TxDOT contract A00201205 bid tabulation
Construct Pedestrian Infrastructure, SH 136 (340' West of Hoyne Ave to 230' East of Canadian Dr). Let by Texas DOT on May 2, 2025, Hutchinson, Amarillo District. 6 bids received; low bid $3,406,939 by Westfield Insurance Company, -6.8% against the engineer's estimate of $3,654,451.
- Owner
- Texas DOT
- Letting
- 02 MAY 2025
- Pay items
- 90
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Westfield Insurance Company | $3,406,939 | Low | -7.0% |
| 2 | L A Fuller & Sons Construction, LTD. | $3,458,256 | +2.0% | -5.0% |
| 3 | STX Civil | $3,544,272 | +4.0% | -3.0% |
| 4 | Ti-Zack Concrete, LLC | $3,794,049 | +11% | +4.0% |
| 5 | O. Trevino Construction, LLC | $4,434,333 | +30% | +21% |
| 6 | Gilvin-Terrill, LTD. | $5,444,049 | +60% | +49% |
Engineer's estimate: $3,654,451.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Westfield Insurance Company | 2. L A Fuller & Sons Construction, LTD. | 3. STX Civil | 4. Ti-Zack Concrete, LLC | 5. O. Trevino Construction, LLC | 6. Gilvin-Terrill, LTD. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (driveways) (104-7011) | SY | 568 | $29.00 | $17.60 | $24.20 | $25.00 | $28.10 | $75.00 | $60.00 |
| 2 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 564 | $29.00 | $19.80 | $22.45 | $25.00 | $28.30 | $68.00 | $60.00 |
| 3 | Removing concrete (curb ramp) (104-7015) | SY | 369 | $29.00 | $16.50 | $22.25 | $25.00 | $21.63 | $75.00 | $60.00 |
| 4 | Removing concrete (curb or curb & gutter) (104-7018) | LF | 4,868 | $10.00 | $17.60 | $8.50 | $10.00 | $6.56 | $20.00 | $20.00 |
| 5 | Removing concrete (gutter) (104-7019) | LF | 580 | $10.00 | $9.90 | $8.75 | $10.00 | $13.76 | $23.00 | $20.00 |
| 6 | Removing concrete (miscellaneous) (104-7046) | SY | 273 | $50.00 | $24.20 | $12.15 | $25.00 | $29.23 | $130.00 | $60.00 |
| 7 | Remove (0"-6") TRT/untrt base & asphalt pavement (105-7046) | SY | 5,577 | $20.00 | $5.61 | $15.00 | $10.00 | $21.46 | $21.00 | $40.00 |
| 8 | Rdside amenity (removing) (194-7025) | EACH | 5 | $500.00 | $1,100.00 | $845.00 | $50.00 | $1.10 | $307.00 | $1,000.00 |
| 9 | Concrete pavement (CRCP) (10") (360-7004) | SY | 991 | $175.00 | $99.00 | $163.00 | $325.00 | $146.79 | $225.00 | $250.00 |
| 10 | Cem stabil BKFL (400-7010) | CY | 42 | $650.00 | $385.00 | $195.00 | $200.00 | $283.57 | $171.00 | $750.00 |
| 11 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 56 | $600.00 | $550.00 | $440.00 | $600.00 | $495.00 | $722.00 | $400.00 |
| 12 | Riprap (concrete)(4 in) (432-7001) | CY | 8 | $800.00 | $671.13 | $1,300.00 | $650.00 | $871.23 | $1,682.00 | $1,000.00 |
| 13 | Rail (handrail)(type C) (450-7060) | LF | 36 | $275.00 | $204.60 | $222.95 | $280.00 | $258.50 | $325.00 | $500.00 |
| 14 | RC pipe (CL III)(24 in) (464-7005) | LF | 122 | $170.00 | $165.00 | $306.00 | $115.00 | $201.30 | $410.00 | $700.00 |
| 15 | Junction box(complete)(PJB)(3FTX3FT) (465-7005) | EACH | 2 | $10,000 | $4,973.10 | $9,110.00 | $5,000.00 | $9,328.00 | $7,870.00 | $35,000 |
| 16 | Inlet (complete)(pco)(3FT)(right) (465-7015) | EACH | 1 | $12,000 | $6,627.50 | $10,040 | $9,500.00 | $12,584 | $21,700 | $35,000 |
| 17 | Inlet (complete)(pco)(3FT)(both) (465-7016) | EACH | 1 | $14,000 | $7,315.00 | $10,780 | $9,800.00 | $14,122 | $22,356 | $35,000 |
| 18 | Inlet (complete)(type sidewalk bridge)(mod) (465-7374) | EACH | 3 | $15,000 | $8,800.00 | $13,890 | $10,500 | $16,500 | $19,135 | $35,000 |
| 19 | Set (type I) (24 in) (4: 1) (C) (467-7006) | EACH | 5 | $2,000.00 | $3,221.46 | $4,335.00 | $1,800.00 | $2,750.00 | $5,902.00 | $45,000 |
| 20 | Adjusting manholes (479-7001) | EACH | 3 | $1,500.00 | $1,940.49 | $795.00 | $1,000.00 | $608.00 | $7,000.00 | $3,000.00 |
| 21 | Adjusting manholes (utility box) (479-7004) | EACH | 3 | $1,250.00 | $1,012.00 | $575.00 | $350.00 | $608.00 | $7,000.00 | $4,000.00 |
| 22 | Removing structure (inlet) (496-7002) | EACH | 1 | $2,000.00 | $1,967.63 | $2,210.00 | $500.00 | $1,306.80 | $7,031.00 | $1,000.00 |
| 23 | Removing structure (set) (496-7004) | EACH | 5 | $1,000.00 | $427.35 | $1,875.00 | $150.00 | $1,320.00 | $2,500.00 | $1,000.00 |
| 24 | Removing structure (pipe) (496-7007) | LF | 56 | $100.00 | $138.74 | $79.00 | $12.00 | $55.00 | $340.00 | $15.00 |
| 25 | Mobilization (500-7001) | LS | 1 | $325,000 | $407,440 | $325,230 | $277,000 | $263,303 | $440,000 | $540,000 |
| 26 | Barricades, signs and traffic handling (502-7001) | MO | 9 | $10,000 | $7,150.00 | $6,230.00 | $2,500.00 | $2,200.00 | $24,000 | $58,600 |
| 27 | Portable changeable message sign (503-7002) | EACH | 2 | $5,000.00 | $17,600 | $2,000.00 | $5.00 | $0.11 | $32,782 | $18,500 |
| 28 | TMA (stationary) (505-7001) | DAY | 150 | $200.00 | $237.88 | $20.00 | $5.00 | $0.11 | $200.00 | $500.00 |
| 29 | TMA (mobile operation) (505-7002) | HR | 32 | $110.00 | $78.63 | $10.00 | $5.00 | $0.11 | $85.00 | $95.00 |
| 30 | Sandbags for erosion control (506-7035) | EACH | 32 | $6.00 | $16.83 | $12.00 | $5.00 | $0.11 | $33.00 | $25.00 |
| 31 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 277 | $6.00 | $8.80 | $9.00 | $0.10 | $5.50 | $16.00 | $10.00 |
| 32 | Biodegradable erosion control logs (remove) (506-7046) | LF | 277 | $3.00 | $3.30 | $2.50 | $0.10 | $5.50 | $5.00 | $5.00 |
| 33 | Colored textured concrete (4") (527-7001) | SY | 2,994 | $150.00 | $143.00 | $90.50 | $125.00 | $103.45 | $100.00 | $150.00 |
| 34 | Concrete curb (type II) (529-7002) | LF | 1,925 | $33.00 | $14.66 | $15.80 | $35.00 | $58.88 | $52.00 | $15.00 |
| 35 | Concrete curb & gutter (type II) (529-7009) | LF | 1,156 | $50.00 | $38.19 | $52.70 | $50.00 | $58.88 | $93.00 | $45.00 |
| 36 | Concrete C&G (valley gutter) (529-7019) | LF | 126 | $75.00 | $55.00 | $111.00 | $75.00 | $88.00 | $100.00 | $80.00 |
| 37 | Driveways (concrete) (530-7006) | SY | 4,738 | $140.00 | $101.75 | $124.00 | $110.00 | $124.53 | $115.00 | $150.00 |
| 38 | Concrete sidewalks (4") (531-7001) | SY | 9,118 | $90.00 | $82.50 | $95.20 | $100.00 | $112.85 | $85.00 | $110.00 |
| 39 | Curb ramps (type 1) (531-7015) | SY | 23 | $140.00 | $231.00 | $153.00 | $130.00 | $141.55 | $366.00 | $225.00 |
| 40 | Curb ramps (type 3) (531-7017) | SY | 13 | $155.00 | $412.50 | $233.00 | $130.00 | $141.55 | $286.00 | $225.00 |
| 41 | Curb ramps (type 6) (531-7019) | SY | 17 | $155.00 | $247.50 | $190.00 | $130.00 | $141.55 | $290.00 | $225.00 |
| 42 | Curb ramps (type 7) (531-7020) | SY | 853 | $155.00 | $187.00 | $133.00 | $130.00 | $141.55 | $260.00 | $180.00 |
| 43 | Curb ramps (type 21) (531-7023) | SY | 8 | $155.00 | $247.50 | $372.00 | $130.00 | $141.55 | $545.00 | $350.00 |
| 44 | Concrete sidewalks (special) (type A) (531-7029) | SY | 108 | $155.00 | $143.00 | $719.00 | $350.00 | $1,386.17 | $208.00 | $175.01 |
| 45 | Concrete sidewalks (special) (type B) (531-7030) | SY | 377 | $125.00 | $154.00 | $111.00 | $250.00 | $245.30 | $180.00 | $175.00 |
| 46 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 95 | $11.00 | $24.20 | $16.50 | $26.35 | $11.00 | $32.00 | $15.00 |
| 47 | Conduit (prepare) (618-7090) | LF | 225 | $3.50 | $5.50 | $1.10 | $5.99 | $11.00 | $7.50 | $1.00 |
| 48 | Electrical conductor (no.8) bare (620-7007) | LF | 60 | $3.00 | $4.40 | $3.02 | $4.79 | $5.50 | $6.00 | $3.00 |
| 49 | Electrical conductor (no.6) bare (620-7009) | LF | 85 | $3.50 | $4.40 | $3.30 | $4.79 | $5.50 | $6.00 | $3.00 |
| 50 | Electrical conductor (no.6) insulated (620-7010) | LF | 130 | $2.50 | $4.40 | $3.57 | $4.79 | $5.50 | $6.00 | $3.50 |
| 51 | Electrical conductor (no.2) insulated (620-7016) | LF | 40 | $5.50 | $13.20 | $5.50 | $14.38 | $5.50 | $17.50 | $5.00 |
| 52 | Ground box type D (162922)W/apron (624-7008) | EACH | 1 | $2,000.00 | $2,420.00 | $1,650.00 | $2,635.46 | $1,100.00 | $3,176.00 | $1,500.00 |
| 53 | Ground box type battery (162915)W/apron (624-7012) | EACH | 4 | $2,615.00 | $4,180.00 | $4,400.00 | $4,552.17 | $4,400.00 | $5,487.00 | $4,000.00 |
| 54 | Relocate electrical services (628-7001) | EACH | 1 | $2,495.00 | $5,170.00 | $3,190.00 | $5,630.31 | $4,400.00 | $6,786.00 | $2,000.00 |
| 55 | Aluminum signs (type A) (636-7001) | SF | 311 | $46.00 | $36.30 | $36.30 | $40.00 | $49.50 | $52.00 | $50.00 |
| 56 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 50 | $700.00 | $799.70 | $800.00 | $450.00 | $495.00 | $1,217.00 | $950.00 |
| 57 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 2 | $900.00 | $1,007.60 | $1,007.60 | $450.00 | $495.00 | $1,410.00 | $1,100.00 |
| 58 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 3 | $1,000.00 | $1,012.00 | $1,012.00 | $450.00 | $495.00 | $1,377.00 | $1,075.00 |
| 59 | Install small roadside sign support and assembly type 10BWG(1)SB(P-BM) (644-7010) | EACH | 2 | $900.00 | $1,153.90 | $1,154.00 | $450.00 | $495.00 | $1,537.50 | $1,200.00 |
| 60 | Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012) | EACH | 11 | $900.00 | $1,079.10 | $1,079.10 | $450.00 | $495.00 | $1,473.00 | $1,150.00 |
| 61 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 27 | $400.00 | $797.50 | $797.50 | $250.00 | $385.00 | $1,089.00 | $850.00 |
| 62 | Remove SM RD SN sup&AM (644-7073) | EACH | 8 | $165.00 | $137.50 | $193.45 | $50.00 | $55.00 | $160.00 | $125.00 |
| 63 | Remove delin & object marker assms (658-7078) | EACH | 4 | $20.00 | $16.50 | $129.00 | $10.00 | $110.00 | $19.00 | $15.00 |
| 64 | Pavement sler 24" (666-7352) | LF | 2,591 | $1.00 | $7.70 | $7.70 | $8.39 | $7.70 | $8.50 | $7.00 |
| 65 | Pavement sler (arrow) (666-7353) | EACH | 1 | $82.00 | $137.50 | $137.50 | $149.75 | $137.50 | $145.00 | $125.00 |
| 66 | Pavement sler (word) (666-7354) | EACH | 1 | $112.00 | $165.00 | $165.00 | $179.69 | $165.00 | $174.00 | $150.00 |
| 67 | Prefabricated PM type B (W)(24")(solid) (668-7021) | LF | 2,591 | $17.00 | $38.50 | $38.50 | $41.93 | $36.75 | $41.00 | $35.00 |
| 68 | Prefabricated PM type B (W)(arrow) (668-7023) | EACH | 1 | $752.00 | $770.00 | $770.00 | $838.56 | $770.00 | $813.00 | $700.00 |
| 69 | Prefabricated PM type B (W)(word) (668-7031) | EACH | 1 | $1,000.00 | $1,100.00 | $1,100.00 | $1,197.94 | $1,100.00 | $1,161.00 | $1,000.00 |
| 70 | Eliminating existing PM & markers (24") (677-7008) | LF | 776 | $1.00 | $6.60 | $6.60 | $7.19 | $6.60 | $7.00 | $6.00 |
| 71 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 1 | $20.00 | $137.50 | $137.50 | $149.75 | $137.50 | $145.00 | $125.00 |
| 72 | Eliminating existing PM & markers (word) (677-7015) | EACH | 1 | $20.00 | $165.00 | $165.00 | $179.69 | $165.00 | $174.00 | $150.00 |
| 73 | Pavement surface preparation for marking (24") (678-7008) | LF | 2,591 | $0.50 | $4.40 | $4.40 | $4.79 | $4.40 | $4.50 | $4.00 |
| 74 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 1 | $20.00 | $137.50 | $137.50 | $149.75 | $137.50 | $145.00 | $125.00 |
| 75 | Pavement surface preparation for marking (word) (678-7016) | EACH | 1 | $20.00 | $165.00 | $165.00 | $179.69 | $165.00 | $174.00 | $150.00 |
| 76 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 20 | $450.00 | $342.10 | $440.00 | $372.56 | $440.00 | $449.00 | $400.00 |
| 77 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 8 | $1,050.00 | $941.60 | $825.00 | $1,025.44 | $1,210.00 | $1,236.00 | $600.00 |
| 78 | Traffic signal CBL (type A)(14 AWG)(2 conductor) (684-7028) | LF | 920 | $3.35 | $3.30 | $2.45 | $3.59 | $4.40 | $4.50 | $2.25 |
| 79 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 1,175 | $4.25 | $3.52 | $2.45 | $3.83 | $5.50 | $4.50 | $2.25 |
| 80 | Remove RDSD flash beacon assembly (685-7003) | EACH | 4 | $1,000.00 | $1,210.00 | $3,575.00 | $1,317.73 | $1,375.00 | $1,588.00 | $1,050.00 |
| 81 | Install RDSD FLSH BCN assembly (solar PWRD) (685-7004) | EACH | 4 | $8,000.00 | $6,490.00 | $11,000 | $7,067.84 | $12,600 | $8,518.00 | $7,000.00 |
| 82 | Ins traffic signal PL AM (S)1 arm(28') (686-7029) | EACH | 2 | $13,500 | $18,700 | $16,500 | $20,365 | $17,850 | $24,544 | $14,000 |
| 83 | Ins traffic signal PL AM(S)1 arm(32') (686-7033) | EACH | 2 | $14,000 | $20,130 | $17,600 | $21,922 | $21,000 | $26,242 | $15,000 |
| 84 | Pedestrian pole assembly (687-7001) | EACH | 4 | $4,975.00 | $4,840.00 | $3,630.00 | $5,270.93 | $10,500 | $6,353.00 | $3,200.00 |
| 85 | Pedestrian detect push button (APS) (688-7001) | EACH | 8 | $1,150.00 | $1,430.00 | $1,210.00 | $1,557.32 | $1,650.00 | $1,877.00 | $825.00 |
| 86 | Pedestrian detector controller unit (688-7003) | EACH | 1 | $4,300.00 | $5,830.00 | $6,600.00 | $6,349.07 | $4,950.00 | $7,652.00 | $5,500.00 |
| 87 | Removal of signal head assembly (690-7024) | EACH | 8 | $100.00 | $302.50 | $137.50 | $329.43 | $550.00 | $397.00 | $125.00 |
| 88 | Removal of pedestrian push buttons (690-7030) | EACH | 8 | $300.00 | $101.20 | $55.00 | $110.21 | $55.00 | $133.00 | $50.00 |
| 89 | Ground box (prepare) (6013-7006) | EACH | 4 | $200.00 | $424.60 | $330.00 | $462.41 | $1,650.00 | $557.00 | $300.00 |
| 90 | Ground box W/ apron (adjust) (6013-7008) | EACH | 4 | $1,225.00 | $1,430.00 | $1,108.80 | $1,557.32 | $275.00 | $1,877.00 | $1,008.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 2, 2025. Compiled by Mirage Metrics.