TxDOT letting results, August 3, 2023
68 contracts let by Texas DOT on August 3, 2023, $910,116,358 in low bids, a median of 3 bidders per contract. On the 68 with an engineer's estimate, the low bid came in under it 26 times; median low bid +8.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 68
- Low bids, total
- $910,116,358
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 08233201 | US 75 Widen road - add lanes from US 82 to NORTH LOY LAKE ROAD | Paris District | 4 | Sema Construction, Inc. | $196,535,605 | $213,083,743 | +8.0% | +14% | TxDOT |
| 08233202 | FM 723 Widen road - add lanes from SOUTH OF BEADLE LANE to NORTH OF BRAZOS RIVER | Houston District | 5 | Zachry Construction Corporation | $144,686,970 | $144,999,706 | 0.0% | +15% | TxDOT |
| 08233204 | SH 72 Widen road - add lanes from FM 237 to US 87 | Yoakum District | 1 | Hunter Industries, LTD. | $74,026,222 | +17% | TxDOT | ||
| 08233274 | US 69 Interchange improvement (new or update) from 0.5 MI N OF FM 2493-W to 0.5 MI S OF FM 2493-E | Tyler District | 3 | East Texas Bridge, Inc. | $66,711,336 | $72,658,635 | +9.0% | +1.0% | TxDOT |
| 08233203 | US 75 Highway improvement from IH 635 to SH 121 | Dallas District | 2 | Webber, LLC | $58,488,663 | $68,792,859 | +18% | +8.0% | TxDOT |
| 08233206 | IH 20 Bridge replacement from AT FM 859, 1.2 MI W OF SH 19 to STR# 102340049502038 | Tyler District | 2 | Indus Road & Bridge, Inc. | $39,144,960 | $41,184,739 | +5.0% | +23% | TxDOT |
| 08233205 | FM 730 Reconstruct existing roadway from 3.479 MI N OF SH 114 to SH 114 IN BOYD | Fort Worth District | 4 | Sema Construction, Inc. | $38,322,905 | $42,439,694 | +11% | -9.0% | TxDOT |
| 08233207 | FM 1960 Interchange improvement from SH 249 to CUTTEN RD | Houston District | 4 | Ser Construction Partners, LLC | $27,298,741 | $28,151,000 | +3.0% | +10% | TxDOT |
| 08233209 | IH 27 Bridge replacement from 0.5 MILES SOUTH OF YUCCA LANE to 0.5 MILES NORTH OF YUCCA LANE | Lubbock District | 2 | Webber, LLC | $24,330,102 | $25,351,373 | +4.0% | +44% | TxDOT |
| 08233221 | IH 45 Fdcr, flex pav rep, & bridge scour rep from IH 30 to SOUTH OF MALLOY BRIDGE RD | Dallas District | 2 | Ragle Construction, Inc. | $16,982,607 | $18,215,534 | +7.0% | +99% | TxDOT |
| 08233214 | SH 19 Rehabilitate existing roadway from SH 11 to RAINS COUNTY LINE | Paris District | 2 | Highway 19 Construction LLC | $16,786,586 | $17,052,201 | +2.0% | +8.0% | TxDOT |
| 08233210 | FM 510 Rehabilitate existing roadway from FM 3462 to FM 1847 | Pharr District | 4 | Foremost Paving, Inc. | $15,675,731 | $17,112,918 | +9.0% | +11% | TxDOT |
| 08233213 | FM 1547 Bridge replacement from @ SALT FORK OF RED RIVER | Childress District | 5 | Hodges and Son Construction Company, Inc. | $10,872,131 | $10,931,550 | +1.0% | +17% | TxDOT |
| 08233215 | FM 315 Hazard elimination & safety from FM 3079 to FM 3506 | Tyler District | 2 | Big Creek Construction, LTD. | $9,287,827 | $9,814,464 | +6.0% | -18% | TxDOT |
| 08233211 | IH 10 Construct rest area from 0.8 MI. EAST OF GONZALES C/L to 1.4 MI. EAST OF GONZALES C/L | Yoakum District | 4 | Hunter Industries, LTD. | $9,282,087 | $9,962,549 | +7.0% | -9.0% | TxDOT |
| 08233212 | FM 937 Preventive maintenance from LIMESTONE COUNTY LINE to SH 7 | Bryan District | 3 | Big Creek Construction, LTD. | $9,087,363 | $9,956,345 | +10% | -24% | TxDOT |
| 08233216 | FM 1082 Construct new road from WEST OF CHEYENNE CREEK ROAD to EAST OF DAM | Abilene District | 2 | Gilvin-Terrill, LTD. | $8,867,739 | $12,756,116 | +44% | +10% | TxDOT |
| 08233222 | FM 1702 Widen road - add shoulders from SH 36, SOUTH to HAMILTON C/L | Brownwood District | 3 | Jay Mills Contracting, Incorporated | $8,679,973 | $9,768,320 | +13% | +11% | TxDOT |
| 08233223 | FM 365 Add shoulders and overlay from FM 1406, EAST to IH 10 | Beaumont District | 2 | Cornerstone Paving and Construction, L.L.C. | $7,997,541 | $8,722,125 | +9.0% | +5.0% | TxDOT |
| 08233217 | SH 97 Rehabilitate existing roadway from BI-35C to FM 624 INTERSECTION | Laredo District | 3 | Hunter Industries, LTD. | $7,207,235 | $7,320,914 | +2.0% | +5.0% | TxDOT |
| 08233218 | FM 2185 Preventive maintenance from SH 54 to 4.8 MI E OF FM 2809 | El Paso District | 3 | Dan Williams Company | $6,981,729 | $8,985,238 | +29% | +8.0% | TxDOT |
| 08233234 | FM 1487 Rehabilitate existing roadway from FM 910 to FM 412 | Paris District | 5 | A. K. Gillis & Sons, LLC | $6,756,222 | $7,254,471 | +7.0% | -18% | TxDOT |
| 08233219 | RM 620 Install advanced traffic management system from RM 620 to SILVERMINE DRIVE | Austin District | 3 | Sice, Inc. | $6,473,033 | $6,503,637 | 0.0% | -4.0% | TxDOT |
| 08233226 | IH 40 Transportation non-roadway from WB MM 107 to WB MM 107.6 | Amarillo District | 4 | J. Lee Milligan, Inc. | $6,318,690 | $6,548,087 | +4.0% | +11% | TxDOT |
| 08233231 | FM 149 Widen road - add shoulders from SH 90 to 0.2 MI E OF FM 2562 | Bryan District | 4 | Larry Young Paving, Inc. | $5,572,269 | $5,602,733 | +1.0% | +13% | TxDOT |
| 08233228 | FM 975 Rehabilitate existing road from SH 21 to UPRR OVERPASS | Bryan District | 3 | Texas Materials Group, Inc. | $5,263,760 | $5,372,634 | +2.0% | +11% | TxDOT |
| 08233236 | VA Hazard elimination & safety from VARIOUS | Houston District | 1 | Ragle Construction, Inc. | $4,864,313 | +131% | TxDOT | ||
| 08233220 | CS Bridge replacement from E. LONG AVENUE OVER LITTLE FOSSIL C to IN FORT WORTH | Fort Worth District | 4 | Harper Brothers Construction LLC | $4,807,165 | $5,400,084 | +12% | -26% | TxDOT |
| 08233227 | FM 2931 Highway improvement from NORTH OF SL 288 to MILAM RD | Dallas District | 4 | Jagoe-Public Company | $4,665,614 | $5,234,411 | +12% | +1.0% | TxDOT |
| 08233225 | SH 19 Profile markings from 0.4 MI N OF SH 30 to IH 45 | Bryan District | 5 | D. I. J. Construction, Inc. | $4,204,818 | $4,390,057 | +4.0% | -15% | TxDOT |
| 08233240 | SH 66 Highway improvement from AT BEN PAYNE RD | Dallas District | 2 | FNH Construction, LLC | $4,078,127 | $4,590,950 | +13% | +50% | TxDOT |
| 08233229 | IH 45 Hazard elimination & safety from OVERTON RD to IH 20 | Dallas District | 4 | Ed Bell Construction Company | $3,534,464 | $3,702,811 | +5.0% | +13% | TxDOT |
| 08233248 | FM 726 Replace bridge and approaches from AT COPELAND CREEK | Atlanta District | 4 | THK Construction LLC | $3,496,301 | $4,041,776 | +16% | +44% | TxDOT |
| 08233242 | BU 67-A Rehabilitate existing roadway from US 67 NORTH to US 67 SOUTH | El Paso District | 1 | Dan Williams Company | $3,445,494 | +20% | TxDOT | ||
| 08233230 | SH 71 Construct pedestrian infrastructure from FM 1301 to ALABAMA RD | Yoakum District | 3 | Ti-Zack Concrete, LLC | $3,057,575 | $3,377,740 | +10% | -9.0% | TxDOT |
| 08233233 | VA Construct pedestrian infrastructure from OLD JACKSONVILLE HIGHWAY to HOUSTON ST | Tyler District | 5 | THK Construction LLC | $2,988,319 | $3,092,346 | +3.0% | -4.0% | TxDOT |
| 08233250 | SH 78 Hazard elimination & safety from US 82 to OKLAHOMA STATE LINE | Paris District | 2 | Highway 19 Construction LLC | $2,680,198 | $2,732,685 | +2.0% | +9.0% | TxDOT |
| 08233273 | CS Traffic signal improvements from VARIOUS LOCATIONS to IN DALLAS AND DENTON COUNTY | Dallas District | 1 | Durable Specialties, Inc. | $2,578,292 | +10% | TxDOT | ||
| 08233238 | FM 743 Traffic signal improvements from ON FM743 FROM US 181 to .815 MI E OF FM 623 | Corpus Christi District | 4 | CK Newberry, LLC | $2,555,559 | $2,689,548 | +5.0% | -2.0% | TxDOT |
| 08233237 | SH 26 Resurface roadway from SH 183 to IH 820 | Fort Worth District | 5 | Austin Bridge & Road Services, LP | $2,429,785 | $2,535,373 | +4.0% | -4.0% | TxDOT |
| 08233243 | VA Maintenance & operations project from VARIOUS to VARIOUS | Waco District | 8 | D. I. J. Construction, Inc. | $2,409,826 | $2,571,923 | +7.0% | -33% | TxDOT |
| 08233252 | SH 183 Intersection improvement from 0.1 MI S OF GREEN OAKS RD to 0.1 MI N OF GREEN OAKS RD | Fort Worth District | 3 | FNH Construction, LLC | $2,255,934 | $2,422,938 | +7.0% | +35% | TxDOT |
| 08233239 | US 81 Hazard elimination & safety from WAGONSELLER RD to 0.25 MI S OF SS 511 | Wichita Falls District | 4 | HJC Farms, Inc. | $2,243,729 | $2,415,381 | +8.0% | -13% | TxDOT |
| 08233241 | IH 10 Upgrade dynamic message sign boards from 0.1 MI EAST OF CALDWELL C/L | Yoakum District | 2 | Traf-Tex, Inc. | $2,182,974 | $2,318,868 | +6.0% | 0.0% | TxDOT |
| 08233232 | VA Hazard elimination & safety from REFERENCE MARKER 1 ON IH35 to LA SALLE/FRIO COUNTY LINE ON IH35 | Laredo District | 2 | Highway Barricades and Services, LLC | $2,156,160 | $2,792,840 | +30% | -32% | TxDOT |
| 08233208 | FM 1375 Surfacing/roadway restoration from FM 149 to WALKER C/L | Houston District | 7 | Texas Materials Group, Inc. | $2,012,093 | $2,023,696 | +1.0% | -25% | TxDOT |
| 08233246 | CS Hazard elimination & safety from HILLCROFT AVENUE AT DASHWOOD DRIVE | Houston District | 1 | Main Lane Industries LTD. | $1,979,986 | +31% | TxDOT | ||
| 08233244 | US 287 Hazard elimination & safety from FM 664 to BUS 287 S | Dallas District | 2 | Ed Bell Construction Company | $1,859,514 | $2,298,453 | +24% | -3.0% | TxDOT |
| 08233269 | VA Installation of its from DISTRICTWIDE | Laredo District | 2 | The Levy Company, Inc. | $1,775,792 | $2,062,845 | +16% | +48% | TxDOT |
| 08233249 | CR Bridge replacement from AT SWINDLER CREEK to STR#201760AA0237001 | Beaumont District | 7 | Rayford'S Truck & Tractor | $1,497,066 | $1,538,544 | +3.0% | -7.0% | TxDOT |
| 08233262 | VA Signal improvements,leds & gps clocks from ON SYSTEM SIGNALS to IN ARLINGTON CITY LIMITS | Fort Worth District | 3 | Yunex LLC | $1,495,754 | $1,799,203 | +20% | +15% | TxDOT |
| 08233254 | US 281 Bridge maintenance from 200 FT N. OR LITTLE BLANCO RIVER BR to 200 FT S. OF LITTLE BLANCO RIVER BR | Austin District | 4 | Allen Keller Company | $1,151,581 | $1,152,117 | 0.0% | +23% | TxDOT |
| 08233257 | US 80 Install median barrier from EAST OF FM 354 to WEST OF FM 2728 | Dallas District | 7 | Built Right Construction of Oklahoma, LLC | $1,089,056 | $1,148,881 | +5.0% | +24% | TxDOT |
| 08233255 | US 67 Hazard elimination & safety from WARD RD to JOHNSON COUNTY LINE | Dallas District | 5 | Scout 5 Construction LLC | $1,035,719 | $1,048,483 | +1.0% | -7.0% | TxDOT |
| 08233258 | CR Bridge replacement from ON GELLERMAN LN @ PEDERNALES RIVER to STR# 14-087-0-AA01-37-001 | Austin District | 6 | Delgado'S Contractors, LLC | $1,025,365 | $1,073,859 | +5.0% | +21% | TxDOT |
| 08233272 | SS 260 Interchange improvement from US 83 to SH 359 | Laredo District | 2 | Triple H Field Services, LLC | $916,544 | $986,701 | +8.0% | -17% | TxDOT |
| 08233251 | CS Rehabilitate bridge and approaches from W CENTRAL AVE @ NOLAN CRK to (MAP #1 BELTON) | Waco District | 3 | SCR Civil Construction, LLC | $881,150 | $967,857 | +10% | +25% | TxDOT |
| 08233270 | CR Bridge replacement from NEW HOPE ROAD AT WARD BRANCH | Fort Worth District | 3 | Pmco Construction LLC | $724,492 | $955,666 | +32% | +5.0% | TxDOT |
| 08233261 | IH 20 Resurface roadway from IH 20 LFR to SH 155 INTERSECTION | Tyler District | 2 | FNH Construction, LLC | $693,237 | $715,997 | +3.0% | +20% | TxDOT |
| 08233268 | CS Bridge replacement from ON CR 10 (WEST WHARTON CREEK ST) to AT TIDEWELL CREEK | Bryan District | 4 | Fuqua Construction Co., Inc. | $663,959 | $681,917 | +3.0% | +38% | TxDOT |
| 08233260 | VA Hazard elimination & safety from VARIOUS LOCATIONS IN to CHEROKEE CO | Tyler District | 3 | Garret Shields Infrastructure | $532,753 | $548,000 | +3.0% | -17% | TxDOT |
| 08233263 | CS Intersection improvement from BELMONT ST | Odessa District | 3 | Ti-Zack Concrete, LLC | $496,353 | $640,326 | +29% | 0.0% | TxDOT |
| 08233256 | IH 69E Hazard elimination & safety from FM 732 to .05 MI S OF BU 77 | Pharr District | 3 | Pavement Markings Inc. | $489,585 | $498,489 | +2.0% | -36% | TxDOT |
| 08233253 | FM 731 Landscape development from S HAMPTON RD to DEER CREEK DR | Fort Worth District | 2 | Central North Construction, LLC | $434,716 | $481,864 | +11% | -10% | TxDOT |
| 08233264 | CS Hazard elimination & safety from GARRETT RD. to FM 1479 | Pharr District | 3 | Austin Traffic Signal Construction Co., Inc. | $368,889 | $425,536 | +15% | -15% | TxDOT |
| 08233245 | CS Traffic signal improvements from ON GOLLIHAR RD FROM MUSTANG TRAIL to MEADOWBROOK DRIVE | Corpus Christi District | 1 | Highway Barricades and Services, LLC | $302,655 | -1.0% | TxDOT | ||
| 08233267 | SL 281 Hazard elimination & safety from 0.2 MI W OF FM 2208 to HARRISON CL | Tyler District | 8 | THK Construction LLC | $225,255 | $234,150 | +4.0% | -9.0% | TxDOT |
| 08233266 | CS Hazard elimination & safety from 0.1 MILES WEST OF MINNESOTA RD. to 0.1 MILES EAST OF MINNESOTA RD. | Pharr District | 3 | The Levy Company, Inc. | $192,173 | $211,351 | +10% | +7.0% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.