 181 (FM 351 to 0.6 miles S of BU 181J) | Corpus Christi District | 7 | Massana Construction Inc. | $1,569,681 | $2,288,897 | +46% | -10% | TxDOT |
| A00189338 | Resurface Roadway, SH 173 (SH 132 to CR 7711) | San Antonio District | 11 | Clark Construction of Texas, Inc. | $1,524,647 | $1,580,351 | +4.0% | -23% | TxDOT |
| A00193135 | Hazard Elimination & Safety, US 69 (FM 1270 to JASPER COUNTY LINE) | Lufkin District | 7 | Massana Construction Inc. | $1,511,792 | $1,736,467 | +15% | -11% | TxDOT |
| A00219636 | AGGREGATE, SH0152 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | Amarillo District | 2 | Volcanic Stone Co. | $1,456,985 | $1,480,035 | +2.0% | +5.0% | TxDOT |
| A00191889 | Bridge Replacement, CR 115 (On Browne Ave, 0.35 Mi N of SH 4 to STR# 210310AA0284001 @ Drainage Ditch) | Pharr District | 6 | Lucania Contractors LLC | $1,389,617 | $1,456,399 | +5.0% | -10% | TxDOT |
| A00218766 | REFLECTORIZED PAVEMENT MARKINGS & MARKERS, IH0030 (VARIOUS LOCATIONS WITHIN to WEST DALLAS COUNTY MAINTENANCE SECTIONS) | Dallas District | 3 | The Confidence Group, Inc | $1,238,782 | $1,249,032 | +1.0% | -5.0% | TxDOT |
| A00218322 | BRIDGE PREVENTATIVE MAINTENANCE, IH0010 (VARIOUS LOCATIONS to VARIOUS LOCATIONS) | El Paso District | 10 | Scott Tucker Construction Company, LLC | $1,025,237 | $1,049,325 | +2.0% | -21% | TxDOT |
| A00210037 | Preventive Maintenance, Various (Various Locations in Travis & to Williamson Counties.) | Austin District | 6 | Stripe Lines, Inc. | $860,992 | $874,670 | +2.0% | -6.0% | TxDOT |
| A00216831 | Bridge Maintenance, Various (Various Bridge Locations:Georgetown to Williamson, Travis counties) | Austin District | 13 | BK Field Operations LLC | $769,928 | $820,942 | +7.0% | -25% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.