Harper Brothers Construction LLC: TxDOT bid record
Harper Brothers Construction LLC submitted 110 bids on Texas DOT contracts in the data, from 07 FEB 2020 to 04 NOV 2026, and was the low bidder on 14 of them (13%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $375,449,716
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 19 | 2 | 11% |
| 2021 | 24 | 1 | 4% |
| 2022 | 16 | 2 | 13% |
| 2023 | 13 | 4 | 31% |
| 2024 | 17 | 3 | 18% |
| 2025 | 6 | 0 | 0% |
| 2026 | 15 | 2 | 13% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Houston District | 41 | 5 | 12% |
| San Antonio District | 30 | 4 | 13% |
| Dallas District | 13 | 2 | 15% |
| Yoakum District | 6 | 0 | 0% |
| Austin District | 6 | 1 | 17% |
| Fort Worth District | 6 | 2 | 33% |
| Beaumont District | 4 | 0 | 0% |
| Bryan District | 2 | 0 | 0% |
| Lufkin District | 1 | 0 | 0% |
| Tyler District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trench excavation protection | 402-7001 | LF | 74 | 40 (54%) | $2.00 | $10.00 |
| Construction exits (install) (type 1) | 506-7020 | SY | 85 | 30 (35%) | $30.00 | $30.00 |
| Construction exits (remove) | 506-7024 | SY | 90 | 29 (32%) | $10.00 | $10.00 |
| Install small roadside sign support and assembly type 10BWG(1)SA(P) | 644-7001 | EACH | 89 | 29 (33%) | $595.00 | $710.00 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 72 | 28 (39%) | $5.00 | $5.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 101 | 26 (26%) | $1.00 | $1.00 |
| Temporary sediment control fence (install) | 506-7039 | LF | 101 | 25 (25%) | $3.29 | $4.00 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 80 | 25 (31%) | $1.00 | $1.40 |
| Eliminating existing pavement marking & markers (4") | 677-6001 | LF | 55 | 25 (45%) | $0.44 | $0.60 |
| Pavement surface preparation for marking (6") | 678-7002 | LF | 53 | 25 (47%) | $0.06 | $0.18 |
| Guardrail end treatment (remove) | 544-7003 | EACH | 52 | 25 (48%) | $239.89 | $275.00 |
| Reflectorized pavement marking type I (W)24"(solid)(100MIL) | 666-7036 | LF | 46 | 25 (54%) | $6.70 | $8.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| James Construction Group, LLC | 36 | 23 of 36 |
| Ser Construction Partners, LLC | 28 | 18 of 28 |
| Isi Contracting, Inc. | 25 | 14 of 25 |
| Ragle Construction, Inc. | 25 | 8 of 25 |
| Webber, LLC | 21 | 10 of 21 |
| Jordan Foster Construction, LLC | 19 | 8 of 19 |
| Zachry Construction Corporation | 19 | 10 of 19 |
| Angel Brothers Holdings Corp. | 18 | 10 of 18 |
| Hunter Industries, LTD. | 17 | 10 of 17 |
| Main Lane Industries LTD. | 17 | 14 of 17 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00129572 | Dallas District | Construct New Roadway Lanes, SH 5 (NORTH OF COLLIN COUNTY OUTER LOOP to FM 455 w/TRANSITION N OF HACKBERRY DR) | 4 of 4 | $40,441,503 | +13% |
| 03 NOV 2026 | A00184974 | Austin District | Highway Improvement, IH 35 (US 290 E to Martin Luther King Jr Blvd) | 4 of 6 | $477,550,553 | +16% |
| 06 AUG 2026 | A00191470 | Houston District | Construct Frontage Roads, SH 99 (Fry Road to Westheimer Parkway) | 5 of 9 | $34,996,279 | +7.0% |
| 05 AUG 2026 | A00191471 | Houston District | Construct Frontage Roads, SH 99 (Westheimer Parkway to Cinco Ranch Blvd) | 2 of 8 | $26,217,697 | +1.0% |
| 05 AUG 2026 | A00007222 | Fort Worth District | Reconstruct Existing Roadway, US 81 (NORTH OF HARMON ROAD to NORTH OF IH 35W) | 2 of 11 | $66,949,776 | +1.0% |
| 05 AUG 2026 | A00068611 | Houston District | Widen Road - Add Lanes, UA 90 (FM 359 to W of SH 99) | 4 of 7 | $50,296,882 | +3.0% |
| 01 JUL 2026 | A00190685 | Houston District | Construct Frontage Roads, SH 99 (Cinco Ranch Blvd to Bay Hill Blvd) | 1 of 11 | $19,505,918 | Low, 1.0% under the second |
| 01 JUL 2026 | A00008199 | Fort Worth District | Interchange Improvement, IH 35W (Bethesda Road to Asher Road) | 4 of 6 | $69,798,708 | +8.0% |
| 02 JUN 2026 | A00216194 | Houston District | Construct Pedestrian Infrastructure, BROADWAY ST (At UPRR, Galveston Rd, and Harding St to .) | 5 of 7 | $6,857,738 | +58% |
| 08 APR 2026 | A00133118 | Houston District | Widen Road - Add Lanes, SH 99 (IH 10(W) to West Road) | 9 of 10 | $143,791,907 | +20% |
| 04 MAR 2026 | A00020688 | Dallas District | Interchange Improvement, US 67 (AT LAKE RIDGE PKWY to .) | 3 of 9 | $66,338,016 | +4.0% |
| 04 MAR 2026 | A00132533 | Dallas District | Bridge Replacement, SS 348 (LP 12 NB to IH 35E NB DIRECT CONNECTORS) | 5 of 9 | $18,525,942 | +12% |
| 04 FEB 2026 | A00205634 | Dallas District | Construct New Road, SS 394 (IH 35E to FM 877) | 7 of 11 | $23,570,223 | +24% |
| 04 FEB 2026 | A00045441 | Dallas District | Widen Road - Add Lanes, FM 549 (SH 205 to SH 276) | 5 of 12 | $33,779,105 | +13% |
| 04 FEB 2026 | A00121975 | Houston District | Highway Improvement, US 290 (US 290/Greenhouse Rd, From Mound Rd to Skinner Rd at US 290) | 1 of 10 | $74,036,475 | Low, 6.0% under the second |
| 05 SEP 2025 | A00063821 | Tyler District | Bridge Replacement, IH 20 (.955 MI W OF SABINE RIVER to .842 MI E OF SABINE RIVER) | 7 of 10 | $44,068,021 | +19% |
| 05 SEP 2025 | A00133456 | Dallas District | Bridge Replacement, FM 636 (At Willow Creek to .) | 8 of 8 | $12,490,379 | +29% |
| 07 AUG 2025 | A00135447 | Austin District | Bridge Replacement, US 77 (0.10 MILES SOUTH OF N. JAEGER STREET to NORTH OF INDEPENDENCE STREET) | 8 of 10 | $17,553,803 | +33% |
| 04 JUN 2025 | A00060771 | Austin District | Highway Improvement, SH 71 (TRAVIS/BASTROP COUNTY LINE to 0.65 MI. EAST OF TUCKER HILL LANE) | 4 of 9 | $63,659,154 | +9.0% |
| 02 MAY 2025 | A00045158 | Dallas District | Rehabilitate Existing Roadway, FM 547 (US 380 to FM 6) | 8 of 8 | $24,363,227 | +48% |
| 01 MAY 2025 | A00212134 | Austin District | Embankment Stabilization, SL 360 (RM 2222 to Courtyard Dr.) | 2 of 4 | $7,395,332 | +18% |
| 03 DEC 2024 | A00138908 | Dallas District | Construct New Roadway Lanes, SH 5 (Stewart Road to Eldorado Parkway) | 4 of 4 | $197,084,000 | +25% |
| 06 NOV 2024 | A00064418 | San Antonio District | Bridge Replacement, IH 35 (At Chacon Creek to .) | 5 of 7 | $14,979,000 | +17% |
| 02 AUG 2024 | 08243202 | Houston District | IH 45 Drainage improvements from S OF SHENANDOAH PARK DR to SH 242 | 3 of 4 | $50,847,716 | +19% |
| 10 JUL 2024 | 07243207 | Dallas District | FM 455 Bridge replacement from AT EAST FORK TRINITY RIVER RELIEF W to AT EAST FORK TRINITY RIVER EAST | 1 of 6 | $9,581,000 | Low, 3.0% under the second |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.