TxDOT contract A00020688 bid tabulation

Interchange Improvement, US 67 (AT LAKE RIDGE PKWY to .). Let by Texas DOT on March 4, 2026, Ellis, Dallas District. 9 bids received; low bid $63,703,074 by Highway 19 Construction LLC, -0.1% against the engineer's estimate of $63,765,204.

Owner
Texas DOT
Letting
04 MAR 2026
Pay items
255
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Highway 19 Construction LLC$63,703,074Low0.0%
2RPM Xconstruction, LLC$64,759,007+2.0%+2.0%
3Harper Brothers Construction LLC$66,338,016+4.0%+4.0%
4Webber, LLC$67,440,046+6.0%+6.0%
5Granite Construction Company$68,859,637+8.0%+8.0%
6Mario Sinacola & Sons Excavating, Inc.$73,360,305+15%+15%
7Zachry Construction Corporation$73,861,075+16%+16%
8Sema Construction, Inc.$74,989,385+18%+18%
9Austin Bridge & Road Services, LP$86,099,270+35%+35%
TxDOT contract A00020688: bids by rank

Engineer's estimate: $63,765,204.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Highway 19 Construction LLC2. RPM Xconstruction, LLC3. Harper Brothers Construction LLC4. Webber, LLC5. Granite Construction Company6. Mario Sinacola & Sons Excavating, Inc.
1Preparing row (100-7002)STA125$10,000$300.00$9,000.00$4,000.00$27,609$49,400$15,000
2Removing concrete (pavement) (104-7001)SY59,167$12.00$13.00$2.50$6.00$12.60$4.80$9.00
3Removing concrete (riprap) (104-7006)SY2,264$12.50$15.00$5.00$10.17$20.20$4.40$9.00
4Removing concrete (pavers) (104-7010)SY320$9.20$25.00$12.00$12.73$16.10$4.00$9.00
5Removing concrete (driveways) (104-7011)SY2,849$20.00$9.00$6.93$18.60$8.00$9.00
6Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY400$25.00$20.00$8.00$10.58$25.20$4.00$9.00
7Removing concrete (curb or curb & gutter) (104-7018)LF245$12.50$10.00$1.80$10.90$18.50$1.00$9.00
8Removing concrete (traffic barrier) (104-7035)LF6,352$15.00$10.00$13.70$10.65$21.60$15.00$11.00
9Remove (4"-8") TRT/untrt base & asphalt pavement (105-7004)SY70,165$8.00$4.00$3.50$3.50$4.00$4.00$4.00
10Remove (8"-14") TRT/untrt base & asphalt pavement (105-7059)SY70,504$10.00$5.00$5.00$5.50$8.35$7.00$9.00
11Excavation (roadway) (110-7001)CY168,119.08$5.00$4.52$6.80$5.00$9.15$12.00$12.00
12Embankment (final)(DC)(type C1) (132-7008)CY341,039.83$12.00$11.00$19.50$16.00$11.70$17.00$20.00
13Embankment (final)(DC)(type C2) (132-7010)CY18,515.52$30.00$11.00$27.00$28.00$149.00$65.00$30.00
14Compost manuf topsoil (4") (161-7002)SY306,274$1.00$1.00$1.80$1.23$1.65$1.70$2.00
15Block sodding (162-7002)SY306,274$3.00$3.85$3.50$3.42$3.40$3.45$3.42
16Drill seed (temporary_warm) (164-7013)SY153,137$0.12$0.13$0.01$0.12$0.10$0.10$0.12
17Drill seed (temporary_cool) (164-7014)SY153,137$0.12$0.13$0.01$0.12$0.10$0.10$0.12
18Vegetative watering (168-7001)TGL91,122.55$1.00$1.00$0.10$8.00$7.55$0.10$0.10
19Proof rolling (216-7001)HR2$110.00$100.00$618.00$300.00$287.00$115.00$115.00
20Lime (com or QK)(slurry) (260-7005)TON2,722$295.00$350.00$300.00$404.55$298.00$325.00$300.00
21Lime TRT (existing material)(6") (260-7006)SY1,618$5.00$3.50$3.00$10.76$23.50$7.00$5.00
22Lime TRT (existing material)(10") (260-7008)SY97,228$6.00$7.00$2.80$5.38$3.65$5.00$6.00
23Lime TRT (existing material)(12") (260-7009)SY87,218$8.00$7.00$3.20$7.76$3.20$6.00$7.00
24SP mixes SP-B PG64-22 (344-7001)TON42,611$110.00$111.00$112.00$108.10$108.00$109.09$108.10
25SP mixes SP-C sac-A PG70-22 (344-7020)TON179$200.00$200.00$273.00$200.00$262.00$264.61$262.20
26Concrete pavement (CRCP) (11") (360-7005)SY89,247$85.00$95.00$85.00$80.00$81.75$81.00$78.00
27Concrete pavement (CRCP) (13") (360-7007)SY77,416$105.00$104.00$87.00$85.00$91.00$92.00$92.00
28Concrete pavement (CPCD) (11") (360-7021)SY9,146$90.00$103.00$73.00$85.88$99.50$80.00$84.00
29Cut & restoring pavement (400-7006)SY344$105.75$250.00$195.00$188.64$214.00$175.00$200.00
30Cem stabil BKFL (400-7010)CY500$165.75$180.00$289.00$212.96$176.00$100.00$213.00
31Trench excavation protection (402-7001)LF4,770$2.80$10.00$2.40$5.00$7.05$20.00$10.00
32Temporary special shoring (403-7001)SF41,080$30.00$55.00$28.00$31.89$36.25$30.00$56.00
33Drilled shaft (18 in) (416-7002)LF376$225.00$150.00$139.00$194.62$124.00$100.00$100.00
34Drilled shaft (36 in) (416-7006)LF354$300.00$250.00$240.00$316.47$228.00$210.00$250.00
35Drilled shaft (42 in) (416-7007)LF2,416$275.00$265.00$259.00$271.17$241.00$240.00$275.00
36Drilled shaft (sign mounts) (24 in) (416-7028)LF82$295.90$184.00$280.00$232.00$184.00$185.85$230.00
37Drilled shaft (sign mounts) (54 in) (416-7033)LF55$690.00$717.00$841.00$705.00$717.00$724.25$685.00
38Drilled shaft (roadway illumination pole) (30 in) (416-7040)LF408$479.73$265.00$322.00$236.25$265.00$305.00$275.00
39Drilled shaft (traffic signal pole) (30 in) (416-7043)LF33$383.90$415.00$561.00$699.00$415.00$477.65$330.00
40Drilled shaft (traffic signal pole) (36 in) (416-7044)LF39$386.61$487.00$730.00$767.00$487.00$560.50$400.00
41Class B concrete (flume) (420-7010)CY8$744.00$1,000.00$666.00$1,150.20$1,050.00$1,200.00$970.00
42Class C concrete (abutment)(HPC) (420-7013)CY238.40$1,269.00$963.00$1,240.00$1,575.03$1,340.00$1,290.00$1,500.00
43Class C concrete (cap)(HPC) (420-7023)CY188.60$1,300.00$1,000.00$1,568.00$1,525.53$1,380.00$1,200.00$1,500.00
44Class C concrete (column)(HPC) (420-7039)CY142.80$1,600.00$1,300.00$1,337.00$1,560.37$1,270.00$1,400.00$1,500.00
45Reinforced concrete slab (HPC) (422-7002)SF55,308$23.00$19.00$28.00$34.94$22.00$26.75$26.00
46Approach slab (HPC) (422-7014)CY310$500.00$750.00$649.00$1,195.35$577.00$650.00$652.00
47Retaining wall (MSE) (423-7001)SF45,663$75.00$80.00$71.00$128.64$60.50$65.00$99.00
48Retaining wall (special) (423-7029)SF4,586$110.00$92.00$157.00$208.00$41.00$80.00$120.00
49Prestressed concrete girder (TX34) (425-7002)LF884.87$200.00$275.00$220.00$304.03$199.00$200.00$185.00
50Prestressed concrete girder (TX62) (425-7006)LF6,362.93$227.50$275.00$272.00$304.24$253.00$250.00$215.00
51Riprap (concrete)(4 in) (432-7001)CY600$550.00$550.00$610.00$482.52$543.00$425.00$645.00
52Riprap (concrete)(5 in) (432-7002)CY7.10$1,000.00$648.00$654.45$567.00$800.00$900.00
53Riprap (concrete)(CL B) (432-7005)CY18.20$401.17$500.00$533.00$708.36$812.00$500.00$750.00
54Riprap (mow strip)(4 in) (432-7013)CY233$508.00$550.00$555.00$744.98$711.00$625.00$645.00
55Riprap (stone common)(dry)(12 in) (432-7031)CY200$100.50$150.00$247.00$179.20$270.00$205.00$310.00
56Rail (type SSTR) (450-7024)LF4,240$69.75$90.00$75.00$98.19$81.25$74.00$80.00
57Rail (type SSTR)(HPC) (450-7025)LF1,966.60$74.50$120.00$107.00$141.19$64.75$100.00$80.00
58Sealed expansion joint (4 in) (SEJ - M) (454-7004)LF331$226.00$180.00$203.00$270.06$225.00$300.00$220.00
59Concrete box culvert (3 FT X 2 FT) (462-7001)LF2,176$350.00$272.00$300.23$193.00$250.00$275.00
60Concrete box culvert (5 FT X 2 FT) (462-7006)LF84$450.00$478.00$1,317.68$363.00$300.00$350.00
61RC pipe (CL III)(18 in) (464-7003)LF4,232$80.00$64.00$74.20$76.55$68.25$75.00$120.00
62RC pipe (CL III)(24 in) (464-7005)LF12,034$92.00$83.00$90.00$102.04$79.00$85.00$153.00
63RC pipe (CL III)(36 in) (464-7009)LF1,254$200.00$156.00$150.00$136.76$121.00$130.00$245.00
64RC pipe (CL IV)(24 in) (464-7021)LF208$100.00$95.00$280.80$720.00$95.00$260.00
65RC pipe (CL IV)(36 in) (464-7024)LF560$247.00$181.00$243.23$710.00$130.00$310.00
66Junction box(complete)(PJB)(3FTX3FT) (465-7005)EACH40$5,000.00$4,500.00$3,840.00$6,309.12$5,920.00$1.00$9,500.00
67Inlet (complete)(pcu)(3FT)(none) (465-7029)EACH10$7,425.00$5,000.00$5,705.00$9,889.75$7,240.00$5,500.00$10,000
68Inlet (complete)(pcu)(3FT)(left) (465-7030)EACH20$6,500.00$7,500.00$6,130.00$9,913.44$7,540.00$6,000.00$10,500
69Inlet (complete)(pcu)(3FT)(right) (465-7031)EACH14$6,810.00$9,500.00$6,325.00$10,602$7,620.00$6,000.00$10,500
70Inlet (complete)(pcu)(3FT)(both) (465-7032)EACH17$8,450.00$5,750.00$6,735.00$11,041$7,980.00$6,500.00$11,600
71Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126)EACH2$5,750.00$5,230.00$7,707.36$6,360.00$4,500.00$7,600.00
72Inlet (complete)(PSL)(FG)(3FTX5FT-3FTX5FT) (465-7130)EACH8$7,836.36$6,900.00$5,665.00$9,874.15$5,710.00$5,000.00$8,000.00
73Inlet(complete)(PSL)(SFG)(4FTX4FT-4FTX4FT) (465-7147)EACH1$7,500.00$5,800.00$8,613.86$5,330.00$6,000.00$9,400.00
74Inlet(complete)(type MSE1) (465-7362)EACH41$8,000.00$6,675.00$7,640.00$7,715.21$9,490.00$7,400.00$9,820.09
75Headwall (CH - FW - 0) (diameter= 18 in) (466-7003)EACH1$6,450.00$2,500.00$5,720.00$8,089.72$8,990.00$11,000$10,250
76Headwall (CH - FW - 0) (diameter= 24 in) (466-7005)EACH2$9,730.13$4,500.00$4,880.00$6,457.13$6,220.00$10,500$5,000.00
77Headwall (CH - FW - 15) (diameter= 24 in) (466-7020)EACH1$6,872.00$4,500.00$7,410.00$9,489.56$9,810.00$11,000$11,600
78Headwall (CH - FW - 30) (diameter= 24 in) (466-7035)EACH3$7,923.05$4,500.00$6,760.00$7,778.03$9,960.00$11,000$10,000
79Headwall (CH - FW - 45) (diameter= 36 in) (466-7054)EACH1$7,200.00$8,150.00$11,066$16,520$12,500$11,300
80Headwall (CH - PW - 0) (diameter= 18 in) (466-7099)EACH1$7,800.00$3,500.00$5,595.00$6,620.08$8,890.00$11,000$9,500.00
81Headwall (CH - PW - S) (diameter= 24 in) (466-7116)EACH2$7,768.81$4,500.00$7,460.00$8,851.13$13,480$11,500$8,500.00
82Headwall (CH - PW - S) (diameter= 36 in) (466-7120)EACH3$9,984.73$7,200.00$16,550$14,412$17,990$13,500$19,275
83Wingwall (FW - 0) (HW=5 FT) (466-7147)EACH1$15,000$14,720$13,924$12,930$14,000$27,000
84Wingwall (PW - 1) (HW=4 FT) (466-7174)EACH1$12,000$13,290$14,532$15,940$14,700$19,000
85Wingwall (PW - 1) (HW=5 FT) (466-7175)EACH1$15,000$22,525$20,916$19,700$16,700$33,500
86Set (type I) (24 in) (4: 1) (C) (467-7006)EACH1$2,175.00$950.00$1,635.00$11,027$11,190$5,500.00$3,000.00
87Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306)EACH1$950.00$1,295.00$2,312.11$1,420.00$1,600.00$2,750.00
88Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH16$1,200.00$1,150.00$1,370.00$2,016.67$1,790.00$2,000.00$3,000.00
89Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327)EACH1$2,550.00$1,600.00$1,635.00$2,622.91$1,719.01$2,200.00$3,350.00
90Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH33$2,256.93$1,600.00$1,640.00$2,164.13$1,660.00$2,200.00$3,350.00
91Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368)EACH4$6,910.00$4,950.00$5,218.46$3,710.00$7,500.00$8,000.00
92Jack bor or tun pipe(24 in)(RC)(CL IV) (476-7021)LF76$250.00$860.00$1,610.77$720.00$900.00$925.00
93Jack bor or tun pipe(36 in)(RC)(CL IV) (476-7023)LF466$2,000.00$350.00$1,445.00$1,456.34$710.00$1,400.00$1,175.00
94Removing structure (inlet) (496-7002)EACH8$500.00$1,125.00$584.85$1,080.00$650.00$1,500.00
95Removing structure (set) (496-7004)EACH34$350.00$500.00$747.00$397.80$723.00$384.10$950.00
96Removing structure (wingwall) (496-7005)EACH1$1,000.00$2,430.00$2,339.40$2,170.00$1,540.95$3,500.00
97Removing structure (pipe) (496-7007)LF4,986$31.75$10.00$25.00$16.29$25.60$20.00$35.00
98Mobilization (500-7001)LS1$5,797,128$6,000,000$6,400,000$4,300,000$6,744,000$6,000,000$7,200,000
99Barricades, signs and traffic handling (502-7001)MO32$20,000$5,000.00$15,000$18,000$38,430$18,000$40,000
100TMA (stationary) (505-7001)DAY963$170.00$250.00$220.00$150.00$122.00$190.00$300.00
101TMA (mobile operation) (505-7003)DAY30$300.00$1,000.00$1,040.00$894.32$808.00$100.00$1,500.00
102Rock filter dams (install) (type 2) (506-7002)LF1,112$33.85$45.00$50.00$43.17$43.00$43.60$35.00
103Rock filter dams (remove) (506-7011)LF1,112$18.52$5.00$17.50$15.17$5.00$15.30$5.00
104Construction exits (install) (type 1) (506-7020)SY246$29.28$35.00$59.00$51.33$33.25$10.00$30.00
105Temporary sediment control fence (install) (506-7039)LF10,516$3.20$3.00$4.00$3.52$3.50$3.55$3.15
106Temporary sediment control fence (remove) (506-7041)LF10,516$0.96$1.00$0.90$0.80$0.80$0.80$0.10
107Biodegradable erosion control logs (install) (12") (506-7044)LF2,920$4.90$4.00$7.40$6.50$4.00$6.55$3.25
108Biodegradable erosion control logs (remove) (506-7046)LF2,920$1.55$1.00$1.10$0.93$1.00$0.95$0.25
109Constructing detours (508-7001)SY23,650$85.00$75.00$88.00$73.35$89.25$90.00$120.00
110Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005)LF18,316$30.00$79.00$49.00$25.22$19.00$36.75$20.00
111Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009)LF580$60.00$90.00$82.00$78.41$56.25$78.40$47.00
112Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010)LF20$60.00$110.00$733.00$332.06$106.00$141.25$65.00
113Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029)LF32,085$7.80$10.00$3.75$5.01$5.85$5.40$5.00
114Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053)LF18,316$9.00$25.00$4.80$11.38$8.00$7.98$5.00
115Portable concrete traffic barrier (pinning) (512-7071)EACH1,287$60.00$10.00$97.00$153.87$128.00$54.80$120.00
116Permanent CTB (single slope) (type 1) (42 ) (514-7001)LF4,380$108.00$84.00$112.00$105.53$82.25$95.00$80.00
117Permanent CTB (F-shape) (type 1) (514-7013)LF1,645$100.00$80.00$94.00$77.83$78.50$110.00$125.00
118Colored textured concrete (6") (527-7003)SY4,032$100.00$180.00$192.00$169.09$87.50$65.00$150.00
119Concrete curb (mono) (type II) (529-7007)LF34,328$3.25$10.00$2.50$1.89$4.05$7.00$1.00
120Concrete curb & gutter (type II) (529-7009)LF525$35.00$27.00$44.02$36.00$45.00$48.00
121Driveways (concrete) (530-7006)SY4,293$90.00$96.00$97.00$90.28$108.00$90.00$100.00
122Concrete sidewalks (4") (531-7001)SY260$95.00$66.00$62.00$67.39$103.00$55.00$80.00
123Curb ramps (type 1) (531-7005)EACH2$3,900.00$1,500.00$2,391.00$2,897.80$3,610.00$3,400.00$2,900.00
124Curb ramps (type 21) (531-7013)EACH1$4,750.00$2,100.00$2,543.00$2,998.31$6,440.00$4,200.00$3,400.00
125Curb ramps (type 22) (531-7014)EACH2$5,200.00$1,800.00$4,189.00$3,397.80$6,170.00$4,500.00$3,500.00
126Mill rumble strips (concrete) (shoulder) (533-7003)LF25,497$0.65$0.25$0.85$1.62$1.00$1.00$1.00
127Fill milled concr rumble strips (shoulder) (533-7007)LF23,539$0.10$1.00$14.00$13.77$13.80$3.00$15.00
128Concrete median (mono nose) (536-7006)SY48$190.00$180.00$221.00$197.60$321.00$200.00$160.00
129Right of way markers (538-7001)EACH36$309.00$405.00$447.00$405.00$503.00$500.00$405.00
130Metal W-beam guard fence (timber post) (540-7001)LF1,210$25.25$26.00$23.00$25.00$22.50$22.75$22.50
131Metal beam guard fence trans (thrie-beam) (540-7005)EACH6$2,175.00$1,850.00$1,976.00$1,990.00$1,900.00$1,919.20$1,900.00
132Downstream anchor terminal section (540-7015)EACH10$1,275.00$1,250.00$1,248.00$1,485.00$1,200.00$1,212.10$1,200.00
133Remove metal beam guard fence (542-7001)LF430$3.00$3.00$2.75$2.75$2.80$2.75
134Remove terminal anchor section (542-7002)EACH1$250.00$156.00$275.00$150.00$151.50$150.00
135Guardrail end treatment (install) (544-7001)EACH10$3,100.00$3,500.00$3,068.00$3,169.00$2,950.00$3,012.72$2,950.00
136Crash cushion attenuator (move & reset) (545-7002)EACH18$1,585.00$1,000.00$1,185.00$1,169.00$1,440.00$833.40$1,600.00
137Crash cushion attenuator (remove) (545-7004)EACH6$910.00$500.00$790.00$885.00$646.00$1,250.10$1,600.00
138Crash cushion attenuator (install)(R)(N)(TL3) (545-7010)EACH1$25,500$30,000$24,764$29,810$19,190$25,000$25,000
139Crash cushion attenuator (install)(S)(N)(TL3) (545-7014)EACH6$7,850.00$7,500.00$9,270.00$7,570.00$7,610.00$1,380.15$10,000
140Pipe underdrains (type 6) (6") (556-7006)LF4,546$28.00$15.00$27.00$65.49$35.00$24.00$60.00
141Relocate RD IL asm (trans-base) (610-7004)EACH13$4,500.00$4,597.00$2,139.00$2,390.00$2,409.10$4,325.00
142In RD IL (U/P) (type 1) (150W EQ) LED (610-7014)EACH8$1,600.00$2,750.00$2,502.00$1,827.00$1,880.00$2,158.00$2,750.00
143In RD IL (type SA) 40T-8 (250W EQ) LED (610-7124)EACH38$3,500.00$5,075.00$6,350.00$3,954.00$4,680.00$5,390.90$5,075.00
144Conduit (PVC) (schedule 40) (2") (618-7030)LF18,023$12.00$15.00$11.45$12.74$8.95$10.30$15.00
145Conduit (PVC) (schedule 40) (2") (bore) (618-7031)LF1,495$35.99$33.00$26.00$32.45$28.60$32.90$33.00
146Conduit (PVC) (schedule 40) (3") (618-7036)LF132$25.39$17.00$18.20$32.55$11.40$13.15$17.00
147Conduit (PVC) (schedule 40) (4") (618-7040)LF808$32.00$19.00$19.50$33.60$21.00$24.15$19.00
148Conduit (PVC) (schedule 40) (4") (bore) (618-7041)LF375$57.97$45.00$36.50$63.00$39.75$45.70$45.00
149Conduit (PVC) (schedule 80) (2") (618-7054)LF33$26.00$20.00$40.00$31.50$10.60$12.15$20.00
150Conduit (RM) (1") (618-7072)LF205$29.36$35.00$40.00$44.25$25.00$28.75$35.00
151Conduit (RM) (2") (618-7078)LF40$52.00$45.00$59.30$81.85$38.00$43.75$45.00
152Electrical conductor (no.12) insulated (620-7004)LF935$2.10$1.75$1.82$1.60$1.00$1.15$1.75
153Electrical conductor (no.8) bare (620-7007)LF20,382$2.11$2.00$2.00$2.48$1.70$1.95$2.00
154Electrical conductor (no.8) insulated (620-7008)LF43,552$2.66$2.30$2.30$2.46$1.55$1.80$2.30
155Electrical conductor (no.6) bare (620-7009)LF1,361$3.03$2.60$2.40$3.15$2.25$2.60$2.60
156Electrical conductor (no.4) insulated (620-7012)LF169$3.33$4.50$3.65$4.20$3.65$4.20$4.50
157Tray cable (3 conductor) (12 AWG) (621-7002)LF2,606$4.22$3.80$2.30$3.15$2.40$2.75$3.80
158Ground box type A (122311)W/apron (624-7002)EACH37$2,108.78$1,400.00$1,540.00$1,860.00$895.00$1,030.10$1,400.00
159Ground box type C (162911)W/apron (624-7006)EACH10$2,189.45$1,825.00$1,705.00$2,573.00$1,380.00$1,587.10$1,825.00
160Remove ground box (624-7013)EACH5$500.00$592.00$435.00$210.00$241.70$500.00
161Elc SRV type A 240/480 060(NS)SS(E)GC(O) (628-7044)EACH2$13,000$12,000$13,650$10,930$10,780$12,407$12,000
162Elc SRV type D 120/240 070(NS)SS(E)PS(U) (628-7190)EACH1$11,322$10,000$11,380$12,075$9,900.00$11,388$10,000
163Aluminum signs (type A) (636-7001)SF119.50$40.00$36.00$35.50$35.00$33.50$33.95$35.25
164Aluminum signs (type G) (636-7002)SF624$38.00$55.00$35.50$35.00$29.40$29.70$36.75
165Aluminum signs (type O) (636-7003)SF338$35.00$58.00$35.50$35.00$38.75$39.05$50.00
166Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH22$640.00$605.00$855.00$750.00$687.00$693.95$605.00
167Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH55$840.00$745.00$967.00$800.00$697.00$704.05$745.00
168Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009)EACH3$635.00$855.00$720.00$694.00$701.00$635.00
169Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012)EACH6$765.00$1,082.00$900.00$710.00$717.15$775.00
170Install small roadside sign support and assembly type 10BWG(2)SA(P-exal) (644-7018)EACH4$1,500.00$1,590.00$1,810.00$2,500.00$879.00$887.90$1,590.00
171Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH5$1,062.46$1,000.00$1,240.00$1,045.00$728.00$735.35$969.00
172Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034)EACH4$1,250.00$1,285.00$1,468.00$1,187.00$831.00$839.40$1,285.00
173Install small roadside sign support and assembly TYS80(1)SB(U) (644-7042)EACH1$1,000.00$1,355.00$895.00$855.00$863.65$999.00
174Install small roadside sign support and assembly TYS80(2)SA(P-exal) (644-7049)EACH1$2,550.00$2,605.00$2,995.00$1,220.00$1,227.25$2,445.00
175In bridge MNT clearance sign assembly(type N) (644-7061)EACH6$2,960.77$2,925.00$3,415.00$55.00$3,870.00$3,906.05$3,955.00
176Install LRSS (struct steel) (647-7001)LB3,538$10.20$8.50$8.00$30.50$6.75$6.85$8.50
177Remove lrsa (647-7003)EACH6$970.00$2,000.00$1,265.00$1,199.55$2,400.00$2,419.20$2,000.00
178Install overhead sign support(35 FT cant) (650-7038)EACH2$47,528$38,300$21,030$54,465$61,400$62,010$38,300
179Install overhead sign support(40 FT cant) (650-7045)EACH1$44,900$26,650$61,855$78,300$79,101$44,900
180Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH12$29.00$15.00$25.00$75.00$20.00$28.30$15.00
181Install delineator assembly (D-SW)SZ 1(BRF)GF1 (658-7015)EACH15$29.00$15.00$21.00$450.00$20.00$28.30$25.00
182Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031)EACH100$40.10$15.00$25.00$450.00$20.00$28.30$15.00
183Install delineator assembly (D-SY)SZ 1(BRF)GF1 (658-7034)EACH18$22.00$65.00$20.80$350.00$20.00$28.30$25.00
184Install object marker assembly (OM-2Z)(WFLX)GNDLL (658-7248)EACH70$73.25$65.00$85.30$75.00$50.00$76.65$70.00
185Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF4,557$0.42$0.22$0.42$0.45$0.35$1.00$1.00
186Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF35,437$0.42$0.29$0.35$0.37$0.30$0.75$0.75
187Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF25,846$0.46$0.29$0.35$0.37$0.30$0.75$0.75
188Work zone pavement marking removing (W)6"(broken) (662-7065)LF7,404$0.60$0.54$0.84$1.25$0.70$1.50$1.50
189Work zone pavement marking removing (W)6"(solid) (662-7068)LF67,551$0.80$0.55$0.78$1.25$0.65$1.20$1.20
190Work zone pavement marking removing (W)8"(solid) (662-7072)LF2,588$1.40$1.00$1.20$1.75$1.00$2.00$2.00
191Work zone pavement marking removing (W)12"(solid) (662-7075)LF300$5.00$2.00$2.40$3.00$2.00$5.05$5.00
192Work zone pavement marking removing (W)24"(solid) (662-7077)LF67$10.00$3.00$3.60$7.00$3.00$10.10$10.00
193Work zone pavement marking removing (Y)6"(solid) (662-7100)LF58,511$0.80$0.55$0.66$1.25$0.55$1.20$1.20
194Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF1,186$1.50$0.70$0.84$1.75$0.70$2.00$2.00
195Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF13,557$1.25$0.87$1.04$0.89$0.85$1.50$1.50
196Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF5,361$3.80$2.70$3.25$2.95$2.70$4.05$4.00
197Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF1,134$7.30$6.50$7.77$6.55$6.50$7.05$7.00
198Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH18$153.00$148.00$176.75$185.00$148.00$151.50$150.00
199Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH16$170.00$159.00$190.00$215.00$159.00$171.70$170.00
200Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123)LF2,303$11.00$6.18$7.30$6.55$6.20$6.05$6.00
201Reflectorized pavement marking type II (W) 6" (broken) (666-7172)LF9,489$0.26$0.25$0.30$0.25$0.25$0.50$0.50
202Reflectorized pavement marking type II (W) 6" (DOT) (666-7173)LF1,186$0.60$0.33$0.40$0.25$0.35$1.00$1.00
203Reflectorized pavement marking type II (W) 6" (solid) (666-7175)LF48,619$0.21$0.20$0.24$0.20$0.20$0.30$0.30
204Reflectorized pavement marking type II (W) 8" (solid) (666-7179)LF13,552$0.48$0.45$0.54$0.25$0.45$0.40$0.40
205Reflectorized pavement marking type II (W) 12" (solid) (666-7182)LF5,361$3.05$1.45$1.75$0.40$1.45$2.00$2.00
206Reflectorized pavement marking type II (W) 24" (solid) (666-7184)LF1,134$7.99$1.00$1.20$0.70$1.00$3.05$3.00
207Reflectorized pavement marking type II (W) (arrow) (666-7186)EACH14$87.88$250.00$24.00$280.00$20.00$75.75$75.00
208Reflectorized pavement marking type II (W) (uturn arrow) (666-7189)EACH3$90.00$500.00$84.00$120.00$70.00$151.50$150.00
209Reflectorized pavement marking type II (W) (word) (666-7194)EACH16$108.75$20.00$24.00$320.00$20.00$101.00$100.00
210Reflectorized pavement marking type II (W) 36" (yld tri) (666-7201)EACH12$30.00$50.00$60.00$60.00$50.00$40.40$40.00
211Reflectorized pavement marking type II (Y) 6" (solid) (666-7213)LF48,493$0.22$0.25$0.30$0.20$0.25$0.30$0.30
212Reflectorized pavement marking type II (Y) 24" (solid) (666-7217)LF2,303$11.00$2.00$2.40$0.70$2.00$3.05$3.00
213Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF9,489$0.80$0.57$0.68$0.69$0.55$1.00$1.00
214Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF48,609$0.75$0.52$0.63$0.59$0.50$0.80$0.80
215Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF48,487$0.50$0.52$0.63$0.59$0.50$0.80$0.80
216Reflectorized pavement marker type I-C (672-7002)EACH160$5.00$4.00$4.80$3.85$4.00$6.05$6.00
217Reflectorized pavement marker type II-A-A (672-7004)EACH24$5.05$4.00$4.80$3.85$4.00$6.05$6.00
218Reflectorized pavement marker type II-C-R (672-7006)EACH1,250$4.65$4.00$4.80$3.65$4.00$6.05$6.00
219Eliminating existing PM & markers (4") (677-7001)LF2,946$0.30$0.80$0.96$0.50$0.80$1.00$1.00
220Eliminating existing PM & markers (6") (677-7002)LF18,185$0.60$0.72$0.50$0.60$1.00$1.00
221Eliminating existing PM & markers (8") (677-7004)LF2,536$0.70$0.65$0.78$0.55$0.65$1.00$1.00
222Eliminating existing PM & markers (12") (677-7006)LF165$1.50$1.75$2.08$1.50$1.75$2.55$2.50
223Pavement surface preparation for marking (6") (678-7002)LF106,595$0.08$0.13$0.18$0.05$0.15$0.02$0.02
224Pavement surface preparation for marking (8") (678-7004)LF13,552$0.16$0.20$0.24$0.07$0.20$0.05$0.05
225Pavement surface preparation for marking (12") (678-7006)LF5,387$0.75$0.35$0.42$0.10$0.35$0.10$0.10
226Pavement surface preparation for marking (24") (678-7008)LF3,437$0.95$0.45$0.54$0.20$0.45$0.50$0.50
227Pavement surface preparation for marking (arrow) (678-7009)EACH18$28.00$9.00$10.75$10.00$9.00$50.50$50.00
228Pavement surface preparation for marking (word) (678-7016)EACH16$25.22$9.00$10.75$10.00$9.00$50.50$50.00
229Pavement surface preparation for marking (RPM) (678-7033)EACH1,434$1.86$0.48$0.57$0.25$0.50$1.00$1.00
230Install highway traffic signal (isolated) (680-7002)EACH1$53,700$47,725$60,300$30,000$48,760$56,119$47,725
231Vehicle signal section (12")LED(green) (682-7001)EACH7$515.23$430.00$490.00$683.00$385.00$443.10$430.00
232Vehicle signal section (12")LED(green arrow) (682-7002)EACH9$546.78$430.00$490.00$683.00$393.00$452.30$430.00
233Vehicle signal section (12")LED(yel) (682-7003)EACH11$530.24$430.00$490.00$683.00$385.00$443.10$430.00
234Vehicle signal section (12")LED(yel arrow) (682-7004)EACH8$500.62$430.00$490.00$683.00$393.00$452.30$430.00
235Vehicle signal section (12")LED(red) (682-7005)EACH11$531.28$430.00$490.00$683.00$385.00$443.10$430.00
236Vehicle signal section (12")LED(red arrow) (682-7006)EACH8$485.43$430.00$490.00$683.00$393.00$452.30$430.00
237Pedestrian signal section (LED)(countdown) (682-7018)EACH2$1,100.00$1,200.00$1,140.00$1,260.00$889.00$1,023.15$1,200.00
238Backplate W/ref border(3 sec)(vent)aluminum (682-7042)EACH13$278.00$365.00$296.00$263.00$210.00$241.70$365.00
239Backplate W/ref border(5 sec)(vent)aluminum (682-7044)EACH3$250.00$400.00$375.00$294.00$265.00$305.00$400.00
240Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031)LF538$3.60$3.25$2.50$3.15$3.30$3.80$3.25
241Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033)LF325$3.85$4.25$3.65$3.15$3.55$4.10$4.25
242Traffic signal CBL (type A)(14 AWG)(16 conductor) (684-7042)LF2,246$5.70$6.25$7.05$7.35$4.00$4.60$6.50
243Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079)LF275$3.40$4.65$2.50$3.15$2.00$2.30$4.65
244Ins traffic signal PL AM(S)1 arm(32')ilsn (686-7034)EACH2$14,000$14,125$16,500$17,535$11,270$12,970$14,125
245Ins traffic signal PL AM(S)1 arm(32')lum&ilsn (686-7036)EACH1$12,523$16,500$17,750$19,425$13,550$15,595$16,500
246Ins traffic signal PL AM(S)1 arm(44')lum&ilsn (686-7048)EACH2$22,300$19,000$22,750$22,260$17,150$19,738$19,000
247Ins traffic signal PL AM(S)1 arm(55')lum&ilsn (686-7060)EACH1$33,450$42,000$36,410$43,050$27,680$31,852$42,000
248Pedestrian pole assembly (687-7001)EACH2$5,307.91$2,500.00$2,845.00$5,670.00$3,550.00$4,085.80$2,500.00
249Pedestrian detect push button (APS) (688-7001)EACH2$1,524.65$1,150.00$1,250.00$1,105.00$911.00$1,048.50$1,150.00
250Pedestrian detector controller unit (688-7003)EACH2$4,085.36$4,100.00$4,210.00$5,250.00$4,160.00$4,782.10$4,100.00
251Full - width mowing (730-7019)CYC6$7,500.00$2,000.00$6,956.00$6,500.00$8,290.00$20,000$5,000.00
252Bbu system (external battery cabinet) (6007-7001)EACH1$8,100.00$8,750.00$9,380.00$9,450.00$9,260.00$10,658$8,750.00
253RVDS (presence detection only) (6008-7001)EACH6$8,500.00$7,500.00$10,240$13,650$7,180.00$8,263.65$7,500.00
254RVDS (presence and advance detection) (6008-7003)EACH3$12,500$9,460.00$10,240$19,950$10,300$11,855$9,460.00
255Decorative medallion W/ LED backlight (6155-7001)EACH2$52,019$1,000.00$5,231.00$66,750$9,550.00$10,991$2,500.00
TxDOT contract A00020688: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of March 4, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy