TxDOT contract A00128458 bid tabulation

Construct New Road, SL 335 (NORTH OF FM 2186 to NORTH OF ARDEN ROAD). Let by Texas DOT on August 5, 2026, Randall, Amarillo District. 5 bids received; low bid $42,220,204 by J. Lee Milligan, Inc., -16% against the engineer's estimate of $50,287,232.

Owner
Texas DOT
Letting
05 AUG 2026
Pay items
225
Data through
19 NOV 2026

4 of the 5 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1J. Lee Milligan, Inc.$42,220,204Low-16%
2L A Fuller & Sons Construction, LTD.$44,477,635+5.0%-12%
3Ragle Construction, Inc.$48,810,035+16%-3.0%
4Gilvin-Terrill, LTD.$51,748,003+23%+3.0%
TxDOT contract A00128458: bids by rank

Engineer's estimate: $50,287,232.

Bid tabulation

LinePay itemUnitQuantityEstimate1. J. Lee Milligan, Inc.2. L A Fuller & Sons Construction, LTD.3. Ragle Construction, Inc.4. Gilvin-Terrill, LTD.
1Removing concrete (mowstrip) (104-7003)SY57$25.00$25.00$23.55$20.00$20.00
2Removing concrete (medians) (104-7008)SY588$45.00$20.00$33.35$13.00$20.00
3Removing concrete (driveways) (104-7011)SY211$20.00$28.00$36.65$20.00$20.00
4Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY824$25.00$17.00$45.15$15.00$20.00
5Removing concrete (curb & gutter) (104-7017)LF3,681$15.00$4.00$14.25$7.50$10.00
6Remove (8") TRT/untrt base & asphalt pavement (105-7028)SY326$10.00$14.00$26.60$8.50$25.00
7Remove (19") TRT/untrt base & asphalt pavement (105-7039)SY1,811$19.00$16.00$21.75$12.00$25.00
8Excavation (roadway) (110-7001)CY3,888$30.00$8.00$15.70$65.00$47.00
9Embankment (final)(DC)(type B) (132-7004)CY230,572$12.00$25.00$25.00$15.00$47.00
10Embankment (final)(DC)(type C1) (132-7008)CY3,940$40.00$14.00$25.15$17.50$47.00
11Drill seed (temporary_warm_cool) (164-7047)ACRE13.81$1,000.00$650.00$922.90$800.00$750.00
12Hydro mulch seed (permanent_rural_clay) (164-7050)ACRE13.81$2,600.00$2,850.00$2,588.25$2,800.00$3,000.00
13Vegetative watering (168-7001)TGL1,128$55.00$18.00$36.55$35.00$30.00
14FL BS(compacted in place)(type A,B or D GR4)(12") (247-7134)SY3,482$41.00$41.00$40.30$35.00$30.00
15Cement (275-7001)TON589$310.00$255.00$279.85$220.00$250.00
16Cement TRT (existing material)(8") (275-7003)SY54,520$5.50$3.65$3.65$3.75$10.00
17Prime coat (multi option) (310-7015)GAL833$6.00$5.45$8.40$7.50$6.00
18D-GR HMA type-B PG64-22 (341-7001)TON393$140.00$150.00$278.90$210.00$160.00
19D-GR HMA type-B PG64-28 (341-7005)TON0$110.00$0.00$0.00$0.00$0.00
20SP mixes SP-D sac-A PG70-28 (344-7057)TON7,241$170.00$145.00$185.00$190.00$200.00
21Plane & text asphalt concrete pavement(2") (354-7019)SY61,087$3.00$3.65$2.25$1.90$3.00
22Planing asphalt concrete pavement(4") (354-7053)SY107$6.00$30.00$24.45$12.25$15.50
23Concrete pavement (CRCP) (13") (360-7007)SY0$173.00$0.00$0.00$0.00$0.00
24Concrete pavement(transition slab) (13") (360-7036)SY0$300.00$0.00$0.00$0.00$0.00
25Cut & restoring pavement (400-7006)SY31$200.00$115.00$233.10$175.00$135.00
26Cem stabil BKFL (400-7010)CY600$175.00$180.00$216.25$150.00$200.00
27Flowable backfill (401-7001)CY76$280.00$215.00$210.55$290.00$200.00
28Trench excavation protection (402-7001)LF4,552$20.00$25.00$2.50$2.50$6.00
29Drilled shaft (18 in) (416-7002)LF360$150.00$100.00$100.70$60.00$80.00
30Drilled shaft (36 in) (416-7006)LF1,488$375.00$176.00$253.85$175.00$195.00
31Drilled shaft (48 in) (416-7008)LF908$440.00$375.00$435.35$300.00$320.00
32Drilled shaft (sign mounts) (48 in) (416-7032)LF82$300.00$680.00$575.00$500.00$500.00
33Drilled shaft (high mast pole) (60 in) (416-7037)LF840$1,000.00$850.00$690.00$600.00$600.00
34Drilled shaft (roadway illumination pole) (30 in) (416-7040)LF20$330.00$325.00$258.75$225.00$225.00
35Drilled shaft (traffic signal pole) (24 in) (416-7042)LF60$250.00$260.00$184.00$160.00$160.00
36Drilled shaft (traffic signal pole) (36 in) (416-7044)LF30$500.00$460.00$299.00$260.00$260.00
37Drilled shaft (traffic signal pole) (48 in) (416-7046)LF88$750.00$625.00$575.00$500.00$500.00
38Class C concrete (abutment) (420-7012)CY142.80$1,550.00$1,800.00$1,857.75$1,200.00$1,500.00
39Class C concrete (cap) (420-7022)CY122.80$1,900.00$1,425.00$2,014.00$1,150.00$1,500.00
40Class C concrete (column) (420-7038)CY129.40$1,900.00$1,150.00$1,759.85$1,250.00$1,500.00
41Class C concrete (rail foundation) (420-7052)CY33$800.00$650.00$1,087.10$505.00$650.00
42Reinforced concrete slab (422-7001)SF41,796$42.50$25.50$30.00$26.00$30.00
43Approach slab (422-7013)CY170$925.00$860.00$972.80$700.00$1,500.00
44Retaining wall (MSE) (423-7001)SF96,735$112.00$52.00$58.75$120.00$60.00
45Prestressed concrete girder (TX54) (425-7005)LF3,486$335.00$310.00$400.00$270.00$290.00
46Prestressed concrete girder (TX62) (425-7006)LF1,911$350.00$340.00$425.00$305.00$310.00
47Riprap (concrete)(4 in) (432-7001)CY175.20$750.00$710.00$730.65$600.00$600.00
48Riprap (concrete)(5 in) (432-7002)CY495$800.00$600.00$508.15$540.00$550.00
49Riprap (concrete)(CL A) (432-7004)CY0$780.99$0.00$0.00$0.00$0.00
50Riprap (concrete)(flume) (432-7012)CY40$750.00$950.00$678.30$580.00$800.00
51Riprap (mow strip)(5 in) (432-7014)CY227$750.00$710.00$537.60$540.00$600.00
52Rail (type SSTR) (450-7024)LF7,969$103.00$105.00$75.00$65.00$100.00
53Rail (handrail)(type F) (450-7063)LF453$150.00$170.00$147.10$145.00$150.00
54Sealed expansion joint (5 in) (SEJ - M) (454-7005)LF212$280.00$350.00$407.90$220.00$235.00
55RC pipe (CL III)(18 in) (464-7003)LF593$130.00$145.00$78.10$80.00$220.00
56RC pipe (CL III)(24 in) (464-7005)LF7,379$170.00$175.00$97.15$100.00$150.00
57RC pipe (CL III)(30 in) (464-7007)LF62$400.00$395.00$159.85$140.00$190.00
58RC pipe (CL V)(24 in) (464-7034)LF314$270.00$260.00$320.55$190.00$175.00
59Junction box(complete)(PJB)(3FTX3FT) (465-7005)EACH38$8,000.00$4,250.00$7,928.85$4,350.00$6,000.00
60Inlet (complete)(PSL)(RC)(3FTX3FT) (465-7070)EACH20$9,000.00$5,450.00$9,577.90$4,575.00$7,000.00
61Inlet (complete)(PSL)(RC)(4FTX4FT) (465-7071)EACH3$12,000$7,950.00$11,530$6,175.00$8,500.00
62Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126)EACH25$10,000$6,525.00$10,737$5,400.00$8,000.00
63Inlet (complete)(PSL)(FG)(4FTX4FT-4FTX4FT) (465-7128)EACH2$12,000$6,800.00$11,299$6,000.00$8,000.00
64Inlet(complete)(PSL)(SFG)(4FTX4FT-4FTX4FT) (465-7147)EACH5$12,000$8,300.00$11,909$6,500.00$9,000.00
65Inlet(complete)(PSL)(SFG)(3FTX5FT-3FTX5FT) (465-7148)EACH3$12,000$8,600.00$11,421$6,125.00$8,500.00
66Inlet (complete) (rwi) (type II) (465-7349)EACH34$7,500.00$15,250$10,056$8,500.00$8,500.00
67Inlet (complete)(rwi)(type I) (465-7353)EACH2$7,000.00$14,000$9,219.05$8,500.00$7,500.00
68Adjusting inlets (479-7002)EACH9$5,000.00$3,800.00$20,388$1,150.00$12,000
69Removing structure (inlet) (496-7002)EACH4$1,100.00$2,750.00$3,012.55$625.00$3,200.00
70Removing structure (set) (496-7004)EACH1$1,100.00$1,430.00$1,617.85$625.00$3,200.00
71Removing structure (pipe) (496-7007)LF42$50.00$70.00$77.05$25.00$20.00
72Mobilization (500-7001)LS1$4,500,000$4,644,800$4,432,453$4,900,000$5,105,000
73Barricades, signs and traffic handling (502-7001)MO26$41,500$35,000$7,897.25$113,615$100,000
74Portable changeable message sign (503-7002)EACH4$14,000$25,000$25,000$60,000$18,500
75TMA (stationary) (505-7001)DAY380$200.00$425.00$428.70$300.00$525.00
76TMA (mobile operation) (505-7002)HR96$100.00$87.00$94.05$125.00$95.00
77Temporary sediment control fence (install) (506-7039)LF1,000$5.00$10.00$9.40$5.00$5.00
78Temporary sediment control fence (remove) (506-7041)LF1,000$2.00$5.00$2.85$1.25$1.00
79Biodegradable erosion control logs (install) (8") (506-7043)LF3,592$5.50$7.00$11.80$6.00$6.00
80Biodegradable erosion control logs (remove) (506-7046)LF3,592$2.00$3.00$1.60$1.50$2.00
81Constructing detours (508-7001)SY678$200.00$76.00$155.15$135.00$60.00
82Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001)LF3,805$145.00$128.25$135.00$200.00$70.00
83Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009)LF680$110.00$55.00$130.60$150.00$110.00
84Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010)LF20$110.00$55.00$141.15$150.00$110.00
85Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033)LF1,360$13.00$27.00$20.85$7.50$15.00
86Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034)LF40$13.00$27.00$20.65$12.50$15.00
87Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057)LF680$25.00$30.00$21.25$18.00$15.00
88Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058)LF20$25.00$30.00$34.40$60.00$15.00
89Permanent CTB (tran SSCB to SSTR) (mod) (514-7038)LF50$700.00$220.00$291.50$240.00$200.00
90Colored textured concrete (5") (527-7002)SY1,581$100.00$80.60$91.50$95.00$80.00
91Concrete curb (mono) (type I) (529-7006)LF0$20.00$0.00$0.00$0.00$0.00
92Concrete curb & gutter (type I) (529-7008)LF901$44.00$31.50$37.75$31.50$30.00
93Concrete curb & gutter (type II) (529-7009)LF3,140$44.00$29.30$36.70$29.50$30.00
94Concrete curb (type C1) (529-7016)LF710$125.00$63.00$19.45$70.00$60.00
95Concrete curb (type F1) (529-7017)LF145$165.00$108.50$137.45$140.00$100.00
96Driveways (concrete) (530-7006)SY220$150.00$216.50$191.40$110.00$130.00
97Driveways (ACP) (530-7010)SY333$85.00$95.00$77.40$95.00$110.00
98Concrete sidewalks (4") (531-7001)SY14,765$93.00$81.50$123.00$48.00$75.00
99Concrete sidewalks (6") (531-7003)SY562$108.00$102.00$143.70$70.00$90.00
100Curb ramps (type 1) (531-7015)SY193$250.00$160.00$172.00$160.00$145.00
101Curb ramps (type 7) (531-7020)SY175$250.00$160.00$347.00$150.00$145.00
102Curb ramps (type 21) (531-7023)SY16$250.00$175.00$376.60$205.00$170.00
103Curb ramps (type 22) (531-7024)SY52$250.00$175.00$381.00$185.00$170.00
104Metal W-beam guard fence (steel post) (540-7002)LF450$40.00$40.00$42.55$32.75$37.00
105Metal beam guard fence trans (thrie-beam) (540-7005)EACH1$3,000.00$3,200.00$3,487.75$2,275.00$3,025.00
106Guardrail end treatment (install) (544-7001)EACH3$3,200.00$4,200.00$4,715.00$3,550.00$4,100.00
107Guardrail end treatment (remove) (544-7003)EACH1$500.00$325.00$575.00$200.00$500.00
108Crash cushion attenuator (install)(L)(N)(TL3) (545-7006)EACH2$25,000$38,000$34,385$25,000$37,400
109Pipe underdrains (type 6) (6") (556-7006)LF5,875$20.00$16.75$34.00$27.50$16.00
110In RD IL (U/P) (type 1) (150W EQ) LED (610-7014)EACH8$1,000.00$2,120.00$1,725.00$1,500.00$1,500.00
111In RD IL (U/P) (type 2) (150W EQ) LED (610-7016)EACH4$2,500.00$2,650.00$1,725.00$1,500.00$1,500.00
112In RD IL (type ST) 40T-8 (250W EQ) LED (610-7164)EACH2$6,000.00$5,900.00$6,900.00$6,000.00$6,000.00
113HI MST IL pole (150 FT)(100 MPH) (613-7006)EACH20$65,000$68,200$74,750$65,000$65,000
114LED HI MST IL asm(6 fixt) (type A)SHLD (614-7009)EACH20$37,000$46,150$57,500$50,000$50,000
115Conduit (PVC) (schedule 80) (2") (618-7054)LF13,980$16.00$16.30$13.80$12.00$12.00
116Conduit (PVC) (schedule 80) (2") (bore) (618-7055)LF2,465$30.00$23.90$19.55$17.00$17.00
117Conduit (PVC) (schedule 80) (3") (618-7060)LF80$25.00$32.55$19.55$17.00$17.00
118Conduit (PVC) (schedule 80) (3") (bore) (618-7061)LF465$50.00$41.25$19.55$17.00$17.00
119Conduit (PVC) (schedule 80) (4") (618-7064)LF10$50.00$36.90$24.15$21.00$21.00
120Conduit (PVC) (schedule 80) (4") (bore) (618-7065)LF265$80.00$54.25$25.30$22.00$22.00
121Conduit (RM) (1") (618-7072)LF360$40.00$35.80$26.45$23.00$23.00
122Install ground box (W/secure lid) (624-7014)EACH64$2,400.00$2,335.00$2,760.00$2,400.00$2,400.00
123Elc SRV type A 240/480 060(NS)SS(E)SP(O) (628-7048)EACH5$12,000$9,225.00$8,970.00$7,800.00$7,800.00
124Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148)EACH1$10,000$8,140.00$8,050.00$7,000.00$7,000.00
125Aluminum signs (type A) (636-7001)SF156.50$40.00$44.00$46.00$40.00$40.00
126Aluminum signs (type O) (636-7003)SF231$40.00$54.25$36.80$32.00$32.00
127Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH10$920.00$1,165.00$897.00$780.00$700.00
128Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH12$1,000.00$1,355.00$1,095.95$953.00$750.00
129Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012)EACH15$1,150.00$1,355.00$1,082.15$941.00$760.00
130Install small roadside sign support and assembly type 10BWG(2)SB(P) (644-7019)EACH2$1,300.00$2,200.00$1,857.25$1,615.00$1,350.00
131Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025)EACH4$1,000.00$1,450.00$1,242.00$1,080.00$960.00
132Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026)EACH1$1,200.00$1,550.00$1,151.15$1,001.00$980.00
133Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH1$1,200.00$1,520.00$1,151.15$1,001.00$960.00
134Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH1$1,400.00$2,000.00$1,813.55$1,577.00$1,400.00
135Install small roadside sign support and assembly TYS80(1)SB(P) (644-7037)EACH2$1,200.00$1,475.00$1,267.30$1,102.00$955.00
136Install small roadside sign support and assembly TYS80(1)SB(T) (644-7040)EACH1$1,400.00$1,725.00$1,518.00$1,320.00$970.00
137Install small roadside sign support and assembly TYS80(1)SB(U) (644-7042)EACH1$1,600.00$2,035.00$1,889.45$1,643.00$1,350.00
138In bridge MNT clearance sign assembly(type N) (644-7061)EACH4$3,000.00$3,475.00$2,070.00$1,800.00$1,800.00
139Install small roadside sign support and assembly (rail mount) (644-7063)EACH2$4,000.00$8,250.00$7,225.45$6,283.00$2,000.00
140Relocate SM RD SN sup&AM type 10BWG (644-7065)EACH11$920.00$795.00$784.30$682.00$450.00
141Relocate SM RD SN sup&AM type S80 (644-7067)EACH5$920.00$895.00$910.80$792.00$550.00
142Remove SM RD SN sup&AM (644-7073)EACH33$150.00$165.00$164.05$118.00$100.00
143Install overhead sign support(25 FT cant)(circ tube) (650-7024)EACH2$90,000$76,000$83,375$115,500$72,500
144Install delineator assembly (D-SW)SZ 1(WFLX)GF2 (658-7001)EACH7$30.00$43.50$48.30$45.00$75.00
145Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH64$20.00$60.00$48.30$45.00$42.00
146Install delineator assembly (D-SY)SZ 1(yflx)GF2 (658-7021)EACH3$37.00$43.50$48.30$45.00$55.00
147Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031)EACH19$20.00$60.00$48.30$45.00$42.00
148Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032)EACH39$20.00$60.00$48.30$45.00$42.00
149Install object marker assembly (OM-2Z)(WFLX)GND (658-7058)EACH41$150.00$165.00$135.70$90.00$100.00
150Install object marker assembly (OM-4)(TWT)wap (658-7073)EACH18$150.00$485.00$562.35$489.00$300.00
151Remove delin & object marker assms (658-7078)EACH38$25.00$40.00$131.25$50.00$15.00
152Install OM SM RD sign (1-OM-PW)Y (658-7317)EACH45$2.00$33.00$14.95$13.00$12.00
153Install OM SM RD sign (1-OM-PW)R (658-7318)EACH7$2.00$33.00$14.95$13.00$14.00
154Install OM SM RD sign (2-OM-PW)Y (658-7319)EACH2$2.00$38.00$20.70$18.00$13.00
155Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF145$0.50$2.20$2.30$0.35$2.00
156Work zone pavement marking non-removing (W)6"(DOT) (662-7006)LF91$1.00$2.20$2.30$0.40$2.00
157Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF2,861$1.00$2.20$2.30$0.56$2.00
158Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF786$6.00$13.55$14.38$4.00$12.50
159Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH12$150.00$245.00$258.75$60.00$225.00
160Work zone pavement marking non-removing (W)(double arrow) (662-7019)EACH2$150.00$352.50$373.75$90.00$325.00
161Work zone pavement marking non-removing (W)(uturn arrow) (662-7027)EACH4$250.00$434.00$460.00$90.00$400.00
162Work zone pavement marking non-removing(W)(word) (662-7030)EACH16$200.00$434.00$460.00$70.00$400.00
163Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF940$0.40$2.20$2.30$0.35$2.00
164Work zone pavement marking non-removing (Y)12"(solid) (662-7040)LF404$4.00$9.25$9.78$2.00$8.50
165Reflectorized pavement marking type I (W)8"(DOT)(090MIL) (666-7017)LF471$1.30$2.20$2.30$1.00$2.00
166Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023)LF5,160$1.00$2.20$2.30$0.87$2.00
167Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029)LF1,449$3.00$5.45$5.75$2.90$5.00
168Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035)LF786$13.00$10.85$11.50$6.80$10.00
169Reflectorized pavement marking type I (W)(arrow)(090MIL) (666-7041)EACH16$300.00$245.00$258.75$155.00$225.00
170Reflectorized pavement marking type I(W)(double arrow)(090MIL) (666-7044)EACH2$375.00$355.00$373.75$200.00$325.00
171Reflectorized pavement marking type I (W)(word)(090MIL) (666-7065)EACH16$300.00$355.00$373.75$175.00$325.00
172Reflectorized pavement marking type I (Y)12"(solid)(090MIL) (666-7116)LF490$3.00$6.00$6.33$3.00$5.50
173Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407)LF3,529$0.70$1.65$1.73$0.69$1.50
174Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422)LF5,463$0.65$1.65$1.73$0.69$1.50
175Reflectorized pavement marking type I (W)12"(DOT)(100MIL) (666-7424)LF470$3.00$4.35$4.60$3.00$4.00
176Reflectorized pavement marker type II-C-R (672-7006)EACH177$8.00$7.05$7.48$4.00$6.50
177Eliminating existing PM & markers (4") (677-7001)LF967$0.50$1.90$2.01$1.00$1.75
178Eliminating existing PM & markers (8") (677-7004)LF405$0.75$2.20$2.30$1.00$2.00
179Eliminating existing PM & markers (12") (677-7006)LF186$1.00$3.25$3.45$1.79$3.00
180Eliminating existing PM & markers (24") (677-7008)LF573$4.00$5.45$5.75$2.90$5.00
181Eliminating existing PM & markers (arrow) (677-7009)EACH6$40.00$136.00$143.75$59.00$125.00
182Eliminating existing PM & markers (word) (677-7015)EACH7$40.00$165.00$172.50$59.00$150.00
183Eliminating existing PM & markers (18")(yld tri) (677-7023)EACH6$1.00$35.00$143.75$19.00$30.00
184Install highway traffic signal (isolated) (680-7002)EACH1$40,000$40,000$51,750$45,000$45,000
185Vehicle signal section (12")LED(green) (682-7001)EACH12$345.00$420.00$402.50$350.00$350.00
186Vehicle signal section (12")LED(green arrow) (682-7002)EACH4$345.00$420.00$402.50$350.00$350.00
187Vehicle signal section (12")LED(yel) (682-7003)EACH12$345.00$420.00$402.50$350.00$350.00
188Vehicle signal section (12")LED(yel arrow) (682-7004)EACH6$345.00$420.00$402.50$350.00$350.00
189Vehicle signal section (12")LED(red) (682-7005)EACH12$345.00$420.00$402.50$350.00$350.00
190Vehicle signal section (12")LED(red arrow) (682-7006)EACH4$345.00$420.00$402.50$350.00$350.00
191Pedestrian signal section (LED)(countdown) (682-7018)EACH12$1,150.00$1,060.00$690.00$600.00$600.00
192Backplate W/ref border(3 sec)(vent)aluminum (682-7042)EACH14$280.00$245.00$287.50$250.00$250.00
193Backplate W/ref border(4 sec)(vent)aluminum (682-7043)EACH2$280.00$300.00$299.00$260.00$260.00
194Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031)LF3,397$4.00$5.45$3.45$3.00$3.00
195Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033)LF840$4.00$7.60$4.83$4.20$4.20
196Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046)LF1,765$8.00$8.95$9.20$8.00$8.00
197Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079)LF3,840$3.00$3.25$3.45$3.00$3.00
198Removing RDSD FLSH BCN AM (solar PWRD) (685-7006)EACH10$1,200.00$815.00$1,035.00$900.00$900.00
199Ins traffic signal PL AM(S)1 arm(40')lum (686-7043)EACH2$27,500$18,700$18,975$16,500$16,500
200Ins traffic signal PL AM(S)1 arm(60')lum (686-7063)EACH4$49,000$43,000$43,700$38,000$38,000
201Pedestrian pole assembly (687-7001)EACH10$6,700.00$3,525.00$1,610.00$1,400.00$1,400.00
202Pedestrian detect push button (APS) (688-7001)EACH12$1,000.00$1,115.00$977.50$850.00$850.00
203Pedestrian detector controller unit (688-7003)EACH1$6,500.00$5,075.00$4,140.00$3,600.00$3,600.00
204Full - width mowing (730-7019)CYC4$500.00$5,575.00$6,562.40$3,600.00$1,000.00
205Anti-graffiti coating (permnent-type II) (740-7005)SF77,686$1.10$1.40$1.65$1.27$1.27
206Underseal course (3006-7001)GAL8,522$7.00$7.25$8.55$5.50$9.00
207Subsurface util locate (non-paved area) (5061-7001)EACH8$1,750.00$1,200.00$1,380.00$1,700.00$1,200.00
208Bbu system (external battery cabinet) (6007-7001)EACH1$11,500$10,600$9,775.00$8,500.00$8,500.00
209RVDS (presence detection only) (6008-7001)EACH4$8,000.00$9,600.00$6,900.00$6,000.00$6,000.00
210RVDS (presence and advance detection) (6008-7003)EACH2$11,500$10,750$8,625.00$7,500.00$7,500.00
211Dead end roadway barricade (6012-7001)LF48$120.00$50.00$185.05$150.00$130.00
212Long channel mount curb sys (remove) (6039-7003)LF351$15.00$5.00$14.25$3.75$5.25
213Prefb PV MK W/wnty type B (W)(6")(solid) (6064-7002)LF7,058$12.50$9.25$9.78$11.00$8.50
214Prefb PV MK W/wnty type B (Y)(6")(solid) (6064-7006)LF7,062$12.50$9.25$9.78$11.00$8.50
215Aluminum electrical cond (#2 XHHW) (6071-7002)LF43,950$4.00$3.25$2.30$2.00$2.00
216Aluminum electrical cond (#6 XHHW) (6071-7003)LF120$2.00$2.55$2.02$1.75$1.75
217Aluminum electrical cond (#8 XHHW) (6071-7004)LF9,720$1.90$2.45$2.02$1.75$1.75
218FL BS(compacted in place)(type A,B or D GR4)(6") (247-7065)SY51,544$27.00$17.00$12.75$26.00$20.00
219Prime coat (MC-30) (310-7004)GAL12,885$8.00$5.00$6.55$5.20$6.00
220D-GR HMA type D PG64-22 (341-7043)TON5,673$181.00$130.00$155.00$200.00$180.00
221SP mixes SP-B PG70-28 (344-7006)TON26,924$201.00$135.00$155.00$170.00$175.00
222Tack coat (344-7077)GAL20,103$8.00$7.75$8.35$5.20$6.00
223Stone-MTRX-asphalt SMA-D sac-A PG76-28 (346-7010)TON8,303$225.00$185.00$201.65$230.00$220.00
224Tack coat (346-7028)GAL13,082$8.00$7.75$8.50$5.20$6.00
225Concrete curb (type III) (529-7004)LF1,150$23.38$21.00$49.00$20.00$30.00
TxDOT contract A00128458: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of August 5, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy