TxDOT contract A00215071 bid tabulation
Construct Pedestrian Infrastructure, US 87 (.1 MILES NORTH OF RUSSELL LONG BLVD to US 60 / US 87 SPLIT). Let by Texas DOT on March 4, 2026, Randall, Amarillo District. 5 bids received; low bid $3,206,580 by STX Civil, -7.1% against the engineer's estimate of $3,452,502.
- Owner
- Texas DOT
- Letting
- 04 MAR 2026
- Pay items
- 132
- Data through
- 19 NOV 2026
1 of the 5 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | STX Civil | $3,206,580 | Low | -7.0% |
Engineer's estimate: $3,452,502.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. STX Civil |
|---|---|---|---|---|---|
| 1 | Preparation row (tree remove) (0"-12" diameter) (100-7003) | EACH | 14 | $1,000.00 | $367.00 |
| 2 | Preparation row (tree remove) (12"-24" diameter) (100-7004) | EACH | 5 | $1,500.00 | $550.00 |
| 3 | Preparation row (tree remove) (24"-36" diameter) (100-7005) | EACH | 4 | $2,500.00 | $428.00 |
| 4 | Removing concrete (pavement) (104-7001) | SY | 386 | $35.00 | $18.00 |
| 5 | Removing concrete (mowstrip) (104-7003) | SY | 19 | $15.00 | $20.00 |
| 6 | Removing concrete (driveways) (104-7011) | SY | 220 | $15.00 | |
| 7 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 499 | $30.00 | $13.00 |
| 8 | Removing concrete (curb & gutter) (104-7017) | LF | 1,030 | $8.00 | |
| 9 | Removing concrete (curb or curb & gutter) (104-7018) | LF | 169 | $12.00 | $8.00 |
| 10 | Removing concrete (sawcut) (104-7020) | LF | 179 | $67.00 | |
| 11 | Removing concrete (flume) (104-7041) | SY | 113 | $15.00 | $20.00 |
| 12 | Remove (3") TRT/untrt base & asphalt pavement (105-7023) | SY | 587 | $10.00 | $12.00 |
| 13 | Remove (10") TRT/untrt base & asphalt pavement (105-7030) | SY | 1,100 | $15.00 | |
| 14 | Obliterating abandoned road (106-7002) | SY | 452 | $15.00 | $25.00 |
| 15 | Excavation (special) (110-7003) | CY | 135 | $60.00 | $67.00 |
| 16 | Embankment (final)(DC)(type B) (132-7004) | CY | 1,665 | $40.00 | $30.00 |
| 17 | Furn & place topsoil (3") (160-7001) | SY | 950 | $10.00 | |
| 18 | Broadcast seed (permanent_urban_sand) (164-7003) | SY | 12,287 | $0.50 | $0.50 |
| 19 | Broadcast seed (temporary_warm_cool) (164-7007) | SY | 13,237 | $0.25 | $0.50 |
| 20 | Soil ret BLKT(SL_mod_sand_long) (169-7004) | SY | 12,287 | $4.00 | $8.00 |
| 21 | Rdside amenity (wheel stop removing&reset) (194-7008) | EACH | 25 | $190.00 | |
| 22 | D-GR HMA type D sac-A PG70-28 (341-7053) | TON | 436 | $185.00 | $342.00 |
| 23 | Tack coat (341-7082) | GAL | 670 | $9.00 | $6.00 |
| 24 | Flexible pavement structure repair(10") (351-7009) | SY | 1,000 | $70.00 | |
| 25 | Planing asphalt concrete pavement (0" to 1.5") (354-7073) | SY | 5,058 | $5.20 | $3.00 |
| 26 | Concrete pavement (joint reinforced) (8") (360-7092) | SY | 450 | $220.00 | |
| 27 | Cem stabil BKFL (400-7010) | CY | 3 | $325.00 | $675.00 |
| 28 | Trench excavation protection (402-7001) | LF | 1,107 | $4.00 | $10.00 |
| 29 | Temporary special shoring (403-7001) | SF | 2,716 | $30.00 | $20.00 |
| 30 | Soil nail anchors (410-7001) | LF | 608 | $35.00 | $70.00 |
| 31 | Drilled shaft (sign mounts) (24 in) (416-7028) | LF | 40 | $280.00 | $300.00 |
| 32 | Class A concrete (miscellaneous) (420-7002) | CY | 35 | $715.00 | $800.00 |
| 33 | Class A concrete (flume) (420-7006) | CY | 146 | $715.00 | $800.00 |
| 34 | Class A concrete (collar) (420-7008) | EACH | 9 | $1,100.00 | $1,000.00 |
| 35 | Class C concrete (rail foundation) (420-7052) | CY | 175 | $790.00 | $800.00 |
| 36 | Retaining wall (MSE) (423-7001) | SF | 3,422 | $130.00 | $70.00 |
| 37 | Retaining wall (spread footing) (423-7015) | SF | 98 | $110.00 | $117.00 |
| 38 | Retaining wall (soil nail) (fascia) (423-7023) | SF | 527 | $80.00 | $117.00 |
| 39 | Concrete paint finish (427-7002) | SF | 4,460 | $1.00 | $9.00 |
| 40 | Riprap (concrete)(4 in) (432-7001) | CY | 12 | $700.00 | $705.00 |
| 41 | Riprap (concrete)(5 in) (432-7002) | CY | 8 | $700.00 | $735.00 |
| 42 | Riprap (concrete)(CL A) (432-7004) | CY | 6 | $700.00 | $1,040.00 |
| 43 | Riprap (mow strip)(4 in) (432-7013) | CY | 41 | $700.00 | $795.00 |
| 44 | Rail (type C221) (450-7032) | LF | 1,143 | $165.00 | $205.00 |
| 45 | Rail (handrail)(type F) (450-7063) | LF | 152 | $120.00 | $185.00 |
| 46 | Gabion mattresses (galvanized)(12 in) (459-7007) | SY | 86 | $90.00 | $238.00 |
| 47 | CMP (gal steel 24 in) (460-7005) | LF | 65 | $80.00 | $269.00 |
| 48 | RC pipe (CL III)(24 in) (464-7005) | LF | 0 | $105.00 | $0.00 |
| 49 | RC pipe (CL III)(36 in) (464-7009) | LF | 0 | $200.00 | $0.00 |
| 50 | Junction box(complete)(PJB)(3FTX3FT) (465-7005) | EACH | 1 | $7,500.00 | $7,350.00 |
| 51 | Junction box(complete)(PJB)(4FTX4FT) (465-7006) | EACH | 1 | $9,000.00 | $7,850.00 |
| 52 | Inlet (complete)(pco)(3FT)(right) (465-7015) | EACH | 1 | $11,000 | $4,300.00 |
| 53 | Inlet (complete)(pco)(3FT)(both) (465-7016) | EACH | 2 | $12,200 | $4,300.00 |
| 54 | Inlet (complete)(pco)(4FT)(both) (465-7020) | EACH | 1 | $13,000 | $7,835.00 |
| 55 | Inlet(complete)(pazd)(FG)(3FTX3FT-3FTX3FT) (465-7158) | EACH | 2 | $11,000 | $9,200.00 |
| 56 | Inl(CMP)(pazd-CZ)(FG)(4FTX4FT-4FTX4FT) (465-7165) | EACH | 2 | $13,000 | $10,400 |
| 57 | Set (type II) (24 in) (CMP) (6: 1) (P) (467-7324) | EACH | 1 | $2,900.00 | $4,285.00 |
| 58 | Grate and frame (bridge drain) (471-7006) | EACH | 2 | $2,700.00 | $1,470.00 |
| 59 | Adjusting manholes (cap) (479-7005) | EACH | 2 | $615.00 | |
| 60 | Adjusting manholes (water valve box) (479-7007) | EACH | 6 | $367.00 | |
| 61 | Adjusting manholes (water meter) (479-7008) | EACH | 1 | $612.00 | |
| 62 | Removing structure (set) (496-7004) | EACH | 2 | $900.00 | $700.00 |
| 63 | Removing structure (headwall) (496-7006) | EACH | 1 | $900.00 | $1,835.00 |
| 64 | Removing structure (small) (496-7036) | EACH | 1 | $900.00 | $1,470.00 |
| 65 | Mobilization (500-7001) | LS | 1 | $275,000 | $265,000 |
| 66 | Barricades, signs and traffic handling (502-7001) | MO | 10 | $12,500 | $3,000.00 |
| 67 | Portable changeable message sign (503-7002) | EACH | 1 | $13,000 | $7,500.00 |
| 68 | TMA (stationary) (505-7001) | DAY | 140 | $300.00 | $185.00 |
| 69 | TMA (mobile operation) (505-7002) | HR | 10 | $105.00 | $200.00 |
| 70 | Temporary sediment control fence (install) (506-7039) | LF | 211 | $6.00 | $3.00 |
| 71 | Temporary sediment control fence (remove) (506-7041) | LF | 211 | $1.00 | $1.00 |
| 72 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 674 | $6.00 | $8.00 |
| 73 | Biodegradable erosion control logs (remove) (506-7046) | LF | 674 | $1.00 | $1.00 |
| 74 | Colored textured concrete (5") (527-7002) | SY | 230 | $107.00 | $200.00 |
| 75 | Concrete curb (type II) (529-7002) | LF | 521 | $46.00 | $23.00 |
| 76 | Concrete curb & gutter (type II) (529-7009) | LF | 627 | $50.00 | $42.00 |
| 77 | Driveways (concrete) (530-7006) | SY | 620 | $115.00 | |
| 78 | Concrete sidewalks (5") (531-7002) | SY | 5,146 | $95.00 | $75.00 |
| 79 | Concrete sidewalk (steps) (531-7004) | SY | 3 | $675.00 | |
| 80 | Curb ramps (type 1) (531-7005) | EACH | 26 | $1,200.00 | |
| 81 | Curb ramps (type 2) (531-7006) | EACH | 13 | $1,200.00 | |
| 82 | Concrete sidewalk (retaining wall) (531-7026) | CY | 81 | $1,500.00 | $490.00 |
| 83 | Concrete sidewalks (special) (type A) (531-7029) | SY | 78 | $270.00 | $500.00 |
| 84 | Metal W-beam guard fence (steel post) (540-7002) | LF | 525 | $38.00 | $75.00 |
| 85 | Downstream anchor terminal section (540-7015) | EACH | 1 | $1,500.00 | $2,500.00 |
| 86 | Remove metal beam guard fence (542-7001) | LF | 280 | $4.00 | $1.00 |
| 87 | Remove terminal anchor section (542-7002) | EACH | 2 | $300.00 | $350.00 |
| 88 | Guardrail end treatment (install) (544-7001) | EACH | 1 | $3,500.00 | $4,000.00 |
| 89 | Chain link fence (install) (4') (550-7003) | LF | 350 | $60.00 | |
| 90 | Chain link fence (remove) (550-7007) | LF | 360 | $1.00 | |
| 91 | Gate (special) (552-7009) | EACH | 1 | $10,000 | |
| 92 | Aluminum signs (type G) (636-7002) | SF | 244 | $35.00 | $80.00 |
| 93 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 40 | $1,000.00 | $550.00 |
| 94 | Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009) | EACH | 3 | $1,100.00 | $920.00 |
| 95 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 1 | $1,200.00 | $930.00 |
| 96 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 27 | $245.00 | |
| 97 | Remove SM RD SN sup&AM (644-7073) | EACH | 17 | $120.00 | $95.00 |
| 98 | Install LRSS (struct steel) (647-7001) | LB | 1,556 | $11.00 | $9.00 |
| 99 | Remove lrsa (647-7003) | EACH | 2 | $1,070.00 | $1,500.00 |
| 100 | Remove overhd sign sup (650-7193) | EACH | 1 | $10,550 | $10,000 |
| 101 | Install delineator assembly (D-SW)SZ 1(WFLX)GF2 (658-7001) | EACH | 11 | $25.00 | $75.00 |
| 102 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 23 | $25.00 | $50.00 |
| 103 | Remove delin & object marker assms (658-7078) | EACH | 10 | $20.00 | $25.00 |
| 104 | Install OM SM RD sign (1-OM-PW)Y (658-7317) | EACH | 14 | $10.00 | $250.00 |
| 105 | Install OM LG RD sign (2-OM-PW)Y (658-7321) | EACH | 1 | $10.00 | $250.00 |
| 106 | Install OM LG RD sign (3-OM-PW)Y (658-7322) | EACH | 1 | $10.00 | $250.00 |
| 107 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 134 | $2.00 | $1.50 |
| 108 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 40 | $1.00 | $1.50 |
| 109 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 370 | $1.60 | $5.00 |
| 110 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 145 | $8.00 | $17.00 |
| 111 | Reflectorized pavement marking type II (W) 4" (solid) (666-7171) | LF | 1,270 | $2.50 | |
| 112 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 2,927 | $2.60 | |
| 113 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 1,297 | $8.00 | |
| 114 | Reflectorized pavement marking type II (W) (arrow) (666-7186) | EACH | 2 | $125.00 | |
| 115 | Reflectorized pavement marking type II (W) (bike arrow) (666-7203) | EACH | 16 | $125.00 | |
| 116 | Reflectorized pavement marking type II (W) (bike symbol) (666-7205) | EACH | 16 | $200.00 | |
| 117 | Reflectorized pavement marking type II (Y) 4" (broken) (666-7208) | LF | 390 | $2.50 | |
| 118 | Reflectorized pavement marking type II (Y) 6" (broken) (666-7211) | LF | 420 | $2.60 | |
| 119 | Reflectorized pavement marking type II (Y)(curb) (666-7221) | LF | 450 | $8.00 | |
| 120 | Reflectorized pavement marking type II (R&W) 6" (fire lane) (666-7230) | LF | 60 | $25.00 | |
| 121 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 120 | $0.70 | $5.00 |
| 122 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 1,175 | $0.70 | $5.00 |
| 123 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 805 | $0.70 | $5.00 |
| 124 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 14 | $11.00 | $20.00 |
| 125 | Eliminating existing PM & markers (4") (677-7001) | LF | 620 | $5.00 | |
| 126 | Eliminating existing PM & markers (12") (677-7006) | LF | 850 | $8.00 | |
| 127 | Replace of timber poles (690-7022) | EACH | 11 | $675.00 | |
| 128 | Replace down guy and anchor W/guard (690-7082) | EACH | 5 | $3,100.00 | |
| 129 | Anti-graffiti coatng (permnent-type III) (740-7006) | SF | 4,460 | $0.50 | $9.00 |
| 130 | Tied-concrete block erosion control mat (2005-7001) | SF | 150 | $12.00 | $95.00 |
| 131 | Thermoplastic pipe (PP) (24") (468-7002) | LF | 593 | $105.00 | $55.00 |
| 132 | Thermoplastic pipe (PP) (36") (468-7004) | LF | 485 | $200.00 | $95.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.