Gilvin-Terrill, LTD.: TxDOT bid record
Gilvin-Terrill, LTD. submitted 177 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 03 NOV 2026, and was the low bidder on 17 of them (10%). When it was not low, its total sat a median +26% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $116,133,516
- Latest bid
- 03 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 25 | 1 | 4% |
| 2021 | 32 | 6 | 19% |
| 2022 | 30 | 2 | 7% |
| 2023 | 23 | 2 | 9% |
| 2024 | 22 | 3 | 14% |
| 2025 | 23 | 0 | 0% |
| 2026 | 22 | 3 | 14% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Amarillo District | 67 | 9 | 13% |
| Abilene District | 38 | 3 | 8% |
| Childress District | 38 | 1 | 3% |
| Lubbock District | 20 | 3 | 15% |
| Wichita Falls District | 4 | 0 | 0% |
| San Angelo District | 4 | 0 | 0% |
| Odessa District | 3 | 1 | 33% |
| Brownwood District | 1 | 0 | 0% |
| Maintenance Division District | 1 | 0 | 0% |
| Ochiltree | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Guardrail end treatment (install) | 544-7001 | EACH | 125 | 66 (53%) | $3,300.00 | $3,245.00 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 93 | 58 (62%) | $5.00 | $5.00 |
| Remove SM RD SN sup&AM | 644-7073 | EACH | 98 | 53 (54%) | $100.00 | $110.00 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 123 | 49 (40%) | $2.00 | $1.40 |
| Remove metal beam guard fence | 542-7001 | LF | 109 | 47 (43%) | $3.00 | $3.00 |
| Install small roadside sign support and assembly type 10BWG(1)SA(T) | 644-7004 | EACH | 84 | 42 (50%) | $900.00 | $825.00 |
| Install small roadside sign support and assembly type 10BWG(1)SA(P) | 644-7001 | EACH | 83 | 42 (51%) | $771.00 | $710.00 |
| Guardrail end treatment (remove) | 544-7003 | EACH | 88 | 37 (42%) | $300.00 | $275.00 |
| Metal beam guard fence trans (thrie-beam) | 540-7005 | EACH | 86 | 37 (43%) | $2,387.50 | $2,140.00 |
| Metal W-beam guard fence (steel post) | 540-7002 | LF | 95 | 36 (38%) | $35.00 | $33.00 |
| Eliminating existing pavement marking & markers (4") | 677-6001 | LF | 51 | 33 (65%) | $1.00 | $0.60 |
| Reflectorized pavement marker type I-C | 672-7002 | EACH | 49 | 30 (61%) | $5.00 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| J. Lee Milligan, Inc. | 72 | 42 of 72 |
| RK Hall, LLC | 51 | 35 of 51 |
| Duininck, Inc. | 47 | 39 of 47 |
| Earth Builders, L.P. | 41 | 28 of 41 |
| A. L. Helmcamp, Inc. | 40 | 32 of 40 |
| L A Fuller & Sons Construction, LTD. | 26 | 22 of 26 |
| Coppell Construction Co., Inc. | 24 | 21 of 24 |
| Hodges and Son Construction Company, Inc. | 22 | 15 of 22 |
| J. H. Strain & Sons, Inc. | 18 | 17 of 18 |
| Kiewit Infrastructure South Co. | 18 | 10 of 18 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 03 NOV 2026 | A00211505 | Amarillo District | Bridge Maintenance, IH 27 (IH 27 NB/WESTERN AVE BRG to .) | 7 of 8 | $7,098,974 | +22% |
| 03 SEP 2026 | A00184830 | Amarillo District | Bridge Replacement, IH 40 (IH 40 AT SH 207 to .) | 1 of 7 | $9,899,343 | Low, 12% under the second |
| 03 SEP 2026 | A00207389 | Childress District | Bridge Replacement, FM 1547 (@ Buck Creek to .) | 6 of 7 | $4,428,835 | +47% |
| 06 AUG 2026 | A00193006 | Amarillo District | Surfacing/Roadway Restoration, US 87 (AMARILLO CREEK to 11 TH STREET IN AMARILLO) | 3 of 3 | $33,654,544 | +12% |
| 05 AUG 2026 | A00128458 | Amarillo District | Construct New Road, SL 335 (NORTH OF FM 2186 to NORTH OF ARDEN ROAD) | 4 of 5 | $51,748,003 | +23% |
| 02 JUL 2026 | A00208465 | Odessa District | Highway Improvement, IH 20 (SH 137 to BI20-F EAST) | 1 of 4 | $8,792,883 | Low, 2.0% under the second |
| 03 JUN 2026 | A00076951 | Childress District | Highway Improvement, SH 70 (8 Miles North of US 82, South to US 82) | 6 of 6 | $4,970,395 | +24% |
| 02 JUN 2026 | A00193225 | Amarillo District | Hazard Elimination & Safety, US 287 (FM 294 to 3.6 MI EAST OF FM 294) | 2 of 6 | $7,485,977 | +8.0% |
| 02 JUN 2026 | A00200068 | Childress District | Bridge Replacement, SH 70 (@ Quitaque River to .) | 6 of 9 | $4,553,977 | +34% |
| 13 MAY 2026 | A00214602 | Abilene District | DRAINAGE IMPROVEMENT AND/OR REPAIRS, FM2320 (SH208 to FM1228) | 7 of 7 | $1,085,523 | +90% |
| 07 MAY 2026 | A00183655 | Lubbock District | Roadway Rehabilitation/Reconstruction With No Added Capacity, FM 179 (South of US 62 to LP 88 (FM 1585)) | 6 of 6 | $14,162,929 | +47% |
| 06 MAY 2026 | A00211596 | Childress District | Bridge Maintenance, US 83 (US 83 SB @ Salt Fork of Red River to .) | 9 of 13 | $3,165,947 | +32% |
| 08 APR 2026 | A00211509 | Amarillo District | Bridge Maintenance, SH 70 (SH 70/N FORK RED RIVER BRG to .) | 1 of 8 | $3,039,519 | Low, 4.0% under the second |
| 08 APR 2026 | A00187842 | Odessa District | Highway Improvement, FM 1208 (FM1212 to MIDLAND C/L) | 5 of 5 | $13,757,545 | +47% |
| 08 APR 2026 | A00206920 | Abilene District | Preventive Maintenance, IH 20 (WESTBROOK to COLORADO CITY EAST CITY LIMITS) | 5 of 5 | $20,547,197 | +61% |
| 07 APR 2026 | A00209966 | Amarillo District | Preventive Maintenance, RM 1061 (COULTER ST to BI 40-D) | 3 of 6 | $7,872,239 | +5.0% |
| 04 MAR 2026 | A00188550 | Amarillo District | Rehabilitate Bridge, N HUGHES (N HUGHES ST @ BNSF RR to .) | 6 of 6 | $7,622,832 | +69% |
| 04 MAR 2026 | A00193354 | Abilene District | Widen Road - Add Lanes And Shoulders, FM 89 (1.219 MILES SOUTH OF ELM CREEK to ELM CREEK) | 4 of 5 | $7,739,939 | +23% |
| 05 FEB 2026 | A00077453 | Childress District | Highway Improvement, SH 6 (882' South of US 70, South to Knox C/L) | 6 of 7 | $8,147,499 | +20% |
| 04 FEB 2026 | A00188551 | Amarillo District | Bridge Replacement, IRWIN RD (IRWIN RD @ EAST AMARILLO CREEK to .) | 6 of 7 | $3,077,686 | +54% |
| 07 JAN 2026 | A00208588 | Childress District | Widen Road - Add Shoulders, FM 104 (US 70, North to 10 Miles) | 8 of 8 | $8,114,354 | +29% |
| 06 JAN 2026 | A00190019 | Childress District | Highway Improvement, US 83 (FM 1038, South to King C/L) | 9 of 9 | $58,245,487 | +25% |
| 03 DEC 2025 | A00045322 | Abilene District | Bridge Replacement, FM 604 (AT JIM NED CREEK to .) | 7 of 9 | $4,466,115 | +66% |
| 02 DEC 2025 | A00214744 | Lubbock District | ROADWAY WIDENING, FM0145 (Intersection of FM145 & SH194 (Hart) to Castro/Swisher County Line) | 3 of 5 | $2,962,524 | +30% |
| 02 DEC 2025 | A00213139 | Lubbock District | Construct Bridge, US 87 (0.75 MI NORTH OF FM 41 to 0.75 MI SOUTH OF FM 41) | 2 of 2 | $26,829,530 | +3.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.