Gilvin-Terrill, LTD. submitted 177 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 03 NOV 2026, and was the low bidder on 17 of them (10%). When it was not low, its total sat a median +26% above the low bid.

Owner
Texas DOT
Low bid volume
$116,133,516
Latest bid
03 NOV 2026
Data through
19 NOV 2026
177Bids
17Low bids
10Win rate, percent
+26%Median gap to the low bid when not low, 160 bids

By year

YearBidsLow bidsWin rate
20202514%
202132619%
20223027%
20232329%
202422314%
20252300%
202622314%
Gilvin-Terrill, LTD., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Amarillo District67913%
Abilene District3838%
Childress District3813%
Lubbock District20315%
Wichita Falls District400%
San Angelo District400%
Odessa District3133%
Brownwood District100%
Maintenance Division District100%
Ochiltree100%
Gilvin-Terrill, LTD., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Guardrail end treatment (install)544-7001EACH12566 (53%)$3,300.00$3,245.00
Reflectorized pavement marker type II-A-A672-7004EACH9358 (62%)$5.00$5.00
Remove SM RD SN sup&AM644-7073EACH9853 (54%)$100.00$110.00
Biodegradable erosion control logs (remove)506-7046LF12349 (40%)$2.00$1.40
Remove metal beam guard fence542-7001LF10947 (43%)$3.00$3.00
Install small roadside sign support and assembly type 10BWG(1)SA(T)644-7004EACH8442 (50%)$900.00$825.00
Install small roadside sign support and assembly type 10BWG(1)SA(P)644-7001EACH8342 (51%)$771.00$710.00
Guardrail end treatment (remove)544-7003EACH8837 (42%)$300.00$275.00
Metal beam guard fence trans (thrie-beam)540-7005EACH8637 (43%)$2,387.50$2,140.00
Metal W-beam guard fence (steel post)540-7002LF9536 (38%)$35.00$33.00
Eliminating existing pavement marking & markers (4")677-6001LF5133 (65%)$1.00$0.60
Reflectorized pavement marker type I-C672-7002EACH4930 (61%)$5.00$5.00
Gilvin-Terrill, LTD., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Gilvin-Terrill, LTD., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
03 NOV 2026A00211505Amarillo DistrictBridge Maintenance, IH 27 (IH 27 NB/WESTERN AVE BRG to .)7 of 8$7,098,974+22%
03 SEP 2026A00184830Amarillo DistrictBridge Replacement, IH 40 (IH 40 AT SH 207 to .)1 of 7$9,899,343Low, 12% under the second
03 SEP 2026A00207389Childress DistrictBridge Replacement, FM 1547 (@ Buck Creek to .)6 of 7$4,428,835+47%
06 AUG 2026A00193006Amarillo DistrictSurfacing/Roadway Restoration, US 87 (AMARILLO CREEK to 11 TH STREET IN AMARILLO)3 of 3$33,654,544+12%
05 AUG 2026A00128458Amarillo DistrictConstruct New Road, SL 335 (NORTH OF FM 2186 to NORTH OF ARDEN ROAD)4 of 5$51,748,003+23%
02 JUL 2026A00208465Odessa DistrictHighway Improvement, IH 20 (SH 137 to BI20-F EAST)1 of 4$8,792,883Low, 2.0% under the second
03 JUN 2026A00076951Childress DistrictHighway Improvement, SH 70 (8 Miles North of US 82, South to US 82)6 of 6$4,970,395+24%
02 JUN 2026A00193225Amarillo DistrictHazard Elimination & Safety, US 287 (FM 294 to 3.6 MI EAST OF FM 294)2 of 6$7,485,977+8.0%
02 JUN 2026A00200068Childress DistrictBridge Replacement, SH 70 (@ Quitaque River to .)6 of 9$4,553,977+34%
13 MAY 2026A00214602Abilene DistrictDRAINAGE IMPROVEMENT AND/OR REPAIRS, FM2320 (SH208 to FM1228)7 of 7$1,085,523+90%
07 MAY 2026A00183655Lubbock DistrictRoadway Rehabilitation/Reconstruction With No Added Capacity, FM 179 (South of US 62 to LP 88 (FM 1585))6 of 6$14,162,929+47%
06 MAY 2026A00211596Childress DistrictBridge Maintenance, US 83 (US 83 SB @ Salt Fork of Red River to .)9 of 13$3,165,947+32%
08 APR 2026A00211509Amarillo DistrictBridge Maintenance, SH 70 (SH 70/N FORK RED RIVER BRG to .)1 of 8$3,039,519Low, 4.0% under the second
08 APR 2026A00187842Odessa DistrictHighway Improvement, FM 1208 (FM1212 to MIDLAND C/L)5 of 5$13,757,545+47%
08 APR 2026A00206920Abilene DistrictPreventive Maintenance, IH 20 (WESTBROOK to COLORADO CITY EAST CITY LIMITS)5 of 5$20,547,197+61%
07 APR 2026A00209966Amarillo DistrictPreventive Maintenance, RM 1061 (COULTER ST to BI 40-D)3 of 6$7,872,239+5.0%
04 MAR 2026A00188550Amarillo DistrictRehabilitate Bridge, N HUGHES (N HUGHES ST @ BNSF RR to .)6 of 6$7,622,832+69%
04 MAR 2026A00193354Abilene DistrictWiden Road - Add Lanes And Shoulders, FM 89 (1.219 MILES SOUTH OF ELM CREEK to ELM CREEK)4 of 5$7,739,939+23%
05 FEB 2026A00077453Childress DistrictHighway Improvement, SH 6 (882' South of US 70, South to Knox C/L)6 of 7$8,147,499+20%
04 FEB 2026A00188551Amarillo DistrictBridge Replacement, IRWIN RD (IRWIN RD @ EAST AMARILLO CREEK to .)6 of 7$3,077,686+54%
07 JAN 2026A00208588Childress DistrictWiden Road - Add Shoulders, FM 104 (US 70, North to 10 Miles)8 of 8$8,114,354+29%
06 JAN 2026A00190019Childress DistrictHighway Improvement, US 83 (FM 1038, South to King C/L)9 of 9$58,245,487+25%
03 DEC 2025A00045322Abilene DistrictBridge Replacement, FM 604 (AT JIM NED CREEK to .)7 of 9$4,466,115+66%
02 DEC 2025A00214744Lubbock DistrictROADWAY WIDENING, FM0145 (Intersection of FM145 & SH194 (Hart) to Castro/Swisher County Line)3 of 5$2,962,524+30%
02 DEC 2025A00213139Lubbock DistrictConstruct Bridge, US 87 (0.75 MI NORTH OF FM 41 to 0.75 MI SOUTH OF FM 41)2 of 2$26,829,530+3.0%
Gilvin-Terrill, LTD.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy