L A Fuller & Sons Construction, LTD.: TxDOT bid record

L A Fuller & Sons Construction, LTD. submitted 71 bids on Texas DOT contracts in the data, from 19 FEB 2020 to 10 NOV 2026, and was the low bidder on 33 of them (46%). When it was not low, its total sat a median +14% above the low bid.

Owner
Texas DOT
Low bid volume
$66,023,792
Latest bid
10 NOV 2026
Data through
19 NOV 2026
71Bids
33Low bids
46Win rate, percent
+14%Median gap to the low bid when not low, 38 bids

By year

YearBidsLow bidsWin rate
20209444%
20215240%
20228450%
202311655%
202412542%
202513538%
202613754%
L A Fuller & Sons Construction, LTD., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Amarillo District401845%
Lubbock District161488%
Childress District1119%
Odessa District300%
Ochiltree100%
L A Fuller & Sons Construction, LTD., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Barricades, signs and traffic handling502-7001MO3713 (35%)$8,100.00$5,000.00
Prime coat (MC-30)310-7004GAL197 (37%)$8.05$6.42
Excavation (roadway)110-7001CY177 (41%)$24.10$20.00
D-GR HMA(SQ) type D PG 64-22 (pickup)8011-6001TON147 (50%)$86.75$83.00
Biodegradable erosion control logs (remove)506-7046LF256 (24%)$1.60$1.40
D-GR HMA type D PG 64-28 (DLVR) site 58011-6023TON96 (67%)$117.30$134.40
D-GR HMA type D PG 64-28 (DLVR) site 68011-6024TON96 (67%)$122.00$144.00
Asphalt concrete pat mat(asppm)(del)(ST1)8012-7097TON66 (100%)$171.00$180.00
Asphalt concrete pat mat(asppm)(del)(ST2)8012-7098TON66 (100%)$175.20$200.44
TMA (stationary)505-7001DAY285 (18%)$444.57$230.00
Removing concrete (driveways)104-7011SY145 (36%)$25.91$21.00
Driveways (concrete)530-7006SY125 (42%)$124.50$110.00
L A Fuller & Sons Construction, LTD., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

L A Fuller & Sons Construction, LTD., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
10 NOV 2026A00224604Childress DistrictASPHALTIC PATCHING MATERIAL, US0287 (Districtwide to Districtwide)2 of 3$125,200+15%
04 NOV 2026A00224395Amarillo DistrictAGGREGATE, SH0070 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets)1 of 3$3,073,285Low, 78% under the second
03 SEP 2026A00184830Amarillo DistrictBridge Replacement, IH 40 (IH 40 AT SH 207 to .)2 of 7$11,103,635+12%
05 AUG 2026A00128458Amarillo DistrictConstruct New Road, SL 335 (NORTH OF FM 2186 to NORTH OF ARDEN ROAD)2 of 5$44,477,635+5.0%
02 JUN 2026A00200068Childress DistrictBridge Replacement, SH 70 (@ Quitaque River to .)9 of 9$6,005,898+76%
21 APR 2026A00220172Lubbock DistrictASPHALTIC PATCHING MATERIAL, US0084 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)1 of 2$446,000Low, 29% under the second
21 APR 2026A00220173Lubbock DistrictASPHALTIC PATCHING MATERIAL, IH0027 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)1 of 2$428,175Low, 23% under the second
21 APR 2026A00220174Lubbock DistrictASPHALTIC PATCHING MATERIAL, IH0027 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)1 of 2$179,250Low, 17% under the second
08 APR 2026A00121395Lubbock DistrictWiden Road - Add Lanes, UPLAND AVE (UPLAND AVENUE, FROM 82ND STREET to 98TH STREET)1 of 5$14,858,178Low
07 APR 2026A00209966Amarillo DistrictPreventive Maintenance, RM 1061 (COULTER ST to BI 40-D)1 of 6$7,487,324Low, 1.0% under the second
04 MAR 2026A00188550Amarillo DistrictRehabilitate Bridge, N HUGHES (N HUGHES ST @ BNSF RR to .)3 of 6$6,211,418+37%
04 FEB 2026A00188551Amarillo DistrictBridge Replacement, IRWIN RD (IRWIN RD @ EAST AMARILLO CREEK to .)1 of 7$1,996,761Low, 8.0% under the second
07 JAN 2026A00208588Childress DistrictWiden Road - Add Shoulders, FM 104 (US 70, North to 10 Miles)7 of 8$8,086,445+29%
09 SEP 2025A00216262Lubbock DistrictBRIDGE REPAIR, IH0027 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)1 of 3$963,871Low, 27% under the second
05 SEP 2025A00127834Amarillo DistrictHighway Improvement, SH 207 (SH 15 IN SPEARMAN to HUTCHINSON COUNTY LINE)5 of 5$15,498,547+24%
04 SEP 2025A00198123Amarillo DistrictConstruct Pedestrian Infrastructure, Various (SL 335 to SS 468)1 of 5$4,015,191Low, 12% under the second
08 AUG 2025A00135479Amarillo DistrictConstruct Pedestrian Infrastructure, FM 1541 (48th AVE to 0.3 MILES SOUTH OF SL 335)2 of 3$11,909,569+1.0%
07 AUG 2025A00216392Amarillo DistrictFLEXIBLE BASE, IH0027 (VARIOUS LOCATIONS ~ SEE PLAN SHEETS to VARIOUS LOCATIONS ~ SEE PLAN SHEETS)3 of 4$2,149,600+25%
01 JUL 2025A00183588Childress DistrictBridge Replacement, FM 94 (@ Draw to .)6 of 7$2,896,756+58%
05 JUN 2025A00135886Childress DistrictBridge Replacement, COUNTY ROAD 20 (@ Lelia Lake Creek to .)10 of 10$1,444,488+51%
15 MAY 2025A00214795Lubbock DistrictASPHALTIC PATCHING MATERIAL, US0062 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)1 of 3$556,900Low, 4.0% under the second
15 MAY 2025A00214796Lubbock DistrictASPHALTIC PATCHING MATERIAL, US0084 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)1 of 3$446,000Low, 15% under the second
15 MAY 2025A00214797Lubbock DistrictASPHALTIC PATCHING MATERIAL, IH0027 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)1 of 3$428,175Low, 18% under the second
02 MAY 2025A00201205Amarillo DistrictConstruct Pedestrian Infrastructure, SH 136 (340' West of Hoyne Ave to 230' East of Canadian Dr)2 of 6$3,458,256+2.0%
04 APR 2025A00121832Lubbock DistrictBridge Replacement, BI 27U (FM 3466 to W 3RD STREET)2 of 6$7,678,802+13%
L A Fuller & Sons Construction, LTD.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy