Ser Construction Partners, LLC submitted 51 bids on Texas DOT contracts in the data, from 07 MAY 2020 to 03 SEP 2026, and was the low bidder on 16 of them (31%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $533,352,984
- Latest bid
- 03 SEP 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 10 | 4 | 40% |
| 2021 | 5 | 0 | 0% |
| 2022 | 9 | 2 | 22% |
| 2023 | 5 | 1 | 20% |
| 2024 | 9 | 5 | 56% |
| 2025 | 5 | 2 | 40% |
| 2026 | 8 | 2 | 25% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Houston District | 44 | 14 | 32% |
| Laredo District | 2 | 1 | 50% |
| Beaumont District | 2 | 1 | 50% |
| Austin District | 2 | 0 | 0% |
| Yoakum District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sediment control fence (install) | 506-7039 | LF | 44 | 22 (50%) | $2.23 | $4.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 44 | 18 (41%) | $0.60 | $1.00 |
| Construction exits (remove) | 506-7024 | SY | 37 | 17 (46%) | $5.80 | $10.00 |
| Removing structure (inlet) | 496-7002 | EACH | 31 | 16 (52%) | $517.10 | $1,000.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 51 | 12 (24%) | $6,105.40 | $5,000.00 |
| Removing structure (set) | 496-7004 | EACH | 28 | 11 (39%) | $456.05 | $505.00 |
| Vegetative watering | 168-7001 | MG | 33 | 10 (30%) | $21.60 | $29.97 |
| Eliminating existing pavement marking & markers (8") | 677-6003 | LF | 18 | 10 (56%) | $0.50 | $1.00 |
| Preparing row | 100-7002 | STA | 44 | 9 (20%) | $4,350.00 | $2,750.00 |
| Pavement surface preparation for marking (6") | 678-7002 | LF | 34 | 9 (26%) | $0.10 | $0.18 |
| Riprap (mow strip)(4 in) | 432-7013 | CY | 32 | 9 (28%) | $531.25 | $643.00 |
| Construction exits (install) (type 1) | 506-7020 | SY | 32 | 9 (28%) | $29.40 | $30.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| James Construction Group, LLC | 32 | 17 of 32 |
| Harper Brothers Construction LLC | 28 | 10 of 28 |
| Isi Contracting, Inc. | 26 | 10 of 26 |
| R Construction Civil, LLC | 20 | 9 of 20 |
| Main Lane Industries LTD. | 16 | 6 of 16 |
| Ragle Construction, Inc. | 15 | 2 of 15 |
| MC2 Civil, LLC | 12 | 6 of 12 |
| Webber, LLC | 11 | 3 of 11 |
| MBN Enterprises LLC | 10 | 2 of 10 |
| Zachry Construction Corporation | 10 | 2 of 10 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 03 SEP 2026 | A00191741 | Houston District | Construct Pedestrian Infrastructure, FM 3005 (SS 342 (61st Street) to Cove View Blvd) | 6 of 7 | $2,933,723 | +41% |
| 02 SEP 2026 | A00192185 | Houston District | Bridge Replacement, FM 2004 (At Highland Bayou to .) | 6 of 11 | $3,807,901 | +19% |
| 06 AUG 2026 | A00191470 | Houston District | Construct Frontage Roads, SH 99 (Fry Road to Westheimer Parkway) | 4 of 9 | $34,596,007 | +6.0% |
| 05 AUG 2026 | A00191471 | Houston District | Construct Frontage Roads, SH 99 (Westheimer Parkway to Cinco Ranch Blvd) | 4 of 8 | $26,945,564 | +4.0% |
| 05 AUG 2026 | A00068611 | Houston District | Widen Road - Add Lanes, UA 90 (FM 359 to W of SH 99) | 1 of 7 | $48,831,301 | Low, 0.0% under the second |
| 01 JUL 2026 | A00190685 | Houston District | Construct Frontage Roads, SH 99 (Cinco Ranch Blvd to Bay Hill Blvd) | 6 of 11 | $20,995,725 | +8.0% |
| 08 APR 2026 | A00133118 | Houston District | Widen Road - Add Lanes, SH 99 (IH 10(W) to West Road) | 1 of 10 | $119,970,903 | Low, 3.0% under the second |
| 04 FEB 2026 | A00121975 | Houston District | Highway Improvement, US 290 (US 290/Greenhouse Rd, From Mound Rd to Skinner Rd at US 290) | 4 of 10 | $79,533,035 | +7.0% |
| 08 OCT 2025 | A00186223 | Houston District | Construct Frontage Roads, SH 99 (Longenbaugh Road to FM 529) | 1 of 10 | $6,547,219 | Low, 20% under the second |
| 07 AUG 2025 | A00205904 | Houston District | Bicycle And Pedestrian Improvements, SH 3 (FM 1765 to FM 519) | 1 of 10 | $1,983,177 | Low, 4.0% under the second |
| 01 JUL 2025 | A00193596 | Houston District | Hazard Elimination & Safety, US 90 (East of SL 8 to Liberty County Line) | 5 of 8 | $3,699,433 | +28% |
| 04 JUN 2025 | A00060771 | Austin District | Highway Improvement, SH 71 (TRAVIS/BASTROP COUNTY LINE to 0.65 MI. EAST OF TUCKER HILL LANE) | 3 of 9 | $61,539,627 | +5.0% |
| 04 APR 2025 | A00131128 | Houston District | Install/Upgrade Drainage Structure(S), FM 1097 (At Atkins Creek to .) | 2 of 8 | $3,650,762 | +4.0% |
| 03 DEC 2024 | A00140315 | Houston District | Intersection Improvement, IH 610 (Market St. to 0.25 Mi W. of Mercury Dr.) | 3 of 11 | $4,298,538 | +9.0% |
| 06 NOV 2024 | A00132358 | Beaumont District | Construct Bridge, US 90 (AT UP RAILROAD to .) | 1 of 7 | $27,266,206 | Low, 4.0% under the second |
| 06 JUN 2024 | 06243208 | Houston District | FM 1314 Rehabilitate existing roadway from 0.1 MILE SOUTH OF SH 242 to 1.08 MILE SOUTH OF SH 242 | 2 of 6 | $31,898,180 | +2.0% |
| 06 JUN 2024 | 06243231 | Houston District | FM 519 Construct pedestrian infrastructure from IH 45 to SH 3 | 1 of 6 | $3,290,125 | Low, 4.0% under the second |
| 05 JUN 2024 | 06243002 | Houston District | US 90 Construct bridge from AT GREENS BAYOU | 1 of 7 | $66,988,357 | Low, 2.0% under the second |
| 05 APR 2024 | 04243210 | Houston District | SH 242 Install/upgrade drainage structure(s) from NEEDHAM DRIVE to IH 69 | 4 of 11 | $9,850,678 | +20% |
| 05 MAR 2024 | 03243002 | Houston District | IH 69 Highway improvement from AT BRAZOS RIVER | 1 of 4 | $53,190,823 | Low, 0.0% under the second |
| 02 FEB 2024 | 02243202 | Houston District | SH 99 Widen road - add lanes from SH 249 to KUYKENDAHL ROAD | 6 of 8 | $59,973,846 | +8.0% |
| 04 JAN 2024 | 01243005 | Houston District | FM 518 Hike and/or bike from JAMES ROSS ELEMENTARY SCHOOL to PALOMINO ROAD | 1 of 10 | $15,447,120 | Low, 1.0% under the second |
| 03 AUG 2023 | 08233207 | Houston District | FM 1960 Interchange improvement from SH 249 to CUTTEN RD | 1 of 4 | $27,298,741 | Low, 3.0% under the second |
| 27 JUN 2023 | 06233403 | Houston District | SH 288 Install/upgrade drainage structure(s) from IH 69 to NORTH MACGREGOR WAY | 4 of 5 | $58,323,170 | +73% |
| 27 JUN 2023 | 06233404 | Houston District | BU 90-U Reconstruct and widen from 4 to 6 lanes from IH 610, NE to EAST OF MESA RD (OLD FM 527) | 3 of 5 | $68,458,561 | +10% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.