TxDOT letting results, November 10, 2026
9 contracts let by Texas DOT on November 10, 2026, $4,244,196 in low bids, a median of 3 bidders per contract. On the 9 with an engineer's estimate, the low bid came in under it 5 times; median low bid -1.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 9
- Low bids, total
- $4,244,196
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00222881 | EMULSION, US0069 (Various Locations within to Wood and Van Zandt Counties) | Tyler District | 1 | Ergon Asphalt & Emulsions, Inc. | $905,160 | +24% | TxDOT | ||
| A00223410 | TRAFFIC CONTROL SERVICES, US0290 (Various Highways in West Harris County to Various Highways in West Harris County) | Houston District | 3 | Professional Traffic Control LLC | $765,790 | $1,713,085 | +124% | +32% | TxDOT |
| A00222816 | EMULSION, SH0155 (Various locations to in Smith and Cherokee Counties) | Tyler District | 1 | Ergon Asphalt & Emulsions, Inc. | $635,290 | +12% | TxDOT | ||
| A00223828 | WINTER WEATHER MATERIAL, US0287 (Districtwide to Districtwide) | Childress District | 3 | NSG Logistics, LLC | $597,202 | $885,019 | +48% | 0.0% | TxDOT |
| A00223501 | CRASH CUSHION ATTENUATOR REPAIR, SH0288 (VARIOUS HWYS WITHIN BRAZORIA COUNTY to .) | Houston District | 4 | Rhino Equity, LLC | $539,652 | $564,375 | +5.0% | -4.0% | TxDOT |
| A00224386 | CLEANING AND SWEEPING HIGHWAYS, IH0010 (VARIOUS to VARIOUS) | Odessa District | 1 | Sweeping Corporation of America, LLC | $299,937 | -10% | TxDOT | ||
| A00219095 | MISCELLANEOUS CONCRETE REPAIR, IH0020 (VARIOUS to VARIOUS) | Odessa District | 3 | SCR Civil Construction, LLC | $274,692 | $288,560 | +5.0% | -10% | TxDOT |
| A00223833 | CABLE BARRIER REPAIR, IH0040 (Various Locations ~ See Plans to Various Locations ~ See Plans) | Childress District | 5 | Boen Landscaping & Irrigation, LLC | $117,300 | $119,576 | +2.0% | -1.0% | TxDOT |
| A00224604 | ASPHALTIC PATCHING MATERIAL, US0287 (Districtwide to Districtwide) | Childress District | 3 | Zack Burkett Co. | $109,174 | $125,200 | +15% | -3.0% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.