Ti-Zack Concrete, LLC: TxDOT bid record

Ti-Zack Concrete, LLC submitted 199 bids on Texas DOT contracts in the data, from 10 JAN 2020 to 12 NOV 2026, and was the low bidder on 43 of them (22%). When it was not low, its total sat a median +20% above the low bid.

Owner
Texas DOT
Low bid volume
$120,330,876
Latest bid
12 NOV 2026
Data through
19 NOV 2026
199Bids
43Low bids
22Win rate, percent
+20%Median gap to the low bid when not low, 155 bids

By year

YearBidsLow bidsWin rate
202023522%
202118844%
202210440%
202316638%
202421629%
2025581017%
20265348%
Ti-Zack Concrete, LLC, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Amarillo District261142%
Lubbock District18422%
Yoakum District12542%
Odessa District12325%
Waco District10440%
San Antonio District1000%
Bryan District10220%
Paris District9111%
Lufkin District8225%
Corpus Christi District8338%
San Angelo District7229%
Fort Worth District7114%
Ti-Zack Concrete, LLC, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Barricades, signs and traffic handling502-7001MO17880 (45%)$2,750.00$5,000.00
Biodegradable erosion control logs (remove)506-7046LF11062 (56%)$0.78$1.40
Temporary sediment control fence (remove)506-7041LF7649 (64%)$0.11$1.00
TMA (stationary)505-7001DAY7745 (58%)$125.00$230.00
Relocate SM RD SN sup&AM type 10BWG644-7065EACH8839 (44%)$495.00$600.00
Block sodding162-7002SY11136 (32%)$5.50$6.20
Install small roadside sign support and assembly type 10BWG(1)SA(P)644-7001EACH6836 (53%)$497.50$710.00
Adjusting manholes479-7001EACH5330 (57%)$700.00$1,509.74
Curb ramps (type 7)531-7020SY5728 (49%)$134.00$200.00
Adjusting manholes (water valve box)479-7007EACH4926 (53%)$444.00$800.00
Temporary sediment control fence (install)506-7039LF3625 (69%)$1.10$4.00
Remove SM RD SN sup&AM644-7073EACH7824 (31%)$108.95$110.00
Ti-Zack Concrete, LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Ti-Zack Concrete, LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
12 NOV 2026A00222854Amarillo DistrictBRIDGE PREVENTATIVE MAINTENANCE, BI0040D (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets)1 of 7$734,629Low, 8.0% under the second
12 NOV 2026A00223898Amarillo DistrictBRIDGE JOINT CLEANING AND SEALING, IH0040 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets)6 of 14$563,794+84%
10 NOV 2026A00223833Childress DistrictCABLE BARRIER REPAIR, IH0040 (Various Locations ~ See Plans to Various Locations ~ See Plans)3 of 5$169,929+45%
05 NOV 2026A00224313Lubbock DistrictMETAL BEAM GUARD FENCE REPAIR, IH0027 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)4 of 4$358,340+127%
05 NOV 2026A00224315Lubbock DistrictCABLE BARRIER REPAIR, IH0027 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)4 of 4$398,429+34%
04 NOV 2026A00206976Austin DistrictConstruct Pedestrian Infrastructure, RM 12 (Old Kyle Road to FM 3237)5 of 9$1,135,337+19%
04 NOV 2026A00223826Childress DistrictBRIDGE PREVENTATIVE MAINTENANCE, US0287 (Various Locations ~ See Plans to Various Locations ~ See Plans)6 of 16$912,899+30%
03 NOV 2026A00211505Amarillo DistrictBridge Maintenance, IH 27 (IH 27 NB/WESTERN AVE BRG to .)5 of 8$6,578,367+13%
07 OCT 2026A00211436Amarillo DistrictBridge Maintenance, IH 27 (IH 27 NB/SH 217 BRG to .)3 of 5$4,113,614+5.0%
07 OCT 2026A00217419Odessa DistrictInstall/Replace Signs, Various (DISTRICTWIDE to .)3 of 6$1,038,873+15%
22 SEP 2026A00218207Abilene DistrictBRIDGE PREVENTATIVE MAINTENANCE, BI0020R (VARIOUS LOCATIONS to IN THE ABILENE DISTRICT)6 of 12$890,710+30%
03 SEP 2026A00191741Houston DistrictConstruct Pedestrian Infrastructure, FM 3005 (SS 342 (61st Street) to Cove View Blvd)4 of 7$2,396,674+15%
03 SEP 2026A00221262San Angelo DistrictBRIDGE PREVENTATIVE MAINTENANCE, SH0208 (VARIOUS LOCATIONS IN SAN ANGELO DISTRICT to VARIOUS LOCATIONS IN SAN ANGELO DISTRICT)11 of 11$1,790,803+29%
03 SEP 2026A00207181Yoakum DistrictConstruct Pedestrian Infrastructure, US 87 (TROPICAL DRIVE to BU 59T)3 of 7$5,973,905+12%
02 SEP 2026A00206056Wichita Falls DistrictConstruct Pedestrian Infrastructure, BU 287J (City View Dr to SL 11 WFR)2 of 7$1,059,895+3.0%
06 AUG 2026A00194280Waco DistrictConstruct Pedestrian Infrastructure, FM 3470 (SH 201 to IH 14)4 of 8$4,887,385+19%
06 AUG 2026A00206263Odessa DistrictBicycle And Pedestrian Improvements, Various (Champions, Tradewinds, and Deauville to Between Arlington Rd & SH250)2 of 6$2,097,279+1.0%
05 AUG 2026A00206966Paris DistrictConstruct Pedestrian Infrastructure, SH 5 (Newport Drive to Umphress Street)9 of 10$1,275,174+28%
05 AUG 2026A00189667Fort Worth DistrictBicycle And Pedestrian Improvements, Various (Fort Worth District to City of Weatherford)2 of 7$2,358,485+8.0%
29 JUL 2026A00220022Amarillo DistrictBRIDGE PREVENTATIVE MAINTENANCE, IH0040 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets)6 of 7$696,564+60%
02 JUL 2026A00212148Abilene DistrictBicycle And Pedestrian Improvements, FM 3438 (HARTFORD ST to 600 FT N OF LITTLE ELM CREEK)4 of 7$315,071+24%
02 JUL 2026A00213157Wichita Falls DistrictBridge Maintenance, US 281 (At SH 79 SB / FM 369 WB Connector to .)6 of 10$2,016,000+17%
01 JUL 2026A00219976Yoakum DistrictConstruct Pedestrian Infrastructure, FM 155 (IH 10 to Near Northern City Limits of Weimar)7 of 10$1,851,817+14%
03 JUN 2026A00206315Brownwood DistrictConstruct Pedestrian Infrastructure, Various (Various locations in City of Coleman to .)3 of 4$2,696,301+23%
03 JUN 2026A00206853Pharr DistrictConstruct Pedestrian Infrastructure, W FREDDY GONZALEZ DR (On Freddy Gonzalez Dr, from 9th St Ave to Closner Blvd.)5 of 7$597,619+21%
Ti-Zack Concrete, LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy